Agenda... Overview: Tom Barrett, Alyeska President – What happened: Winter shutdown – extraordinary response – What we are doing… Reviewing pipeline reliability.

Slides:



Advertisements
Similar presentations
The Oil Pollution Act of 1990 (OPA)
Advertisements

Oil Pollution Act of 1990 (OPA) By: Casey Marshall Period 4 -On March 24, 1989, shortly after midnight, the oil tanker Exxon Valdez struck Bligh Reef in.
Oil Pollution act Was a response to the Exxon Valdez Incident
FOR OIL AND GAS INDUSTRY W.K.Wimalsiri & T.A.Piyasiri University of Moratuwa.
PAST, PRESENT AND FUTURE Jason Smith, TERA Environmental Consultants February 20, 2014 Simon Fraser University.
Transportation Systems Highway Transportation Characteristics.
Facilitating a Dialog between the NSDI and Utility Companies J. Peter Gomez Manager, Information Requirements, Xcel Energy.
INTERTANKO APRIL Intertanko “Preparing for the Unpredictable” Robert P. Curt ExxonMobil Marine Transportation.
TRANS ALASKA PIPELINE 800 mile Trans Alaska Pipeline system (TAPS) stretches from Prudhoe Bay to Valdez in North America Pipeline Transports crude oil.
CALIFORNIA ENERGY COMMISSION California Energy Commission Spring 2006 Price Spike Report Media Briefing August 15, 2006 Joseph Desmond Undersecretary of.
UK WIR The UK Experience Christopher Royce Anglian Water Services.
Shale Oil The solution to today’s energy problem.
Physical Flow: From Oil Field to Gas Pump. To obtain the oil we use, hundreds of billions of dollars worth of infrastructure are necessary.
Principles of Liquid Flow through Pipelines
1 Resources for Integrity Management Marty Matheson, American Petroleum Institute OPS Public Meeting August 8, 2001 Houston, TX.
THE KEYSTONE XL PIPELINE BY: ZACH HASOULAS. WHAT IS THE PIPELINE? The Keystone XL Pipeline is a proposed extension of the original Keystone Pipeline System.
Transportation Strategy SCMN 4780 Modal Analysis: Pipeline.
FERC and the Development of an Alaska Natural Gas Pipeline Robert J. Cupina, Deputy Director Office of Energy Projects Federal Energy Regulatory Commission.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Pipeline and Hazardous Materials Safety Administration Program.
How does the ocean affect weather?. Ocean water is heated at the equator. Why does it heat up more at the equator than other parts of the world?
Trans-Alaskan Pipeline Private Industry’s Most Expensive Undertaking.
The Changing US Electric Sector Business Model CATEE 2013 Clean Air Through Energy Efficiency Conference San Antonio, Texas December 17, 2013.
Transportation—Managing the Flow of the Supply Chain Lecture 8.
1 Northern Pipelining & Practical Experience Presentation to:APEGGA April 21, 2005 Calgary.
CALIFORNIA ENERGY COMMISSION Alaska Crude Oil Disruption Staff Update California Energy Commission Fuels and Transportation Division Gordon Schremp August.
“The process of moving an item from point A to point B.” “Safe, efficient, reliable, and sustainable movement of persons and goods over time and space”
Laurie Munoz Milwee Middle School. ALASKAN PIPELINE  TAPS (Trans-Alaska Pipeline System)  800 miles of pipeline  Prudhoe Bay to Valdez  Conveys oil.
Crude Oil and Ethanol by Rail: Reducing Risk and Improving Emergency Response.
Åsgard Subsea Gas Compression. Norwegian Petroleum Directorate The Norwegian Petroleum Directorate (Norwegian: Oljedirektoratet) or OD is a Norwegian.
1 TAPS 2013 Overview Presentation to 32 nd USAEE/IAEE North American Conference July 29, 2013 Tom Barrett, President.
Office of Pipeline Safety U. S. Department of Transportation Pipeline and Hazardous Materials Safety Administration
Scientific Research and Offshore Energy Development Walter Cruickshank, Deputy Director Minerals Management Service Energy Policy and Science Research.
Chapter 37 Pipeline Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Explain the.
Office of the Federal Coordinator for Meteorology OFCM ICMSSR – November 2005 Weather Information for Surface Transportation (WIST) Richard Wagoner National.
America’s Natural Gas Utilities’ Distribution Pipelines November 2, 2006 The Connection To the Customer.
Impairments to Water Quality. Module Topics What is Water Quality? What are Pollutants? Types of Water  Stormwater  Wastewater  Process water.
City of Minneapolis 35W Bridge Emergency Response October 25, 2007.
ILLINOIS - RAILTEC Slide 1 © 2013 University of Illinois at Urbana-Champaign. All Rights Reserved Crude Oil Pipeline Transportation Risk Analysis Safety.
Ensuring Success in Integrity Management Marty Matheson American Petroleum Institute July 24, 2002.
Blunting the peak – oil sands supply and peak oil Mike Ashar Executive Vice President Suncor Energy Association for the Study of Peak Oil and Gas Denver.
Earth’s Changing Environment Lecture 9 Fossil Fuel Extraction: Environmental Impacts.
OIL POLLUTION ACT DRAFT YEAR: 1990 TSUKIKO JERGER.
U. S. Department of Transportation Pipeline and Hazardous Materials Safety Administration
2 Coastal and Marine Third Party Damage Incident DATA The data below was compiled from PHMSA, Minerals Management Service, United States Coast Guard and.
Oil Pollution Act (OPA) Signed into law August 1990 This act amends the Clean Water Act (1972) This act is National Law Matt Vedrani.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Oil Spill Response Plans A History Lesson PHMSA Review and Approval.
Office of the Federal Coordinator for Meteorology OFCM Surface Transportation Weather- Related Impact/Priority Data Paul Pisano Mike Campbell WG/WIST Cochairs.
Amended in 1990 National. Overview Of OPA OPA was signed in response to The Oil Pollution Act (OPA) was signed into law in August 1990, largely in response.
Oil Pollution Act of 1990 Draft year: 1990 by the 101 st United States Congress. Amendment years: None; this legislation is national. By, Maddie McMahon.
Unrestricted © Siemens, Inc All rights reserved.Answers for industry. Crude Oil Pipelines Monitoring and Cont rol Siemens O&G Innovations Conference.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration PREVENTION & PREPAREDNESS May 11, 2016 REGIONAL RESPONSE TEAM.
Restoration Under a Future Climate Understanding and managing climate change effects on federal lands Dr. Cynthia West, Director Office of Sustainability.
Development in the Tundra A Case Study of the Trans-Alaskan Pipeline.
Boiler Energy Saver Advanced Boiler Controls. Most boiler controls at present consist of a switch!
1 Gas Supply Preparations September 22, 2004 Columbia Gas of Maryland, Inc. Gas Supply Preparations September 22, 2004 Scott Phelps Director of Gas Procurement.
BUS 508 Week 3 Assignment Production and Operations Management Marathon Oil Check this A+ tutorial guideline at 508/BUS-508-Week-3-Assignment-Production-
Pipeline Safety Date.
Moving Towards Asset Management Excellence
Physical Flow: From Oil Field to Gas Pump
Transportation.
Citizens promoting the environmentally safe operation of the Alyeska terminal and associated tankers.
Transportation.
Human Impact & Sustainability
Oil Pollution Act of 1990 (OPA)
First Nations & The Environment
ENHANCED WINTER ROAD MAINTENANCE WORKSHOP
The Oil Pollution Act of 1990 (OPA)
Presented by thomas j. Haglund, general manager
Name: The Oil Pollution Act of 1990, Draft Year: 1990 by the 101st Congress, Amendment Year: Never Amended, National The act has increased EPA’s control.
The Oil Pollution Act of 1990 (OPA)
Presentation transcript:

Agenda... Overview: Tom Barrett, Alyeska President – What happened: Winter shutdown – extraordinary response – What we are doing… Reviewing pipeline reliability factors – What we need… More oil – reverse declining throughput trends Perspective from Pump Station 1 response: Brendan LaBelle-Hamer, Pump Station 1 Operations & Maintenance Supervisor Response overview: Betsy Haines, Oil Movements Director What challenges lie ahead: Low flow challenges

About Alyeska... Incorporated August 14, 1970, to design, build, operate and maintain the pipeline, pump stations and Valdez Marine Terminal. Owned by five oil pipeline companies. Alyeska personnel and contractors continually monitor and operate TAPS so oil flows safely, efficiently and in an environmentally sound manner. Approximately 12 percent of the nation's domestic oil production is carried on TAPS. 16 billion barrels+ of crude oil transported. 20,000+ tankers loaded. 640,000 barrels throughput per day (December 2010). Oversight by 22 local, state, federal regulators.

Our response... A coordinated response in the days following the discovery of the leak included personnel from Alyeska, TAPS contractors, and state and federal agencies. Together, people worked around the clock to restore operations. At the peak of the response, more than 600 people responded to the incident, including approximately 375 people at Pump Station 1. A complex project of this scale would normally take months of planning and preparation. Crews restored flow in a short timeframe, under very challenging weather conditions. Reviewing pipeline reliability factors

Bypass piping design...

Our response...

Low flow impacts... TAPS was designed as a warm oil pipeline Circumstances have changed: – Throughput and crude oil temperatures continue to decline – At 550,000 barrels/day portions of the pipeline will be at 32°F during the winter months Slower velocities and longer transit times At 1 M Barrels/Day – 9 days Pump Station 1 to Valdez At 600,000 Barrels/Day – 15 days Pump Station 1 to Valdez At 500,000 Barrels/Day – 18 days Pump Station 1 to Valdez At 300,000 Barrels/Day – 30 days Pump Station 1 to Valdez Lower crude oil temperatures Less turbulence with lower flow rates Tendency for separation of water and solids transported with the crude oil Wax deposition Frost heaves

Throughput…

Throughput history…

Wake up call... Adapting to declining throughput rates will affect every corner of our business –from moving the oil, to our infrastructure, to operations at the Valdez Marine Terminal. What happened: – Winter shutdown: extraordinary response by Alaskans to restore operations What we are doing: – Reviewing all pipeline reliability factors – Flawless operations will continue to be our goal What we need: – More oil production into TAPS – Reverse the downtrend of throughput declines