C. Combaret 11/10/ 2008 Status of the DHCAL m2 software C. Combaret IPNL.

Slides:



Advertisements
Similar presentations
Julie Prast, DHCAL Meeting, 24 janvier 2008 La carte DIF pour DHCAL (proto au m 2 et au m 3 ) Sebastien Cap, Julie Prast ( LAPP) Christophe Combaret (IPNL)
Advertisements

PXL RDO System Requirements And meeting goals 11/12/2009BNL_CD-1_SENSOR_RDO - LG1.
April 2006Jean-Sébastien GraulichSlide 1 DAQ Status o Goal for BTF o Status o First results o To be done.
2 July 2003Paul Dauncey - DAQ1 Progress on CALICE DAQ Paul Dauncey Imperial College London, UK.
Readout of TPC with modified ALICE electronics details of current version and pending items ALICE overview New software based on homemade partly existing.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 Interface between Control & Monitoring and DDAQ o Introduction o Some background on DATE o Control Interface.
Micromegas for a DHCAL LAPP, Annecy Catherine Adloff Jan Blaha Sébastien Cap Maximilien Chefdeville Alexandre Dalmaz Cyril Drancourt Ambroise Espagilière.
CALICE – 12/07/07 – Rémi CORNAT (LPC) 1 ASU and standalone test setup for ECAL MAIA BEE project Overview DAQ dedicated Sensor test In situ debug and maintenance.
06/15/2009CALICE TB review RPC DHCAL 1m 3 test software: daq, event building, event display, analysis and simulation Lei Xia.
Tuesday September Cambridge1 GDCC “next replacement of the LDA” Franck GASTALDI.
Taikan Suehara, CALICE DAQ TF, 7 Apr page 1 CALICE DAQ TF meeting Taikan Suehara (Kyushu University, Japan)
C. Combaret TILC april m2 GRPC Acquisition System C. Combaret, IPN Lyon For the EU DHCAL collaboration
C.Combaret, L.Mirabito Lab & beamtest DAQ with XDAQ tools.
14 Sep 2005DAQ - Paul Dauncey1 Tech Board: DAQ/Online Status Paul Dauncey Imperial College London.
C. Combaret 14 jan 2010 SDHCAL DAQ status in lyon C. Combaret, for the IPNL team.
AHCAL electronics. Status and Outlook Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 11th, 2010.
LNL 1 SLOW CONTROLS FOR CMS DRIFT TUBE CHAMBERS M. Bellato, L. Castellani INFN Sezione di Padova.
08/10/2007Julie Prast, LAPP, Annecy1 The DHCAL DIF and the DIF Task Force Julie Prast, LAPP, Annecy.
Catherine Adloff16 June 2009 CALICE Technical Board 1 DHCAL-MICROMEGAS Yannis KARYOTAKIS For the LAPP group.
C. Combaret DIF_GDIF_MDIF_D ASU 6x 24 HR2 ASU USB Hub RPi USB2 DCC SDCC RPi USB 1 hub+Rpi for 4 cassettes 1 DCC for 8 cassettes (1 spare) Trigger.
Features of the new Alibava firmware: 1. Universal for laboratory use (readout of stand-alone detector via USB interface) and for the telescope readout.
M. Chefdeville LAPP, Annecy, France. Introduction  Motivations for a Digital hadronic calorimeter Count hits instead of measuring energy deposits Reduce.
J. Prast, G. Vouters, Arlington, March 2010 DHCAL DIF Status Julie Prast, Guillaume Vouters 1. Future CCC Use in DHCAL Setup 2. Calice DAQ Firmware Implementation.
Dec.11, 2008 ECL parallel session, Super B1 Results of the run with the new electronics A.Kuzmin, Yu.Usov, V.Shebalin, B.Shwartz 1.New electronics configuration.
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
Vincent Boudry LLR, École polytechnique CALICE Collaboration meeting U. of Manchester 08/09/2008 Pre-results for the CERN PS tests of the eDHCAL.
DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE JRA1 Parallel - DAQ Status, Emlyn Corrin, 8 Oct 2007 EUDET Annual Meeting, Palaiseau, Paris DAQ Status.
January 31, MICE DAQ MICE and ISIS Introduction MICE Detector Front End Electronics Software and MICE DAQ Architecture MICE Triggers Status and Schedule.
1 07/10/07 Forward Vertex Detector Technical Design – Electronics DAQ Readout electronics split into two parts – Near the detector (ROC) – Compresses and.
IPHC - DRS Gilles CLAUS 04/04/20061/20 EUDET JRA1 Meeting, April 2006 MAPS Test & DAQ Strasbourg OUTLINE Summary of MimoStar 2 Workshop CCMOS DAQ Status.
A simple Desktop DAQ for U2F readout Ulf jörnmark Physics Dept. Lund Status and plans.
Mathias Reinecke CALICE week Manchester DIF development – Status and Common Approach Mathias Reinecke for the CALICE DAQ and Front-End developers.
09/01/2016James Leaver SLINK Current Progress. 09/01/2016James Leaver Hardware Setup Slink Receiver Generic PCI Card Slink Transmitter Transition Card.
Maurice Goodrick, Bart Hommels EUDET Annual Meeting, Ecole Polytechnique, Paris EUDET DAQ and DIF DAQ overview DIF requirements and functionality.
C. Combaret 27 jan 2010 SDHCAL Power pulsing tests status in lyon C. Combaret, for the IPNL team.
5 June 2002DOM Main Board Engineering Requirements Review 1 DOM Main Board Software Engineering Requirements Review June 5, 2002 LBNL Chuck McParland.
Status & development of the software for CALICE-DAQ Tao Wu On behalf of UK Collaboration.
17-19/03/2008 Frédéric DULUCQ Improvements of ROC chips VFE - ROC.
STAR Pixel Detector readout prototyping status. LBNL-IPHC-06/ LG22 Talk Outline Quick review of requirements and system design Status at last meeting.
CALICE meeting LYON 2009, Hervé MATHEZ Yannick ZOCCARATO 1 PCB DEVELOPMENTS AT IPNL (PCB and ASIC) PCB for 1m2 of RPC with HR2 William TROMEUR, Hervé MATHEZ,
European DHCAL development European DHCAL development CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY Status :
Julie Prast, Calice Electronics Meeting at LAL, June 2008 Status of the DHCAL DIF Detector InterFace Board Sébastien Cap, Julie Prast, Guillaume Vouters.
RD51 GEM Telescope: results from June 2010 test beam and work in progress Matteo Alfonsi on behalf of CERN GDD group and Siena/PISA INFN group.
Maurice Goodrick, Bart Hommels CALICE-UK Meeting, Cambridge CALICE DAQ Developments DAQ overview DIF functionality and implementation EUDET.
14th january 2010 Actual Micromegas USB DAQ ASU and DIF
DHCAL Jan Blaha R&D is in framework of the CALICE collaboration CLIC08 Workshop CERN, 14 – 17 October 2008.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
12/09/2007Julie Prast, LAPP, Annecy1 The DIF Task Force and a focus on the DHCAL DIF Remi Cornat, Bart Hommels, Mathias Reinecke, Julie Prast.
AHCAL Electronics. Status of Integration Mathias Reinecke for the DESY AHCAL developers AHCAL main and analysis meeting Hamburg, July 16th and 17th, 2009.
News from the 1m 2 GRPC SDHCAL collection of slides from : Ch.Combaret, I.L, H.Mathez, J.Prast, N.Seguin, W.Tromeur, G.Vouters and many others.
J.Maalmi, D.Breton – SuperB Workshop – Frascati – September 2010 Electronics for the two-bar test. D.Breton & J.Maalmi (LAL Orsay)
Proto micromegas au LAPP 14 november 2008The DHCAL Board for the m2 and m3 prototype1 ASU DIF Inter DIF terminaison FPC USB Test Vendredi dernier….
DHCAL Acquisition with HaRDROC VFE Vincent Boudry LLR – École polytechnique.
Use of FPGA for dataflow Filippo Costa ALICE O2 CERN
Status of the DHCAL 1m2 GRPC Acquisition
EUDET Elec/DAQ meeting
CALICE DAQ Developments
Calicoes Calice OnlinE System Frédéric Magniette
Integration of CALICE DAQ in common DAQ
Digital Interface inside ASICs & Improvements for ROC Chips
HR3 status.
Firmware Structure Alireza Kokabi Mohsen Khakzad Friday 9 October 2015
Comments on the DAQv2 advancement
Status of the DHCAL DIF Detector InterFace Board
DHCAL PCB STUDY For RPC 1 m2 PCB SOLUTION
The DHCAL DIF Board For the M2 Prototype
ITS combined test seen from DAQ and ECS F.Carena, J-C.Marin
HaRDROC status: (Hadronic RPC Detector Read Out Chip for DHCAL)
State of developments on Readout interface of European DHCAL
AIMS 1- Build SDHCAL prototype of 1m3 as close as possible to the one
Presentation transcript:

C. Combaret 11/10/ 2008 Status of the DHCAL m2 software C. Combaret IPNL

C. Combaret 11/10/ 2008 Status on november 10th, 10AM Setup with : –1 IPNL slab (24 hardrcocs), RPC –2 LAPP slabs (4 hardrocs), Micromegas –3 DIFS connected to the same PC through a USB hub –1 DAQ PC (Dell Poweredge 2950) running SL5 –1 laptop for user interface (OS does not matter)

C. Combaret 11/10/ 2008 Status on november 10th, 10AM What has been tested and works : –All tested DIFs fully functionnal –All Tested slabs fully functionnal with following modifications : Use of buffers on the SLC clock line is mandatory (max nb of hardrocs chained without buffer could not exceed 12) Use of buffers on the Open drains readout lines (transmit_on, dout and ramfull) should be forseen for next slabs A more robust Slab-DIF connector –Both DIF command and register access with XDAQ software –Slow control (tested in all hardrocs) is stable and reliable

C. Combaret 11/10/ 2008 Status on november 10th, 10AM What has been tested and works (2) : –Numerical readout has been tested in following modes : Manual Start Acquisition/Manual Start Readout (Manual Trigger) Automatic Start Acquisition/ Automatic Start Readout (Internal Trigger) Automatic Start Acquisition/ Automatic Stop Readout (« Beam test mode ») Both DIF firmware and XDAQ software stable and reliable (as far as we tested, ie a few continuous hours) Both DIF Firmware and XDAQ software have been tested with trigger rate >1kHz and 128 events per trigger (DAQ levels set to catch noise) –DIF temperature and current consumption monitoring on all DIFs

C. Combaret 11/10/ 2008 Status on november 10th, 10AM What is in progress : –Numerical readout : Trigger counter implementation in the DIF, in the Transmited stream to the DAQ and in the stored data format Online Digital readout monitoring display

C. Combaret 11/10/ 2008 Status on november 10th, 10AM What has not been done yet : –Numerical readout : Software tests of the global state machine for acquisition on all DIFs in parallel  Hope to have time to do it before the end of the beam test –Analog readout tests  will be done with cosmics later –Calibration of hardrocs  will be done with cosmics later –Power pulsing  will be done with cosmics later