THE ECONOMIC FEASIBILITY OF POWER PLANT RETIREMENTS ON THE ENTERGY SYSTEM Presented to the LOUISIANA PUBLIC SERVICE COMMISSION November 9, 2005 Open Session.

Slides:



Advertisements
Similar presentations
Evaluation Independent Monitoring Presented at: LPSC Staffs Technical Conference and ESIs Bidders Conference for the Fall 2006 Limited-Term RFP September.
Advertisements

NARUC 2015 Winter Meeting February 16, 2015 Combined Heat and Power and the Clean Power Plan Bruce Hedman Institute for Industrial Productivity.
Technical Conference Avoided Cost Modeling January 6, 2015.
California Energy Commission Retail Electric Rate Scenarios: Key Drivers and Structure 2015 Integrated Energy Policy Report California Energy Commission.
Tenth Annual Midwest Energy Conference March 7, 2007 How Best Satisfy Midwest Electric Load Growth? Thomas R. Casten Chairman Recycled Energy Development.
Texas Deregulation – A Success Story The ERCOT Market Framework Has Been A Success Implementation  Bilateral Contracts - Participants contract up to 100%
1.  Purpose  To present Staff’s Preliminary Findings on the 2012 Integrated Resource Plans of:  APS – Arizona Public Service Company  TEP – Tucson.
Modeling Choices & Approaches Key Model Outputs: Carbon emissions Other emissions Electricity prices Total electricity system costs Fuel use and diversity.
Energy Efficiency and Arizona’s Energy Future Jeff Schlegel Southwest Energy Efficiency Project (SWEEP) April
Marketing of MicroCHP MicroCHeaP meeting Copenhagen 29 September 2005.
Connecticut’s Energy Future Removing Barriers to Promote Energy Sustainability: Public Policy and Financing December 2, 2004 Legislative Office Building.
CP methodology adapted to Basel Convention Swedish International Development Agency S ESSION 9.B United Nations Environment Program Division of Technology.
LEVELIZED COST OF ENERGY. Summary Levelized costs are calculated as a proxy for the PPA price between a third-party developer and a utility LCOEs amortize.
MD RGGI STUDY January Economic and Energy Impacts from Maryland’s Potential Participation in the Regional Greenhouse Gas Initiative A Study Performed.
Economic Analyses of FPL’s New Nuclear Projects: An Overview Dr. Steven Sim Senior Manager, Resource Assessment & Planning Florida Power & Light Company.
“Specializing in Operational Excellence” Outsourcing Is it right for you? Texas Technology Showcase Houston, Texas March 18, 2003 Integrated Process Solutions.
CHEAPER AND CLEANER: Using the Clean Air Act to Sharply Reduce Carbon Pollution from Existing Power Plants, Delivering Health, Environmental and Economic.
Small Farm Profitability: Is Wind Energy the Answer? 1
The California energy crisis Introduction (Wolak March ‘01) –Wholesale: averaged $33 MWH in 1999, $116 MWH in 2000, $310MWH Jan –Natural gas $3-$4.
1 Regulatory Concepts Related to the Control of NOx and SOx From Fossil- fired Electric Generating Units Air Quality Technical Advisory Committee Meeting.
Utah Schedule 37 Update June 25, Schedule 37 Background Schedule 37 – Published rates for standard power purchase agreements with qualifying facilities.
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 13 Energy Efficiency Module 13: SUPPLY-SIDE MANAGEMENT.
George Bartlett Director, Transmission Operations Economic Transmission Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
Renewable Energy: Legal and Policy Issues Frank Prager Vice President, Environmental Policy Xcel Energy November 20, 2009 Frank Prager Vice President,
Long Term Study Task Force Update to ETWG ERCOT Long-Term Study: Scenarios, New Software, and Emerging Technology Assumptions January 27, 2012.
Valuing Economic Benefits from Transmission Planning ERCOT System Planning March 22, 2006.
ISO New England Regional Update Wholesale Electricity Markets & State Energy Policy Seminar Connecticut Business & Industry Association December 14, 2010.
Dispatches from the Front: The Colorado Clean Air-Clean Jobs Act Platts 5 th Annual Rockies Gas and Oil Conference Ron Binz Public Policy Consulting April.
Consequence of an IC-index Approach. Connecting IC to Shareholder Value Shareholder value = market value The impact of IC is stronger in opportunities.
Presentation to the: Pennsylvania Public Utility Commission Demand-Side Response Working Group December 8, 2006 Gas Utility Decoupling in New Jersey A.
CP methodology adapted to UNFCCC Swedish International Development Agency S ESSION 9.A United Nations Environment Program Division of Technology Industry.
LONG TERM ELECTRICAL SUPPLY PLAN STAFF RESPONSE TO QUESTIONS, ISSUES, AND RECOMMENDATIONS MADE IN NOVEMBER 2004 Presentation to the Gainesville City Commission.
Why is WPL filing a rate case?  Last Base Case Rates were set January, 2007  Cost of our utility investments must be reflected in prices our customers.
THE PJM INTERCONNECTION STATE OF THE MARKET REPORT 2001 Joseph E. Bowring Manager PJM Market Monitoring Unit Federal Energy Regulatory Commission June.
Highlights of AESC 2011 Report Vermont Presentation August 22, | ©2011 Synapse Energy Economics Inc. All rights reserved.
Net Metering Technical Conference Docket No PacifiCorp Avoided Costs October 21, 2008 Presented by Becky Wilson Executive Staff Director Utah.
Investing in America’s Electric Future Morry Markowitz Group Director, External Affairs New Mexico Utility Shareholders Alliance October 7, 2009.
Update - RTOs and Capacity January 28, Purpose of Presentation Update the Commission on issues related to – (1) Ameren Missouri – potential Local.
OVERVIEW OF ISSUES DR AND AMI HELP SOLVE Dr. Eric Woychik Executive Consultant, Strategy Integration, LLC APSC Workshop on DR and AMI.
Strategic Planning for DSM in a Community-owned Utility Presented by Shu-Sun Kwan & Ed Arguello Colorado Springs Utilities 2005 APPA Engineering & Operations.
Renewable Energy and Energy Efficiency Findings and Policy Recommendations of the Air Pollution Prevention Forum Western Regional Air Partnership Board.
DG Toronto Hydro’s Perspective Task Force on Distributed Generation Richard Lü VP, Environment, Health & Safety March 5, 2003.
Economic Planning – Theory and Current Practice Dan Woodfin Director, System Planning Joint PLWG/CMWG Meeting 2/4/2011.
NextEra Energy (NEE) E,S,G Achievements and Goals Largest U.S. producer of renewable energy from the wind and the sun 4 Part approach to lower air emissions.
Regulatory Planning for Supply to GTA & Toronto Areas Presentation to Regulatory Affairs Standing Committee May 14, 2003.
Use of Renewable Energy and Energy Efficiency to Reduce Regional Haze in the West Air Innovations Conference Chicago, Illinois August 10-12, 2004 Rick.
Feasibility Study.
Energy Efficiency Potential in the Wisconsin Industrial Sector A Discussion With the Wisconsin Industrial Energy Group November 6, 2008.
Allocation of CO 2 Emission Allowances in RGGI Dallas Burtraw, Karen Palmer, Danny Kahn Resources for the Future Presentation to RGGI Stakeholder Meeting.
© ABB Group August 23,2010 | Slide 1 MBPC Study – 1 st Load Pocket Preliminary Results for Discussion only Entergy Regional State Committee (ERSC) Southwest.
2015 Mace Advocacy alliance policy conference
Sixth Northwest Conservation & Electric Power Plan CHP in the Sixth Plan?? Jeff King Northwest Power and Conservation Council Generating Resources Advisory.
Long Term Study Task Force Update ERCOT Long-Term Study Scenarios January 13, 2012.
Southern California Edison The San Onofre Nuclear Generating Station April 14, 2011.
Environmental Benefits of Renewable Portfolio Standards in an Age of Coal Plant Retirements September 10 th, 2015 Energy Policy Research Conference Denver,
1 Cross-Cutting Analytical Assumptions for the 6 th Power Plan July 1, 2008.
The Effect of Environmental Regulation upon the Electric Power Industry: A Rating Agency Perspective 23rd February 2005 At the California Public Utility.
Economic Assessment of Implementing the 10/20 Goals and Energy Efficiency Recommendations – Preliminary Results Prepared for : WRAP, AP2 Forum Prepared.
ERCOT – MISO DC Tie Study Comments
IMPROVEMENT OF LARGE-SCALE INDUSTRIAL AUTONOMY BY IMPLEMENTING ENERGY STORAGE TECHNOLOGIES Nicholas Dodds Victor Gandarillas Richard Heelis Andrew Lyden.
Community Choice Aggregation Demonstration Project Marin County Base Case Feasibility Analyses Overview April 5, 2005.
Greenhouse Gas Initiatives: progress and perspective Sandra Meier Environmental Energy Alliance of New York.
Welcome Carol Berrigan Nuclear Energy Institute July 13, 2015.
Viability of Carbon Capture and Sequestration Retrofits for Existing Coal- fired Power Plants under an Emission Trading Scheme CEDM Annual Meeting May.
PJM: Managing Grid Evolution Through Markets
ERCOT – Southern Cross Transmission ROS/WMS Working Group Assignments
Mike Jaske California Energy Commission
New England Economic Partnership James Daly Vice President Energy Supply Energy Market Perspectives Reliable Energy, Competitive Prices and.
Panel Session: Next Generation of Market Machines
Arizona Public Service Company 2012 Renewable Energy Standard Implementation Plan Arizona Corporation Commission Open Meeting August 17, 2011.
Presentation transcript:

THE ECONOMIC FEASIBILITY OF POWER PLANT RETIREMENTS ON THE ENTERGY SYSTEM Presented to the LOUISIANA PUBLIC SERVICE COMMISSION November 9, 2005 Open Session Phil Hayet, J. Kennedy & Associates, Inc. Matt Kahal, Exeter Associates, Inc.

1 STUDY PROCESS Special Counsel – Stone Pigman Walther Wittman, LLC Staff Counsel – Matthew Loftus Study Monitoring Group --Jim Dauphinais (LEUG) --Mark Rossi (sponsoring merchant generators) --Steve Dingle (Entergy Companies) Numerous meetings and technical conferences. Opportunities for comments on both front end and back end. Merchants invited to provide certain data inputs.

2 STATEMENT OF THE PROBLEM Entergy has 14,000 MW of old, inefficient capacity, with 65 percent assigned to ELI/EGS. 17,000 MW more efficient merchant generation, most of which is uncommitted and connected to Entergy grid. SSRP will add 4,000 to 5,000 MW of new capacity to serve projected needs, but no plan to retire any of the old capacity. Entergy generates about 22 million mWh per year from old oil/gas units, about 18 percent of total system supply. Past studies showed enormous savings from a retirement/replacement plan. Claimed Solution: Allow merchant units to compete with Entergy’s old inefficient capacity.

3 A REALISTIC STUDY MUST ACCOUNT FOR FOUR FACTORS (1)Entergy’s ability to purchase from economy energy market and displace old generation. (2)The SSRP which adds thousands MW of new capacity, driving down usage of old units. (3)Transmission constraints that force certain old units to operate. (4)New capacity to replace retired capacity comes at a significant cost. --These factors not adequately reflected in past studies.

4 SOURCES OF RETIREMENT SAVINGS --Old, low value units occupy scarce transmission rights. Transfer those rights to higher value units. --Substitute generation from new, efficient units for generation from old units and from economy purchase power. --Avoid certain unit fixed costs incurred at old units (O&M, property taxes, cap adds). But – we must incur a cost to obtain the replacement capacity (Entergy is short on capacity, not surplus).

5 STAFF METHODOLOGY --Search for net savings Four retirement cases: -3,000 MW -2,000 MW -1,300 MW -Retire/replace one major unit in Amite South. --Utilize Entergy planning data and assumptions (including SSRP). --Energy cost impacts measured using Entergy’s Promod IV model. --Fixed costs developed using financial spreadsheet model and Staff judgment on capacity acquisition costs and Staff financial assumptions. --Net savings=Energy savings + avoided O&M of retired units – acquisition costs of new units. W:\2978\mik\Power Plant Slides.ppt

6 PROMOD MODELING --Entergy’s own customized model used for a variety of business and regulatory purposes. --It incorporates system agreement accounting and hence can provide individual operating company results. --Includes substantial transmission detail and generator must run constraints. --Staff’s challenge was to develop a “Base Case” that reflected the reality of its System operations. This required modifications to Promod modeling.

7 RESULTS OF ANALYSIS Retirement scenarios produced energy savings but in many cases this was offset by costs of replacement capacity. 1,300 MW revealed some net savings for System and ELI when acquisition prices were low to medium. High gas sensitivity case (20% increase) resulted in bigger net savings under 1,300 MW retirements under all acquisition prices. Amite South case produced net savings for System, ELI and EGS. Staff was asked to run “SSRP Sensitivity.” This sensitivity increases savings but is subject to different interpretations.

8 EMISSIONS ANALYSIS Not a full environmental impact analysis, restricted to CO 2 and NO X. Conducted for 1,300 MW retirement case as an illustration. NO X savings is about 1,512 tons per year. CO 2 savings is about 425,000 tons per year. Gas savings of about 7.2 million MMBtu per year. (Reduced gas usage helps reduce pressure on gas prices).

9 STAFF RECOMMENDATIONS (1)Whether net savings from retirements can be obtained may depend on market offers for new capacity. Hence, Entergy should “test” retirements as part of an RFP process. Staff study not a retirement blueprint. (1)If retirement is economically justified, the replacement capacity should be reasonably long term. (3)Entergy should proceed expeditiously to plan for a new energy resource in the Amite South subregion. (4)If Entergy incurs a major component failure of an older gas/oil unit (non-RMR) that requires a major capital investment, it should investigate the retirement option before making the investment. (5)Entergy should submit annual reports to Commission on progress to reduce its high cost generation.

10 STAFF RECOMMENDATIONS (Cont’d.) (6)Develop better data on fixed O&M costs that could be saved through retirement. (7)Revisit and correct Promod modeling (8)Entergy should continue to study opportunities to upgrade transmission to potentially mitigate RMR.

11 ADDITIONAL ANALYSIS Additional gas price sensitivities ($10 case has been completed). The $10 case produces a large net savings compared to the “gas sensitivity case” in our study. Clean Air Interstate Rule – little know for certain at this time. Potential compliance investments in certain RMR plants. Transmission upgrades – pursue this issue as part of the Entergy transmission study ordered by the Commission.

12 APPENDIX Net Savings for 1,300 MW Case ($ Millions per year, ) Systemwide Results Acquisition CostBase GasGas Sensitivity$10 Gas Extra Low$16$32$60 Low82453 Medium01645 High(8)837 ELI Results Acquisition CostBase GasGas Sensitivity$10 Gas Extra Low$19$25$39 Low Medium High EGS-LA Results Acquisition CostBase GasGas Sensitivity$10 Gas Extra Low($4)($2)$2 Low(6)(3)0 Medium(8)(5)(2) High(9)(7)(4)