C ESR TA Results October 19, 2010 Mark Palmer for the C ESR TA Collaboration.

Slides:



Advertisements
Similar presentations
Global design effort 2008 DOE/NSF review June 30, 2008 Global design effort Americas Slide 1 CesrTA Status and Planning for FY08-09 David Rubin Mark Palmer.
Advertisements

LEPP, the Cornell University Laboratory for Elementary-Particle Physics, has joined with CHESS to become the Cornell Laboratory for Accelerator-based Sciences.
49th ICFA Advanced Beam Dynamics Workshop October 8 –12, 2010 LEPP, the Cornell University Laboratory for Elementary-Particle Physics, has joined with.
Sep 29 – Oct 3, 2009 LCWA 09 Linear Collider Workshop of the Americas Sept 29 – Oct 4, 2009 Damping Ring R&D updates SLAC Mauro Pivi SLAC Allison Fero.
Single-bunch Instability Simulation in CesrTA Mauro Pivi SLAC and Kiran Sonnad Cornell U. IWLC October 2010 CERN.
Electron Clouds at SLAC Johnny Ng ILC Damping Rings Collaboration Meeting March 4, 2009.
25-26 June, 2009 CesrTA Workshop CTA09 Electron Cloud Single-Bunch Instability Modeling using CMAD M. Pivi CesrTA CTA09 Workshop June 2009.
C ESR TA R&D Program Mark Palmer for the C ESR TA Collaboration May 13, 2010 ILC PAC Meeting - Valencia.
EC R&D at SLAC, KEK, INFN, CERN –Details from KEK, INFN and CERN EC R&D CesrTA –Examples of RFA and SPU studies –Survey of results on mitigations –Buildup.
C ESR TA Mitigation Studies & Inputs for the ILC DR Design October 21, 2010 Mark Palmer for the C ESR TA Collaboration.
ILC08 Chicago November 2008 Summary of Recent Results from SLAC M. Pivi, J. Ng, D. Arnett, G. Collet, T. Markiewicz, D. Kharakh, R. Kirby, F. Cooper,
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
CesrTA Experimental Plan M. Palmer for the CesrTA Collaboration November 17, 2008.
C ESR TA R&D Program & U.S. DR Activities Mark Palmer for the C ESR TA Collaboration June 9, 2010 ILC ART Review - FNAL.
Emittance Measurement Needs for CesrTF M. Palmer Cornell University Laboratory for Elementary-Particle Physics.
March 23, 2010 CMAD a tracking and e-cloud beam instability parallel code (M.Pivi SLAC) Taking MAD(X) optics file at input, thus tracking the beam in a.
Electron cloud in the wigglers of ILC Damping Rings L. Wang SLAC ILC Damping Rings R&D Workshop - ILCDR06 September 26-28, 2006 Cornell University.
CesrTA EC Build-Up and Mitigation Program - Introduction Mark Palmer June 25, 2009.
CesrTA Status Report & R&D Planning Mark Palmer Cornell University April 21, 2010.
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
July 16-17, 2007 Joint NSF/DOE Review of CesrTA Proposal 1 * Mitigation techniques planning still underway with ILC DR group Answer to Questions 1 and.
October 13,2010 WG Meeting Cornell U. Recommendation for Electron Cloud Mitigations in the ILC Damping Ring ILC DR Working Group October 13, 2010 Cornell.
E-cloud studies at LNF T. Demma INFN-LNF. Plan of talk Introduction New feedback system to suppress horizontal coupled-bunch instability. Preliminary.
2008/7/281 ILCDR08 Report - Electron Cloud Session – Univ. Y. Suetsugu, KEK.
Electron Cloud Mitigation Studies at CesrTA Joseph Calvey 10/1/2009.
Compare options: simulations recent history Cloud density near (r=1mm) beam (m -3 ) before bunch passage, values are taken at a cloud equilibrium density.
Compare options: simulations recent history Cloud density near (r=1mm) beam (m -3 ) before bunch passage, values are taken at a cloud equilibrium density.
ILC DR Workshop - KEK December, A new resonance in wiggler simulations: Christine Celata Use POSINST code.
Electron Cloud Growth & Mitigation: In-Situ SEY Measurements Retarding Field Analyzer Studies W. Hartung, J. Calvey, C. Dennett, J. Makita, V. Omanovic.
02/04/2009 AS-TAGL Mtg Global Design Effort 1 CesrTA Update Mark Palmer CLASSE.
Motivation and Overview David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education.
C ESR TA Status Report July 22, 2010 Mark Palmer for the C ESR TA Collaboration.
Cesr-TA Simulations: Overview and Status G. Dugan, Cornell University LCWS-08.
Electron cloud measurements and simulations at CesrTA G. Dugan, Cornell University 4/19/09 TILC09 4/18/09.
Highlights from the ILCDR08 Workshop (Cornell, 8-11 July 2008) report by S. Calatroni and G. Rumolo, in CLIC Meeting Goals of the workshop:
CesrTA Vacuum System Conversion and Operational Experiences Yulin Li for the CesrTA Team Cornell Laboratory for Accelerator-based ScienceS and Education.
CesrTA Status Report Mark Palmer Cornell University September 2, 2009.
CesrTA Electron cloud simulation update ILC 10 Workshop G. Dugan, Cornell 3/28/09 2/24/2016ILC 10 Workshop.
Vacuum System S. Guiducci BTR, LNF 8 July RDR - electron damping ring:
Electron Cloud Issues for the 3.2km Positron Damping Ring Mark Palmer (Cornell University) GDE January 18, 2011 ILC Baseline Assessment Workshop 2 SLAC.
Electron cloud beam dynamics G. Dugan, Cornell University CesrTA Advisory Committee 9/11/12.
CESR Test Accelerator Optics Correction and Tuning Tools David Sagan Cornell University.
WebEx meeting November 17, 2009 ILC Damping Ring Working Group on Electron Cloud LC e- cloud Working Group November 17, 2009.
2nd International Particle Accelerator Conference September 4–9, 2011, San Sebastián, Spain LEPP, the Cornell University Laboratory for Elementary-Particle.
ILC Damping Ring Test Facilities Status Report Mark Palmer Cornell University May 9, 2009 ILC PAC Review, Vancouver.
Damping Ring Session Summary S. Guiducci TILC09 Tsukuba 21 April 2009.
R&D GOALS AND MILESTONES TOWARDS A TECHNICAL DESIGN REPORT TDR (2008) First Intnl. Teleconference Ecloud, Impedance/Instabilities - M. Pivi, SLAC 31 October.
CesrTA Status and Plans Joe Calvey 10/15/08. CesrTA Status and Plans- CLIC08 Introduction CesrTA is a program to reconfigure the CESR storage ring at.
Updates of EC Studies at KEKB 1.EC studies at KEKB 2.Recent results 1.Clearing Electrode 2.Groove surface 3.TiN coating 4.Measurement of EC in solenoid.
3 February 2010 ILC Damping Ring electron cloud WG effort Mauro Pivi SLAC on behalf of ILC DR working group on e- cloud ILC DR Webex Meeting Jan 3, 2010.
Recent ECLOUD07 Workshop in Daegu, S. Korea (~50 participants) –Highlights: Measurements of the surface Secondary Electron Yield (SEY) of samples inserted.
Characterization of the Fast Ion Instability at CesrTA David Rubin Cornell University.
Electron Cloud in the International Linear Collider ILC Mauro Pivi work performed while at SLAC and the ILC Damping Ring Working Group High.
Electron Cloud Experimental Plans at Cesr-TA ILCDR08 - July 10, 2009 G. Dugan Cornell Laboratory for Accelerator-Based Sciences and Education.
45 th ICFA Beam Dynamic Workshop June 8–12, 2009, Cornell University, Ithaca New York Jim Crittenden Cornell Laboratory for Accelerator-Based Sciences.
49th ICFA Advanced Beam Dynamics Workshop. October 8–12, 2010 LEPP, the Cornell University Laboratory for Elementary-Particle Physics, has joined with.
LEPP, the Cornell University Laboratory for Elementary-Particle Physics, has joined with CHESS to become the Cornell Laboratory for Accelerator-based Sciences.
Mark Palmer for the CESRTA Collaboration
Electron Cloud R&D at Cornell ILCDR08--7/8/08
CesrTA Status Report Mark Palmer July 8, 2009.
CesrTA Status and Planning
Detailed Characterization of Vacuum Chamber Surface Properties Using Measurements of the Time Dependence of Electron Cloud Development Jim Crittenden.
RECENT DEVELOPMENTS IN MODELING
Why Study Electron Clouds? Methods and Tools to Study Electron Clouds
J.A.Crittenden, Y.Li, X.Liu, M.A.Palmer, J.P.Sikora (Cornell)
Recent Electron Cloud Studies at CESR and Future Plans
The Proposed Conversion of CESR to an ILC Damping Ring Test Facility
CesrTA Experimental Schedule and Priorities
Electron Clouds at SLAC
R&D GOALS AND MILESTONES TOWARDS A TECHNICAL DESIGN REPORT TDR (2008)
Presentation transcript:

C ESR TA Results October 19, 2010 Mark Palmer for the C ESR TA Collaboration

Outline The C ESR TA R&D Program –Goals & Capabilities –Brief Program Review –Status Overview of Electron Cloud R&D Inputs for the ILC DR Design October 19, 2010IWLC CERN, Geneva, Switzerland2

October 19, 2010IWLC CERN, Geneva, Switzerland3 C ESR TA R&D Goals

October 19, 2010IWLC CERN, Geneva, Switzerland4 CESR Reconfiguration: L0 Modifications CESR C=768 m L0 Region  Experimental Wiggler Straight CLEO detector sub- systems removed 6 wigglers: CESR arcs  0-dispersion straight Region instrumented with EC diagnostics (RFA, vacuum, TE Wave,…) Wiggler chambers with retarding field analyzers and various EC mitigation methods [fabricated at LBNL - CU/SLAC/KEK/LBNL collaboration] L0 Region  Experimental Wiggler Straight CLEO detector sub- systems removed 6 wigglers: CESR arcs  0-dispersion straight Region instrumented with EC diagnostics (RFA, vacuum, TE Wave,…) Wiggler chambers with retarding field analyzers and various EC mitigation methods [fabricated at LBNL - CU/SLAC/KEK/LBNL collaboration] CESR-c/CLEO-c HEP program concluded March 2008

October 19, 2010IWLC CERN, Geneva, Switzerland5 CESR Reconfiguration: L0 Modifications Heliax cables for TE Wave Measurements Installed Diagnostic Wigglers e+e+ Diagnostic Wigglers ‘Resonant BPM’ and Transmission Setup TE Wave Grooved Insert for CesrTA Wiggler Wiggler clearing electrode after shipment from KEK to LBNL

October 19, 2010IWLC CERN, Geneva, Switzerland6 CESR Reconfiguration: L3 Experimental Region CESR C=768 m L3 Region  EC Experimental Region PEP-II EC Hardware: Chicane, upgraded SEY station (in situ operation) Drift and Quadrupole diagnostic chambers NEG test section Upgraded visible synchrotron light diagnostics L3 Region  EC Experimental Region PEP-II EC Hardware: Chicane, upgraded SEY station (in situ operation) Drift and Quadrupole diagnostic chambers NEG test section Upgraded visible synchrotron light diagnostics

October 19, 2010IWLC CERN, Geneva, Switzerland7 CESR Reconfiguration: L3 Experimental Region e+ e- WestEast PEPII Chicane EC VC SEY Station Configured for In Situ SEY Measurements Sample Sample 1: Radial outside Sample 2: 45° from radial outside Instrumented Quadrupole Sample in radiation stripe

October 19, 2010IWLC CERN, Geneva, Switzerland8 CESR Reconfiguration: Arc Regions CESR C=768 m Arc Regions  Utilize space available after wiggler moves Locations to characterize RFA performance Time-resolved measurement capability Two test chamber locations with significant synchrotron radiation flux to characterize various coatings CESR dipole test chamber Arc Regions  Utilize space available after wiggler moves Locations to characterize RFA performance Time-resolved measurement capability Two test chamber locations with significant synchrotron radiation flux to characterize various coatings CESR dipole test chamber

October 19, 2010IWLC CERN, Geneva, Switzerland9 CESR Reconfiguration: Arc Regions 15E/W test chamber design for coating tests Segmented RFA Shielded Pickups Instrumentation test section and instrumented CESR dipole (not shown)

October 19, 2010IWLC CERN, Geneva, Switzerland10 CESR Reconfiguration: X-Ray Lines CESR C=768 m X-Ray Lines  Positron and Electron Beam Size Measurement Windowless (all vacuum) x-ray line Upgrade  single pass measurement capability Dedicated x-ray optics box at start of each line xBSM detectors share space in CHESS experimental hutches X-Ray Lines  Positron and Electron Beam Size Measurement Windowless (all vacuum) x-ray line Upgrade  single pass measurement capability Dedicated x-ray optics box at start of each line xBSM detectors share space in CHESS experimental hutches

October 19, 2010IWLC CERN, Geneva, Switzerland11 CESR Reconfiguration: X-Ray Lines New all-vacuum optics lines installed in collaboration with CHESS: Positron line (shown) deployed summer 2008 Electron line completed summer 2009 UHV Coded Aperture Fresnel Zone Plate Detector: InGaAs Array Single-pass readout Few micron resolution

October 19, 2010IWLC CERN, Geneva, Switzerland12 * Orbit/phase/coupling correction and injection but no ramp and recovery. In all other optics there has been at least one ramp and iteration on injection tuning and phase/coupling correction CESR Reconfiguration: CesrTA Parameters Energy [GeV] No. Wigglers1206 Wiggler Field [T]1.9― QxQx QyQy 9.62 QzQz V RF [MV]8.188  x [nm-rad]  x,y [ms] pp 6.76× ×10 -3  l [mm]  E /E [%] t b [ns]≥4, steps of 2 Range of optics implemented Beam dynamics studies Control photon flux in EC experimental regions E[GeV]Wigglers (1.9T/PM)  x [nm] 1.8*12/ / / / / / / / /290 Lattice Parameters Ultra low emittance baseline lattice IBS Studies

October 19, 2010IWLC CERN, Geneva, Switzerland13 C ESR TA Phase I 2.5 year program Goal: complete all major upgrades by mid-2009  Enable an experimental focus thru 2010 Phase I Complete 240 machine days delivered Planning underway for Phase II

CESR is now configured with –Damping ring layout –4 dedicated EC experimental regions –Upgraded vacuum/EC instrumentation –Energy flexibility from 1.8 to 5.3 GeV Beam Instrumentation –xBSM for positrons and electrons –High resolution digital BPM system –Feedback system upgrade for 4ns bunch spacing is operational EC Diagnostics and Mitigation –~30 RFAs presently deployed –TE wave measurement capability in each experimental region –Time-resolved shielded pickup detectors in 3 experimental locations (2 with transverse information) –20 individual mitigation studies conducted in Phase I 18 chambers 2 sets of in situ SEY measurements Additional studies in preparation for Phase II extension of program Low Emittance Tuning and Beam Dynamics Studies –Operating at our target vertical emittance of 20pm –Studies of EC-induced instability thresholds and emittance growth Tune shifts for 4ns bunch spacing - feedback error signal Courtesy D. Teytelman October 19, 2010IWLC CERN, Geneva, Switzerland14 Status

October 19, 2010IWLC CERN, Geneva, Switzerland15 Collaboration The productivity of the program is determined by the range of collaboration involved: –Vacuum chambers with EC mitigation: CERN, KEK, LBNL, SLAC –Low Emittance Tuning and Associated Instrumentation CalPoly, CERN, Cockcroft, KEK, SLAC –EC Instrumentation FNAL, KEK, LBNL, SLAC –In Situ SEY Station Carleton, FNAL, SLAC –Simulation CERN, KEK, INFN-Frascati, LBNL, Postech, Purdue, SLAC –Technical Systems Checks BNL, CERN, KEK

October 19, 2010IWLC CERN, Geneva, Switzerland16 Overview of EC Studies Simulations: –Code Benchmarking –Modeling EC Build-up RFA Modeling: Local data  EC model parameters of surface TE Wave Modeling: probe regions not accessible to RFA measurements (eg, through length of wiggler) –Coherent tune shifts Characterize integrated EC contributions around ring Constrain EC model parameters Confirm inputs for instability studies –Time-resolved Build-up Characterize the EC model parameters in instrumented regions –Improvements to EC Simulations 3D simulations in wigglers Simulations of SR photon production and scattering –Instabilities and emittance growth Detailed comparisons with data in the ultra low emittance regime Validate projections for the ILC DR Measurements: –RFA and TE Wave studies to characterize local EC growth Wigglers, dipoles, drifts, quadrupoles 2 GeV to 5 GeV studies Variety of bunch train lengths, spacing and intensities Studies with electron and positron beams –Mitigation Comparisons Drift, Quadrupole, Dipole and Wiggler See table on next slide –Tune shift measurements and systematic checks –Time-resolved measurements Important cross-checks of EC models –Instability and emittance growth (w/xBSM) measurements CLOUDLAND ECLOUD POSINST Will touch on a few studies. Further details in WG2 parallel sessions

Mitigation Tests DriftQuadDipoleWigglerVC Fab Al CU, SLAC Cu CU, KEK, LBNL, SLAC TiN on Al CU, SLAC TiN on Cu CU, KEK, LBNL, SLAC Amorphous C on Al CERN, CU NEG on SS CU Solenoid Windings CU Fins w/TiN on Al SLAC Triangular Grooves on Cu CU, KEK, LBNL, SLAC Triangular Grooves w/TiN on Al CU, SLAC Triangular Grooves w/TiN on Cu CU, KEK, LBNL, SLAC Clearing Electrode CU, KEK, LBNL, SLAC October 19, 2010IWLC CERN, Geneva, Switzerland17 = planned = chamber(s) deployed

October 19, 2010IWLC CERN, Geneva, Switzerland TE Wave & RFA Measurements in L0 45-bunch train (14 ns) 1 mrad ≈ 5  e - /m 3 Sensitivity: 1  10 9 e - /m 3 (SNR) 2E-2W (CLEO STRAIGHT ) Processed Cu Pole center TiN Pole Center 45 bunches 14ns spacing 2.2×10 10 /bunch After extended scrubbing Similar performance observed 18

Wiggler Observations IWLC CERN, Geneva, Switzerland19October 19, ” radius Electrode  best performance

Mitigation Performance in Dipoles (e+ & e - ) 1x20 e+, 5.3 GeV, 14ns –810 Gauss dipole field –Signals summed over all collectors –Al signals ÷40 October 19, 2010IWLC CERN, Geneva, Switzerland20 e+ e- Longitudinally grooved surfaces offer significant promise for EC mitigation in the dipole regions of the damping rings

Quadrupole Observations Left: 20 bunch train e+ Right: 45 bunch train e+ Currents higher than expected from “single turn” simulations –Turn-to-turn cloud buildup –Issue also being studied in wigglers Clear improvement with TiN October 19, IWLC CERN, Geneva, Switzerland

15E Drift RFAs October 19, 2010IWLC CERN, Geneva, Switzerland Bare Al vs TiN coating vs amorphous C coating comparisons have been carried out using the Q15E/W test regions a-C and TiN show greater beam-induced vacuum rise than bare Al Preliminary analysis of surface parameters indicates good SEY performance by each of these coatings Comparison tests with other chamber types around the ring 22

Time Resolved Measurements October 19, 2010IWLC CERN, Geneva, Switzerland23 45 bunch train 4ns bunch spacing ~2.3×10 10 e+/bunch Full Train Head of Train Tail of Train Witness Bunch Studies: EC-generating Bunch Trailing Probe Bunch Comparisons with e- and e+ beams are leading to adjustments in our PE model Higher BW Version of CERN Technique Mahners, et al., PRSTAB (2008) Decay of cloud near beam Provides information on  (0)

Coherent Tune Shifts Characterize ring-wide impact of the cloud Measurements of bunch-by-bunch coherent tune shifts: –Along bunch trains and with witness bunches –Positron and electron beams –For a wide range of: Beam energies Emittances Bunch currents Bunch spacings Train lengths Comparison with predictions: POSINST ECLOUD Fit all data  6 EC model parameters: Peak SEY Photon reflectivity Quantum efficiency Rediffused yield Elastic yield Peak secondary energy October 19, 2010 IWLC CERN, Geneva, Switzerland 24

Example: Positron Witness Bunch Study at 2GeV October 19, 2010 IWLC CERN, Geneva, Switzerland 25 Peak SEY Scan Coherent Tune Shifts (1 kHz ~ ), vs. Bunch Number - 21 bunch train, followed by 12 witness bunches - 0.8×10 10 particles/bunch - 2 GeV. - Data (black) compared to POSINST simulations. SEY=2.0 SEY=1.8 SEY=2.2 Train Witnesses

Systematic Studies of Instability Thresholds Spectral methods offer a powerful tool for self-consistent analysis of the onset of instabilities –Tune shifts along train  ring-wide integrated cloud density near beam with minimal bias –Onset of synchrobetatron sidebands allows evaluation of the instability thresholds Have explored a range of conditions during recent runs –Find qualitative agreement with simulations –Detailed data-simulation comparisons underway –A range of parameters explored but additional systematic studies are highly desirable (eg, currents, train configuration, energy,…) October 19, 2010IWLC CERN, Geneva, Switzerland26 dBm (H,V) chrom = (1.33,1.155) Avg current/bunch 0.74 mA

EC-Induced Emittance Growth Measure Bunch-by-Bunch Beam Size –Beam size enhanced at head and tail of train Source of blow-up at head appears to be due to a long lifetime component of the cloud. Bunch lifetime of smallest bunches consistent with observed single bunch lifetimes during LET (Touschek-limited) and with relative bunch sizes. –Beam size measured around bunch 5 corresponds to  y ~ 20pm-rad [  y =11.0  0.2  m,  source =5.8m] October 19, 2010IWLC CERN, Geneva, Switzerland27 0.8×10 10 e+/bunch, Each point: Average of 4K single-turn fits 1.6×10 10 e+/bunch Single Turn Fit Bunch 5 Consistent with onset of instability Consistent with 20 pm-rad Must understand this region Evidence for Long-term Cloud

Simulation of Incoherent  y  Growth & Instabilities CMAD simulation (Pivi, Sonnad) CMAD: tracking and e-cloud beam instability parallel code (M.Pivi SLAC) –Distribute EC in every magnetic element of ring: ~1,000 elements including drift, dipoles, quad, sext, etc. –Apply beam-cloud IP in every element October 19, 2010IWLC CERN, Geneva, Switzerland 28 DC04 lattice: 6.4 km ring 2.5e11 2.2e11 2.0e11 1.7e11 Beam losses Application to ILC DR 1e12 5e11 1e11 5e10 1e10 no cloud C ESR TA C ESR TA Tune Footprint Lattice: cta_2085mev_ Fractional Emittance Growth

C ESR TA Summary I Mitigation performance: –Grooves are effective in dipole/wiggler fields, but challenging to make when size is small –Amorphous C, TiN and NEG show similar levels of EC suppression so each is a potential candidate for DR use TiN and a-C have worse dP/dI than Al chambers at our present level of processing In regions where TiN-coated chambers are struck by wiggler radiation (high intensity and high E c ), we observe significant concentrations of N in the vacuum system –EC suppression with the clearing electrode in the wiggler is significantly better than other options No heating issues have been observed with the wiggler design in either C ESR TA or CHESS operating conditions –Work is in progress to take RFA measurements in chambers with mitigations and convert these to the effective SEY of the chamber surfaces Agreement between data and simulation looks very promising Magnetic field region model requires full inclusion of RFA in simulation –Trapping and build-up of the EC over multiple turns in quadrupole and wiggler chambers Simulation and experimental evidence Further evaluation of impact on the beam is required October 19, 2010IWLC CERN, Geneva, Switzerland29

C ESR TA Summary II Time-resolved studies (shielded pickups) –Being applied to understand SEY at zero incident energy,  (0), which determines EC decay rates –Have shown discrepancies in the PE spectra being used Photon transport models –Detailed 3D simulations show significant differences from models typically used –Important contribution to modeling in regions with high photon rates (arc and wiggler regions) Instabilities and sub-threshold emittance growth –Comparisons now available between data and simulation for instability thresholds –Many consistent features between data and simulation, but considerable analysis work remains –Emittance growth below the threshold for the head-tail instability is a particular point of concern. Potentially will result in a lowering of the acceptable EC density in the positron damping ring. –Follow-on measurements are planned to further clarify emittance growth issues and to allow improved ILC DR projections October 19, 2010IWLC CERN, Geneva, Switzerland30 Results now being analyzed and incorporated into the ILC DR design

Comparison of 6.4 and 3.2 km DR Options antechamber SEY 1.2 SEY 1.4 antechamber Summer 2010 Evaluation Comparison of Single Bunch EC Instability Thresholds for: - 6.4km ring with 2600 bunches - 3.2km ring with 1300 bunches  same average current Both ring configurations exhibit similar performance  3.2km ring (low current option) is an acceptable baseline design choice S. Guiducci, M. Palmer, M. Pivi, J. Urakawa on behalf of the ILC DR Electron Cloud Working Group October 19, IWLC CERN, Geneva, Switzerland

*Drift and Quadrupole chambers in arc and wiggler regions will incorporate antechambers EC Working Group Baseline Mitigation Plan Mitigation Evaluation conducted at satellite meeting of ECLOUD`10 (October 13, 2010, Cornell University) S. Guiducci, M. Palmer, M. Pivi, J. Urakawa on behalf of the ILC DR Electron Cloud Working Group Preliminary C ESR TA results and simulations suggest the presence of sub- threshold emittance growth - Further investigation required - May require reduction in acceptable cloud density  reduction in safety margin An aggressive mitigation plan is required to obtain optimum performance from the 3.2km positron damping ring and to pursue the high current option October 19, IWLC CERN, Geneva, Switzerland