Modernization of the Harris County Flood Control District Flood Warning System Telemetry Network National Flood Warning Workshop Houston, Texas February,

Slides:



Advertisements
Similar presentations
KANSEI TESTBED OHIO STATE UNIVERSITY. HETEREGENOUS TESTBED Multiple communication networks, computation platforms, multi-modal sensors/actuators, and.
Advertisements

Library Website 2.0: Integrating Wiki Software to Enhance Content of the Library's Website Justin Robertson, MLIS, AHIP Judy Burnham, MLS, AHIP Jie Li,
Confidential: All Rights Reserved Web-based Alerting The International Common Alerting Protocol (CAP) provides for a standardized alerting format for all.
SYSTEM-WIDE PROCESS CONTROLS UPGRADE Detroit Water & Sewerage Department.
Alert radio repeater automated backup, failover, recovery David Leader HydroLynx Systems.
Denial of Service in Sensor Networks Anthony D. Wood and John A. Stankovic.
Oracle Data Guard Ensuring Disaster Recovery for Enterprise Data
Lawrence-Douglas County Regional ITS Architecture Update.
Sustainability "meet the needs of the present without compromising the ability of future generations to meet their own needs."
Network Management Overview IACT 918 July 2004 Gene Awyzio SITACS University of Wollongong.
1 10/16/2014 HydroLynx ALERT2 Training How to upgrade your system to use the ALERT2 protocol.
Implementation/Acceptance Testing / 1 Implementation and Acceptance Testing Physical Implementation Criteria: 1. Data availability 2. Data reliability.
1 Alternate Title Slide: Presentation Name Goes Here Presenter’s Name Infrastructure Solutions Division Date GIS Perfct Ltd. Autodesk Value Added Reseller.
ICM San Antonio – IH-10 Corridor Brian Fariello, TxDOT.
Title Month Year John Richmond
H-1 Network Management Network management is the process of controlling a complex data network to maximize its efficiency and productivity The overall.
Systems Integrator Benefits V7. Agenda Product Features  Faster Configuration  Online change deployment to clients  Faster server change deployment.
Tropical Storm Allison & its impact on Harris County
Infrastrucure presentation VZNERRAC PLENARY 11 Railway Infrastructure for the Twenty First Century John Amoore Network Rail and ERRAC.
ITS America 2005 Enhanced Transit Information CIN RTO Consumer Information Network Regional Transit Organization Presented by: Jesus A. Martinez, P.E.
Barracuda Load Balancer Server Availability and Scalability.
ABSTRACT Zirous Inc. is a growing company and they need a new way to track who their employees working on various different projects. To solve the issue.
Active Search / Find a Distributor PTP / PTMP Wireless Backhaul Company Search for Distributors, System Integrators and Service Providers. One Business.
Current Job Components Information Technology Department Network Systems Administration Telecommunications Database Design and Administration.
1 System Models. 2 Outline Introduction Architectural models Fundamental models Guideline.
Communicating Climate and Climate Change Information for Integrated Decision Support at the County and Regional Level Greg Dobson and Jim Fox October 2009.
General Packet Radio Service
Sept. 23 NWC Boston Yes We Can! (We already have in Texas)
OPERATIONAL PROGRAMME
A Case Study in the Deployment of a Web-based Service as a Stakeholder Involvement Tool to Support the Development of a Travel Demand Model 14 th Annual.
Ranga Rodrigo. The purpose of software engineering is to find ways of building quality software.
Capacity Plus Direct Communications Radio Services Ltd.
Construction Report January 19, Projects Track replacement and turf In Progress Walking tracks: Recommendation Water wells March 2010 Bleachers.
CONFIDENTIAL. Reliable Resilient Real-time Flood Warning Network James Logan, OneRain,
A Web-based System for Maintaining a Departmental Personnel List and Telephone Directory Patrick R. Michaud Department of Computing and Mathematical Sciences.
1 - GEC8, San Diego, July 20-22, 2010 Measurement Tools in PlanetLab Europe Tanja Zseby (Fraunhofer FOKUS, Berlin, Germany) (some slides from other OneLab.
` DIVISION OF NEARSHORE RESEARCH TEXAS A&M UNIVERSITY-CORPUS CHRISTI Key Features:  Located on oil production platforms 3 and 15 nautical miles from Port.
A Community Information Management System by Pangea Foundation.
Quality of System requirements 1 Performance The performance of a Web service and therefore Solution 2 involves the speed that a request can be processed.
Storm Monitoring Operations Santa Barbara County Flood Control District Hydrology Division.
Urban Drainage and Flood Control District Urban Drainage and Flood Control District Early flash flood prediction, detection, notification & warning for.
Performance Management
Stream Gages CBRFC Stakeholder Forum July 31, 2012.
IT Priorities Minimize CAPEX Maximize employee productivity Grow the business Add new compute resources real- time to support growth Meet compliance requirements.
Module 9 Planning and Implementing Monitoring and Maintenance.
System/SDWG Update Management Council Face-to-Face Flagstaff, AZ August 22-23, 2011 Sean Hardman.
Jefferson Lab Report Karen S. White 11/14/00. Overview  Status of Jefferson Lab Control System  Work In Progress  Transitioning to Operations.
SCID Master Control 4/22/2014SCID Design Details Presentation1 Handheld Device (Walkie) Master Control (Managie) Data Protocol (Talkie)
Network management Network management refers to the activities, methods, procedures, and tools that pertain to the operation, administration, maintenance,
Challenges in the Next Generation Internet Xin Yuan Department of Computer Science Florida State University
Wikis: tools for collaboration Ace School Librarianship ICT Applications.
BROADCAST MASTER APPLICATION OVERVIEW. Overview Broadcast Master is a complete Channel Management and Ad Sales system providing the ability to manage.
Hands-On Microsoft Windows Server 2008 Chapter 7 Configuring and Managing Data Storage.
Climate Change Threat Sea-Level Rise 1. Potential Impacts from Sea-Level Rise How might our community be impacted by sea-level rise? 2.
David C. Leader Vice President HydroLynx Systems, Inc.
ALERT2 Protocol Performance
Capital Metro Downtown Station Improvements
Communications in Railway Centralized Traffic Control Systems
The Role of Data in Supporting Disaster Response and Recovery
PRESENTATION ON Sky X TECH. SUBMETTED TO:- SUBMETTED BY:-
GPRS GPRS stands for General Packet Radio System. GPRS provides packet radio access for mobile Global System for Mobile Communications (GSM) and time-division.
November 18 July 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Task Group 4e definitions Date.
You’ve lost the hope in it.
Sustainability "meet the needs of the present without compromising the ability of future generations to meet their own needs."
COMMUNICATION SOLUTIONS
NM DEPARTMENT OF TRANSPORTATION (NMDOT) NMDOT E-CITATION
Issues of Scaling LAN Session 4321 SHARE 85 Pat Berastegui-Egen.
Aldine Westfield Stormwater Harris County Flood Control District
STATEL an easy way to transfer data
Presentation transcript:

Modernization of the Harris County Flood Control District Flood Warning System Telemetry Network National Flood Warning Workshop Houston, Texas February, 2012 Don Van Wie, Telos Services R. Chris Roark, Blue Water Design LLC Jeff Lindner and Jim Greeson, Harris Co FCD

HCFCD Flood Warning System 267 Sites 887 Sensors 10 Agencies

Flood Warning System Agencies Harris County Flood Control District Texas Department of Transportation (TxDOT) San Jacinto River Authority Trinity River Authority (Livingston Dam) Sugar Land Pearland Fort Bend County METRO City of Houston Brazoria County

The Telemetry Network ALERT Traffic and Data Losses, July 2, 2010 Does the system have the capacity to handle major events? With 250 rain gages, more than10,000 Reports/Hour is possible

Why do data losses matter? ALERT handles missing rain reports well; accumulator values ‘bridge’ across lost reports Other reports lose timeliness; probability of missing several reports in a row goes up more rapidly than the data loss rate During rapid rise, lost reports can lead to invalidation of good reports that follow

Radio System Changes Added second input frequency – HCFCD changed to new frequency – All other agencies remain on original frequency Combined all data onto one contention-free output channel using ALERT2 concentrators Balanced loading on repeaters

All sites on a single (overloaded) input channel Two repeater output channels required Original Radio Architecture

Updated System Architecture Two gage input channels ALERT Concentration increases capacity

ALERT2 Features Concentration yields tenfold improvement in ALERT throughput Forward error correction TDMA – efficient channel utilization

Time Division Multiple Access Each Concentrator (Repeater) has its own time slot Multiple repeaters use same channel without contention Clocks are synchronized by GPS Freed up one frequency for use as a second gage input channel

Traffic Capacity Has Doubled

The Path Forward Repeaters: Add ability to repeat ALERT2 messages as well as concentrate ALERT messages Begin deployment of ALERT2 gages with TDMA ALERT2 gages will replace ALERT gages as system continues to modernize Each agency can progress independently

ALERT2 Transition Path

ALERT2 Expected Outcomes Capacity to reliably handle severe storm events, hurricanes No corrupted data Complete and timely information.

Challenges Overloaded radio channel Difficult to administer Aging infrastructure Damage from Hurricane Ike

HCFCD Responses Upgraded infrastructure - installed new instrument housings Modernized base station hardware and software Improved operating procedures; maintenance metrics and performance tracking Reconfigured network architecture using ALERT2

New Instrument Housings

Software Upgrades New data collection software and tools – Browser-based, Graphical User Interface – Data visualization, data export Integrated Web access permits staff to work where the storm finds them Two fully redundant, freestanding receiving sites and base stations with data synchronization in real time Extensive reporting tools and performance metrics