Robert M. Arnold Building Fred Hutchinson Cancer Research Center

Slides:



Advertisements
Similar presentations
8621 Georgia Avenue Silver Spring, MD
Advertisements

Modeling of Composite Steel Floors Using GT STRUDL
Structural System Overview
Milton S. Hershey Medical Center Biomedical Research Building Joshua Zolko, Structural Option.
Carl Hubben – Structural Option Ae senior thesis Office Building-G EASTERN UNITED STATES.
The Pennsylvania State University Architectural Engineering Structural Emphasis Advisor: Dr. Andres Lepage Steven Stein ROOSEVELT ISLAND SOUTHTOWN BUILDING.
The Residences Anne Arundel County, Maryland Ryan English Structural Option AE 482 – Senior Thesis Dr. Richard Behr – Faculty Advisor.
Milton S. Hershey Medical Center Biomedical Research Building Joshua Zolko, Structural Option.
Penn State Hershey Medical Center Children’s Hospital Hershey, Pennsylvania Matthew Vandersall Structural Option AE Senior Thesis Dr. Richard Behr.
The University Sciences Building Northeast, USA Final Presentation Chris Dunlay Structural Option Dr. Boothby.
University Health Building Thesis Final Presentation
Frank Burke Structural Option Sallie Mae HQ Reston, VA.
Courtesy of Holbert Apple Associates Georgia Avenue Building Introduction Statistics Gravity System Lateral System Problem Statement & Solution.
LOCKWOOD PLACE BALTIMORE, MARYLAND Monica Steckroth- Structural Option.
360 State Street New Haven  CT  Structural | Sabrina Duk | T. Boothby.
AE SENIOR THESIS APRIL 14 th, 2014 CHRIS DUARTE – STRUCTURAL Dr. THOMAS BOOTHBY ORCHARD PLAZA.
Rockville Metro Plaza II Rockville Pike John Vais | Structural Option PSU AE Senior Thesis 2014 Faculty Advisor – Dr. Hanagan Rockville, Maryland
Hershey Research Park Building One Jonathan Krepps Structural Option Senior Thesis 2013 Faculty Advisor: Dr. Hanagan.
Jonathan Coan AE Senior Thesis April 10, 2012 Weill Cornell Medical Research Building New York, NY Images courtesy of Ennead Architects.
Introduction Connected to existing Benton Hall via skywalk Size: 103,154 SF above grade on 4 levels 82,661 SF below grade parking on 3 levels Cost: $23,651,159.
Nick Szakelyhidi Structural Option Office Building Washington, DC Nick Szakelyhidi Structural Option.
TYPICAL member spot checks & alternate systems design study
AMERICAN EAGLE OUTFITTERS Quantum II Corporate Headquarters Michael Sandretto Spring – 2007 Structural Option.
Southeast View of IRMC West View of IRMC. Presentation Outline Introduction Existing Structure Thesis Goals Structural Depth Lighting Breadth Conclusion.
BRYAN DARRIN SENIOR THESIS PRESENTATION MILLENNIUM HALL DREXEL CAMPUS PHILADELPHIA, PA.
Final Thesis Presentation Washingtonian Center Lee ResslerApril 15, 2008 Faculty Advisor: Dr. Memari.
Duquesne University Forbes Expansion
SEAN BEVILLE STRUCTURAL OPTION ADVISOR: PROF. BOOTHBY APRIL 13, 2009 TEMECULA MEDICAL CENTER “STRUCTURAL SYSTEM OPTIMIZATION” THE DEPARTMENT OF ARCHITECTURAL.
Lancaster, PA Courtyard by Marriott Danielle Shetler - Structural Option Senior Thesis - Spring 2005.
Gateway Plaza Wilmington, DE Elizabeth Hostutler Structural Option.
The Health Care Center Dauphin County, PA Ken Lorenz Penn State University Architectural Engineering Construction Management April 17, 2007.
Mathew Nirenberg AE Senior Thesis Structural Option.
Helios Plaza Houston, TX Advisor - Dr. Hanagan Kevin Zinsmeister Structural Option.
1776 WILSON BOULEVARD ARLINGTON VIRGINIA Penn State University Senior Thesis 2012 Faculty Advisor: Thomas Boothby Joshua Urban Structural Option.
The Towers at the City College of New York Robin Scaramastro - Structural Option - Advisor: Dr. Memari Senior Thesis Final Presentation – Spring 2007.
URS – ARENA DISTRICT OFFICE BUILDING DAVID LEE STRUCTURAL OPTION.
Dan Donecker BAE/MAE – Structural Option Senior Thesis Project 35 West 21 st Street New York, New York.
Howard County General Hospital Patient Tower Addition Columbia, MD Kelly M. Dooley Penn State Architectural Engineering Structural Option.
Whiteland Village Mary Longenecker Structural Option Senior Thesis August 7, 2007.
Ryan Pletz Structural Dr. Hanagan The Pennsylvania State University Department of Architectural Engineering Senior Thesis April 14, 2008.
Senior Thesis 2006 The Pennsylvania State University
Rensselaer, NY Meral Kanik Structural Option Advisor: A.M. Memari April 14, 2008.
Jonathan Goodroad Structural Option 2005 Thesis Penn State AE Delaware State University Administration and Student Services Building.
T IMOTHY H P ARK – S TRUCTURAL O PTION. Building Summary Current Systems Proposal Description Gravity Lateral Other Structural Factors Breadth Options.
 Building Statistics  State-of-the-Art Lab  Chief Medical Examiner  121,000 square feet  5 stories  $45 million project.
Oklahoma University Children’s Medical Office Building Oklahoma City, Oklahoma AE Senior Thesis Final Report April 14, 2014 Jonathan Ebersole Structural.
Park Potomac Office Building “E” Kyle Wagner l Structural Option AE Senior Thesis l Spring 2010 Faculty Consultant l Prof. Kevin Parfitt.
 Building Background  Building Structural System  Problem Statement  Proposed Solution  Structural Investigations  Architectural Impact  Sustainability.
Eastern USA University Academic Center Alexander AltemoseIStructural Option.
Existing Conditions Josh Behun - Structural St. Elizabeth Boardman Hospital Inpatient Facility Boardman, Ohio Faculty Advisor: Dr. Linda Hanagan.
Arts & Humanities Instructional Building Noah J. Ashbaugh Construction Management 2006.
SteelStacks Performing Arts Center Sarah Bednarcik | Structural BAE/MAE Faculty Advisors: Dr. Linda Hanagan & Dr. Ali Memari Spring Thesis 2013Bethlehem,
James C. Renick School of Education PSU AE Senior Thesis 2006 Mick Leso - Structural North Carolina A&T State University - Greensboro.
200 Minuteman Drive New Design for Additional Floors and Vibration Sensitive Equipment Brent Ellmann Structural Option Dr. Linda Hanagan - Consultant.
Michael A. Troxell Structural Option Senior Thesis 2006 The College of Business Administration Northern Arizona University Flagstaff, Arizona.
Biobehavioral Health Building The Pennsylvania State University Daniel Bodde Structural Option Advisor – Heather Sustersic.
THE NORTHBROOK CORPORATE CENTER Redesign of the Lateral Load Resisting System.
Lecture 2 Structural System Overview CVEN Structural Concrete Design January 15, 2003.
Proposal Design of Chevron and Diagonal Braced Frames Ting Wall Façade Green Roof INTRODUCTION, BUILDING STATS, + OVERALL CONCEPT CONCLUSIONS,
Structural Systems Design for a Laramie Office Building
Structural Systems Design of the Lincoln Fire Department Headquarters Michelle Burback Structural Engineering Capstone and Senior Honors Project.
R. Bryan Peiffer– Structural Option AE Senior Thesis 2011 Three PNC Plaza, Pittsburgh Pa.
Integrated Design : Building Scale | Prof. Craig Schwitter, Prof
Pearl Condominiums Philadelphia, PA
CONDOMINIUM TOWER & PARKING
Introduction James W. & Frances G. McGlothlin Medical Education Center
TOWERS CRESCENT BUILDING B Mike Synnott Structural.
Rutgers University Law School Building Addition and Renovation Nathan E. Reynolds Advisor: M. Kevin Parfitt Structural Option The Pennsylvania State.
Project: 250 West Street, Columbus, Ohio
Mitre III Building McLean VA Debra Schroeder Structural Option.
Presentation transcript:

Robert M. Arnold Building Fred Hutchinson Cancer Research Center 1100 Fairview Seattle, Washington 372,503 ft2 $90,825,000 Office Space Parking Garage Laboratories Project Team Architecture Construction Management Mechanical & Electrical Affiliated Engineers Inc. Structural KPFF Consulting Engineers Zimmer Gunsul Frasca Partnership Turner construction Company 2005 Masonry Honor Award LEED Certified Building

Existing Structural System Typical Bay [30’ x 30’] 8 ½” Flat Plate w/ Drop Panels Post-Tensioned Distributed & Banded Tendons Plaza Cast in Place Reinforced Concrete Slab One-Way Slabs w/ Beams Beam Size Varies Gravity System 5th Floor Laboratories 13” Reinforced Concrete Slab Mechanical Level, Roof, & Penthouse Steel Framing W Shape Beams Rectangular HSS Columns

Existing Structural System Reinforced Concrete Shear Walls 20” & 24” thick Special Boundary Elements Braced Frames (Upper Levels) Chevron Braces Lateral System Diagonal Braces X-Braces Seismic Controls Design Base Shear: 5980 kip

Proposed Alternative Structural Design Proposal: Frame Main Portion of Building out of Steel Why?: Reduce Building Mass Improve Constructability Why Not the Entire Building: PLaza & Parking Garage Mechanical, Roof, & Penthouse Main Portion – the most highly occupied. - the garage is below grade - mech above level 5

New Structural System Floor Framing RAM Structural System Typical Live Load: 75 lb/ft2 Composite Beams Typical Sizes W 16 x 26 W 16 x 31 Composite Girders Typical Sizes W 24 x 55 W 21 x 50 Steel Columns Typical Sizes W RAM Structural System

Floor Framing New Structural System Architectural Considerations Columns – maintain location as per original design EXCEPTION: 1 Column addition Minimal Architectural Impact Floor Framing Discontinued @ & below Level 1

Vibrations: Preliminary Analysis 5th Floor – Laboratory Area Evaluation for Walking Excitation ap = 0.00408 < 0.005 Lab Equipment is more sensitive to vibration Second analysis recommended

Braced Frames Concentrically Braced Frames Simplifying the Design Process Grouped Structure down to Level 5 Ordinary Braced Frames Special Braced Frames Columns: W14 Shapes X – Bracing: Rect.HSS columns

Construction Management of Alternative Design Complete Building Cost Estimate was not completed- Steel Alternative Cost was Estimated using Integrate Cost Estimating Steel Alternative Cost was Estimated using Integrate Cost Estimating Overall savings $1.8 million

Background Green Roof Retrofit Rainwater Retention & Detention Benefits Rainwater Retention & Detention Offsets peak runoff from peak rainfall Lower roof surface temperature during summer helps to reduce the urban heat island effect Types of Green Roofs Extensive Semi-intensive Intensive Background Benefits Rainwater Retention & Detention Lower roof surface temperature during summer Helps to reduce the urban heat island effect

Green Roof: Architectural Design Potential Areas for Green Roof Intensive roof area accessible & viewable by the existing roof terrace Extensive upper roof lower roof None stairwells small area with limited access mechanical enclosures skylights plaza Green Roof Design Decision Intensive NONE All Potential Areas

Green Roof: Architectural Design [Gardendrain GR 30] Roof Construction Sedum Planting Layer 6” Roof Lite Extensive MC Root Barrier Hydrotech Gardendrain GR 30 EPDM [ Water Proofing Membrane] Rigid Insulation

Green Roof: Drainage Stormwater Runoff Leader Sizing Design Rainfall: 1 inch/hour Stormwater Runoff Rational Method (Runoff Model) Typical Roof: 0.95 Lawn (Sandy Soil): 0.10 Leader Sizing Based on Projected Area & Percentage of Vertical Surface Areas Does Not consider delayed runoff rate During sustained storm event rate can reach that of typical roof Total Drainage Area: 76,425 ft2 (28) 2 inch Leaders (14) 3 inch Leaders Total Drainage Rate: 19 gpm

Green Roof: Construction Management Cost Analysis [RS Means Renovation & Maintenance] Replacement w/ Ballasted EPDM @ $4.55/ft2 = $253,000 Replacement w/ Green Roof @ $6.47/ft2 = $360,000 Life Cycle [50 year period] Ballasted EPDM: 3 @ $253,000 = $759,000 Extensive Sedum: 1 @ $360,000 = $360,000 Recommendation: Green Roof Installation @ Time of Replacement

Questions ?