Graduate school of Industrial Engineering & Management, National Yunlin University of Science & Technology System Reliability Lab.

Slides:



Advertisements
Similar presentations
Design of Experiments Lecture I
Advertisements

OPSM 301 Operations Management Class 22: Quality: Statistical process control Koç University Zeynep Aksin
Chapter 9A Process Capability and Statistical Quality Control
1 © The McGraw-Hill Companies, Inc., 2006 McGraw-Hill/Irwin Technical Note 9 Process Capability and Statistical Quality Control.
Statistical Process Control Processes that are not in a state of statistical control show excessive variations or exhibit variations that change with time.
1 Manufacturing Process A sequence of activities that is intended to achieve a result (Juran). Quality of Manufacturing Process depends on Entry Criteria.
Adeyl Khan, Faculty, BBA, NSU Quality Control Adeyl Khan, Faculty, BBA, NSU Phases of Quality Assurance 10-2 Figure 10.1 Acceptance sampling Process.
HABEEB HATTAB HABEEB Office: BN-Block, Level-3, Room Ext. No.: 7292 H/P No.:
Chapter 6 - Part 1 Introduction to SPC.
Goal Sharing Team Training Statistical Resource Leaders (2) Peter Ping Liu, Ph D, PE, CQE, OCP and CSIT Professor and Coordinator of Graduate Programs.
INTRODUCTION The need to have a capable and stable process is increasing as specifications and customers’ requirements are getting more stringent and.
Agenda Review homework Lecture/discussion Week 10 assignment
 Variable - a single quality characteristic that can be measured on a numerical scale.  When working with variables, we should monitor both the mean.
Multi-criteria Design of X-bar control chart Zhaojun (Steven) Li IND E 516 Homework 1.
Copyright (c) 2009 John Wiley & Sons, Inc.
Chapter 10 Quality Control McGraw-Hill/Irwin
1 © The McGraw-Hill Companies, Inc., 2004 Technical Note 7 Process Capability and Statistical Quality Control.
Operations Management Inventory Management Chapter 12 - Part 2
8-1 Quality Improvement and Statistics Definitions of Quality Quality means fitness for use - quality of design - quality of conformance Quality is.
Statistical Process Control
Control Charts for Variables
Control Chart to Monitor Quantitative Assay Consistency Based on Autocorrelated Measures A. Baclin, M-P. Malice, G. de Lannoy, M. Key Prato GlaxoSmithKline.
15 Statistical Quality Control CHAPTER OUTLINE
X-bar and R Control Charts
Chapter 51Introduction to Statistical Quality Control, 5th Edition by Douglas C. Montgomery. Copyright (c) 2005 John Wiley & Sons, Inc.
Statistical Process Control. Overview 1.Definition of Statistical Process Control 2.Common causes and assignable causes of variation 3.Control charts.
Design and Robustness of Some Statistical Quality Control Tools Dr. Maria Calzada Loyola University New Orleans.
10-1Quality Control William J. Stevenson Operations Management 8 th edition.
Process Capability and SPC
Quality Control McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
1 © The McGraw-Hill Companies, Inc., 2006 McGraw-Hill/Irwin Technical Note 8 Process Capability and Statistical Quality Control.
THE MANAGEMENT AND CONTROL OF QUALITY, 5e, © 2002 South-Western/Thomson Learning TM 1 Chapter 12 Statistical Process Control.
Design of double- and triple-sampling X-bar control charts using genetic algorithms 指導教授: 童超塵 作者: D. HE, A. GRIGORYAN and M. SIGH 主講人:張怡笳.
Statistical Process Control
Introduction to Statistical Quality Control, 4th Edition
Operations Management
Chapter 6. Control Charts for Variables. Subgroup Data with Unknown  and 
ISSPC Rio de Janeiro1 T2 Control Charts with Variable Dimension Eugenio K. Epprecht - PUC-Rio, Brazil Francisco Aparisi – UPV, Spain Omar Ruiz -
Managing Quality CHAPTER SIX McGraw-Hill/Irwin Statistical Process control.
Measure : SPC Dedy Sugiarto.
11/23/2015ENGM 720: Statistical Process Control1 ENGM Lecture 08 P, NP, C, & U Control Charts.
Statistical Quality Control/Statistical Process Control
1 Six Sigma Green Belt Introduction to Control Charts Sigma Quality Management.
Operations Fall 2015 Bruce Duggan Providence University College.
1 © The McGraw-Hill Companies, Inc., Technical Note 7 Process Capability and Statistical Quality Control.
© Copyright McGraw-Hill 2004
Reducing the effect of the autocorrelation on the performance of control charts using sampling strategies Antonio F. B. Costa Brazil Marcela A. G. Machado.
CHAPTER 7 STATISTICAL PROCESS CONTROL. THE CONCEPT The application of statistical techniques to determine whether the output of a process conforms to.
1 SMU EMIS 7364 NTU TO-570-N Control Charts Basic Concepts and Mathematical Basis Updated: 3/2/04 Statistical Quality Control Dr. Jerrell T. Stracener,
Quality Control  Statistical Process Control (SPC)
Dr. Dipayan Das Assistant Professor Dept. of Textile Technology Indian Institute of Technology Delhi Phone:
Attribute charts for monitoring the mean vector of bivariate processes Antonio F. B. Costa UNESP São Paulo State University Linda Lee Ho USP São Paulo.
Quality Control Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 30 1.
Chapter 51Introduction to Statistical Quality Control, 7th Edition by Douglas C. Montgomery. Copyright (c) 2012 John Wiley & Sons, Inc.
Chapter 61Introduction to Statistical Quality Control, 7th Edition by Douglas C. Montgomery. Copyright (c) 2012 John Wiley & Sons, Inc.
Statistical Quality Control
Tech 31: Unit 3 Control Charts for Variables
How to use SPC Before implementing SPC or any new quality system, the manufacturing process should be evaluated to determine the main areas of waste. Some.
Statistical Quality Control, 7th Edition by Douglas C. Montgomery.
Copyright (c) 2005 John Wiley & Sons, Inc.
Process capability in JMP 12 –A new look
Statistical Reasoning in Everyday Life
10 Quality Control.
Agenda Review homework Lecture/discussion Week 10 assignment
ENGM 621: Statistical Process Control
IENG 486: Statistical Quality & Process Control
Process Capability.
Presentation transcript:

Graduate school of Industrial Engineering & Management, National Yunlin University of Science & Technology System Reliability Lab. Economical Statistical Design of Combined Double Sampling and Variable Sampling Interval Joint X-bar and S Control Charts Student: Yi-Chun Chen Advisor: Chau-Chen Torng

YunTech Contents Introduction 1 Literature Review 2 Design of control charts 3 Expect result 4 2

YunTech 1.Introduction 1 Background & Motivation 2 Purposes Introduction Literature Review Design of control charts Expect result 3

YunTech Background & Motivation(1/5) Introduction Literature Review Design of control charts Expect result Manufacturers Product Customers Quantity < Supply < Demand Before Quantity > Supply > Demand New Quality vs Cost Quality vs Cost Source: Business Weekly, vol

YunTech Background & Motivation(2/5)  Statistical Process Control (SPC) Introduction Literature Review Design of control charts Expect result  Shewhart (1924) development X-bar control chart Control charts 5 Source: Montgomery, 2006 μ-3σ μ+3σ μ Out of control

YunTech Background & Motivation(3/5)  Traditional Control chart  Advantage  Easy to operate, Detection large shift is sensitive  Disadvantage  Detection small & medium shift is not sensitive Introduction Literature Review Design of control charts Expect result 6 Control chart S X-bar & S X-bar & R Control chart adaptive

YunTech Background & Motivation(4/5) 7 Introduction Literature Review Design of control charts Expect result Variable Sampling Size Double Sampling Variable Sampling Intervals Control chart Variable Sampling Size & Variable Sampling Intervals Variable Parameters Double Sampling & Variable Sampling Interval Adaptive control chart  Daudin(1992) development DS control chart  Costa(1994) development VSS control chart  Reyonlds (1988)development VSI control chart  Costa (1999)development VP control chart  Costa (1997)development VSSI control chart  Carot (2002)development DSVSI control chart  better than single DS and single VSI control chart

YunTech Background & Motivation(5/5)  On the other hand, cost is very important for Manufacturers.Duncan(1956)construct economic design of control chart, that model purpose is minimize the average unit cost.  The other some researcher find that single economic design of control chart model would made higher false alarm and lower power. Saniga(1989)  economical statistical design of control chart. 8 Introduction Literature Review Design of control charts Expect result

YunTech Purposes 1)Seek appropriate economic model and statistical model used on design of control charts. 2)By the analysis tool to find the best parameters of Economical statistical design of DSVSI X-bar & S control chart. 3)By sensitivity analysis to find the relationship between cost parameters and statistical performance. Introduction Literature Review Design of control charts Expect result 9

YunTech 2.Literature Review 1 Joint X-bar & S control charts 2 Adaptive control chart 3 Design of control chart model Introduction Literature Review Design of control charts Expect result 10

YunTech 2.1 Joint X-bar & S control charts  X-bar control chart  S control chart  Why do we want combination of X-bar and S control chart? Introduction Literature Review Design of control charts Expect result 11 (a)(c)(b) μ0μ0 μ0μ0 μ0μ0 UCLLCLUCLLCLUCLLCL Source: Montgomery,2008 σ0σ0 σ0σ0 σ1σ1 μ1μ1 μ-3σ μ+3σ μ Out of control

YunTech 2.2 Adaptive control chart A.Double Sampling(DS) control chart. B.Variable Sampling Interval(VSI) control chart. C.Double Sampling and Variable Sampling Interval(DSVSI) control chart. Introduction Literature Review Design of control charts Expect result 12

YunTech DS X-bar control chart  Dudin(1992) development DS X-bar control chart. 13 Introduction Literature Review Design of control charts Expect result Action Region Warning Region Central Region Warning Region Action Region Central Region Action Region First stage DS X-bar control chart Second stage DS X-bar control chart Change sampling size

YunTech VSI X-bar control chart  Reyonlds et al. (1988) development VSI X-bar control chart. 14 Introduction Literature Review Design of control charts Expect result Action Region Warning Region Central Region Warning Region Action Region VSI X-bar control chart Change sampling interval

YunTech DSVSI X-bar & S control chart(1/2)  Lee(2012)development DSVSI X-bar&S control chart.  Design background 15 Introduction Literature Review Design of control charts Expect result Lee et al. Joint S and DSVSI  DSVSI S Torng et al. Showed DSVSI X-bar batter than CUSUM  non-normal He et al. Combing DS X-bar and DS S  DS X-bar&S Carot et al. Combing DS X-bar and VSI X-bar  DSVSI X-bar

YunTech DSVSI X-bar & S control chart(2/2) 16 Introduction Literature Review Design of control charts Expect result ARAR WR II WR I CR WR I WR II AR ARAR CR AR ARAR WR II WR I CR ARAR First stage X-bar chartSecond stage X-bar chart First stage S chartSecond stage S chart n h n h n h

YunTech 2.3 Design of control chart model A.Economic design of control chart B.Statistical design of control chart Introduction Literature Review Design of control charts Expect result 17

YunTech Economic design of control chart 18 Introduction Literature Review Design of control charts Expect result τ D gn h/(1-β) 1/λ In control Out of control Cycle start Assignable cause Assignable cause removed Last sampling before Assignable cause First sampling after Assignable cause Lack of control detected Assignable cause located Ν Ν  Duncan(1956)

YunTech Statistical design of control chart  Woodall(1986) find economic design of control chart will have higher false alarm and lower power.  Saniga(1989)development economical statistical design of control chart. 19 Introduction Literature Review Design of control charts Expect result

YunTech 3.Design of control charts 1 Symbol definition & description 2 Model assumptions 3 Modeling Introduction Literature Review Design of control charts Expect result 20

YunTech Sampling size(small)Warning limit to change sampling interval for X-bar Sampling size(big)Warning limit to change sampling interval for S Sampling interval(long)control limit to the first stage X-bar Sampling interval(short)control limit to the first stage S Warning limit to change sampling size for X-bar control limit to the second stage X- bar Warning limit to change sampling size for S control limit to the second stage S Fixed costsFalse alarm costs Variable costsExpected cost of the production defective products, in control Search assignable cause costsExpected cost of the production defective products, out of control Symbol definition & description (1/2) Introduction Literature Review Design of control charts Expect result 21

YunTech Expected sample size of control chart Expected number of assignable cause occur per unit time Expected sample size of process in control The sampling interval h between jth and j+1th sampling, expected time of assignable cause occur Expected sample size of process out of control The sampling interval h 1 between jth and J+1th sampling, expected time of assignable cause occur Expected sampling interval of control chart The sampling interval h 2 between thf and J+1th sampling, expected time of assignable cause occur Expected sampling interval of process in control Expected time of assignable cause occur between jth and j+1th sampling Expected sampling interval of process out of control The average sampling and inspection time is a multiple of the expected size of the number of samples Expected cycle time of control chartSearched assignable cause to removed time, constant Expected cost of cycle time per unitExpected cost of control chart cycle time per unit Symbol definition & description (2/2) 22 Introduction Literature Review Design of control charts Expect result

YunTech 3.2 Model assumptions  The initial state of a process is in control and the mean and standard deviation are μ= μ 0 and σ= σ 0.  When an assignable cause occurs, μ 1 = μ 0 +δμ 0 or σ 1 = γσ 0.  Quality characteristics X is subject to the normal distribution.  The process just have only one assignable cause.  The relationship between assignable cause and process variation time is exponential distribution, the expected value of 1/λ.  Process variation is instantaneous.  The process does not have the ability to repair itself. Introduction Literature Review Design of control charts Expect result 23

YunTech 3.3 Modeling A.Cycle Time Computation B.Cost Model Development C.Statistical Constraints Formulation Introduction Literature Review Design of control charts Expect result 24

YunTech Cycle Time Computation(1/2)  E(nІδ,γ) =n 1 +n 2 ×P(change sampling sizeІδ,γ)  P(change sampling sizeІδ,γ)  A 25 Introduction Literature Review Design of control charts Expect result Second Warring Region

YunTech Cycle Time Computation(2/2) 120120 26 j j+1 h1h1 Introduction Literature Review Design of control charts Expect result h2h2 j j+1

YunTech Cycle Time Computation 27 ζ D GE(n) AATS 1/λ In control Out of control Cycle start Assignable cause Assignable cause removed Last sampling before Assignable cause First sampling after Assignable cause Lack of control detected Assignable cause located Ν Ν 1/λ In control AATS GE(n) D E(T)=1/λ+AATS+GE(n)+D

YunTech E(C) sampling and inspection  Cost Model Development defective products cost  C 0 ×1/λ+C 1 ×AATS False alarm times  α ×s False alarm costs  a 3 ’× α ×s Search assignable cause costs  a 3

YunTech Statistical Constraints Formulation  Min  s.t. 29 S control chart X-bar control chart

YunTech 4.Expect result  The economical statistical design of Combined DSVSI Joint X-bar and S Control Charts optimal combination of parameters obtained by solving tool.  Use sensitivity analysis to find relationship between cost parameters and cost, relationship between cost and statistical performance.  Lorenzen(1986) ±30% Introduction Literature Review Design of control charts Expect result 30 a1a1 a2a2 a3a3 a3’a3’C0C0 C1C1 λGD /60

Graduate school of Industrial Engineering & Management, National Yunlin University of Science & Technology System Reliability Lab.