1 MEPAG 3-4 March, 2009 Doug McCuistion Director, Mars Exploration Program.

Slides:



Advertisements
Similar presentations
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Marine Energy Technology Advancement Partnership (METAP) Hoyt Battey DOE Water.
Advertisements

Plutonium-238 for Solar System Exploration Status Leonard A. Dudzinski Program Executive NASA Headquarters, Washington, DC Presentation to NASA Astronomy.
1 Review of US Human Space Flight Plans Committee Evaluation Measures and Criteria for Humans Spaceflight Options 12 August 2009.
1 Astronomy and Astrophysics Advisory Committee Astrophysics Division FY2008 Budget February 8, 2007 Rick Howard Astrophysics Division Director (acting)
1 LBNL Enterprise Computing (EC) January 2003 LBNL Enterprise Computing.
International Space Station: National Laboratory Development Brad Carpenter Space Operations Mission Directorate NASA Headquarters.
EARTH SCIENCE INITIATIVE to respond to the NRC Decadal Survey, Earth Science and Applications from Space: National Imperatives for the Next Decade and.
SOFIA SSSC Program Status Robert Meyer Program Manager September 29, 2009.
1 Briefing to the CAA on the Terrestrial Planet Finder (TPF): Finding and Characterizing Earth-like Planets Zlatan Tsvetanov, NASA Program Scientist Charles.
USGS Realignment, Science Planning, and FY 2012 Budget Matthew C. Larsen Associate Director Climate and Land Use Change U.S. Department of the Interior.
Senior Review Evaluations (1 of 5) Proposals due: 6 March 2015 Panel evaluations: Week of 22 April 2015 Performance factors to be evaluated will include.
Roadmap Name Strategic Roadmap #n Interim Report April 15, 2005.
The Systems Engineer’s Role in Project Success J. H Rothenberg May 1, 2006.
Mars Program Update James L. Green Acting Director, Mars Exploration Program NASA Headquarters May 13, 2014 NOTE ADDED BY JPL WEBMASTER: This content has.
Program Status Physics of the Cosmos Program (PCOS) Cosmic Origins Program (COR) M. Ahmed Briefing to the PhysPAG January 8, 2012 AAS Meeting, Austin Texas.
BFA Update National Science Foundation Advisory Committee for Business and Operations November 18, 2004 Tom Cooley NSF Chief Financial Officer Director,
Water Supply Planning Initiative State Water Commission November 22, 2004.
GBA IT Project Management Final Project - Establishment of a Project Management Management Office 10 July, 2003.
Mars 2020 Project Matt Wallace Deputy Project Manager August 3, 2015.
1 Investing in America’s Future The National Science Foundation Strategic Plan for FY Advisory Committee for Cyberinfrastructure 10/31/06 Craig.
IMARS History and Phase II Overview Presented to MEPAG 13 May 2014 L. May, NASA HQ NOTE ADDED BY JPL WEBMASTER: This content has not been approved or adopted.
John Peoples for the DES Collaboration BIRP Review August 12, 2004 Tucson1 DES Management  Survey Organization  Survey Deliverables  Proposed funding.
Mars in the Planetary Decadal Survey Steve Squyres Cornell University Chairman, Planetary Science Decadal Survey Steve Squyres Cornell University Chairman,
1 1 Nunn-McCurdy Legislation/Program Impacts Della McPhail Chief Financial Officer 308 ARSW DISTRIBUTION STATEMENT A: Approved for public release; distribution.
Mars Exploration Program Science MEPAG March 17, 2010 Michael Meyer Lead Scientist.
February 5, 2009 Technical Advisory Committee Meeting Texas Nodal Program Implementation: Program Update Trip Doggett.
Mars Exploration Program Response to: Vision and Voyages for Planetary Science in the Decade Michael Meyer MEPAG June 2011 Lead Scientist, Mars.
MATT Report Feb. 20, Philip Christensen (Chair) Lars Borg (ND-SAG Co-Chair) Wendy Calvin (MSO SAG Chair) Mike Carr Dave Des Marais (ND-SAG Co-Chair)
Evaluating New Candidate Landing Sites on Mars: Current orbital assets have set the new standard for data required for identifying and qualifying new Mars.
Draft Modernization Roadmap for the Geospatial Platform Karen Siderelis NGAC Meeting March 25,2010.
MEPAG Meeting February 27 & 28, 2012 Washington, DC Dave Des Marais, MEPAG Chair NOTE ADDED BY JPL WEBMASTER: This content has not been approved or adopted.
Constellation Space Transportation Planning Office July 30, 2009.
MEPAG FEBRUARY 2008 Alan Stern Associate Administrator/SMD Alan Stern Associate Administrator/SMD.
Dr. Richard R. Vondrak Director, Robotic Lunar Exploration Program Science Mission Directorate NASA Headquarters September 2004 NASA Robotic Lunar Exploration.
MEPAG September 2010 Doug McCuistion Director, Mars Exploration Program.
ST5 PDR June 19-20, 2001 NMP 2-1 EW M ILLENNIUM P ROGRA NNMM Program Overview Dr. Christopher Stevens Jet Propulsion Laboratory, California Institute of.
The Mars Exploration Program
PROPOSED 2018 Joint Rover Mission Plans for Proposed 2018 NASA & ESA Joint Rover Mission Landing Site Selection Matt Golombek Mars Exploration Program.
MEPAG July 2009 Doug McCuistion Director, Mars Exploration Program.
1 Douglas Hudgins Exoplanet Exploration Program Scientist Presentation to ExoPAG#8, Denver Colorado October 5, 2013.
Presentation to Membership. A Recap of Our Process February 2009: Decision to renew strategic plan March 2009: Engagement of Berlin, Eaton.
Atlantic Innovation Fund Round VIII February 5, 2008.
Federal Geographic Data Committee Update Ivan DeLoatch NGAC Meeting August 26, 2009.
LISA News from ESA O. Jennrich LISA Project Scientist.
Reusable Launch Vehicle Working Group Commercial Space Transportation Advisory Committee Presented to COMSTAC Meeting George Whitesides, RLVWG Chairman.
Goals for this Meeting: Day 1 Day 2 Update the community on progress in the exploration of Mars, including NASA and the European Space Agency (missions.
2010 Planetary Science Technology Review Interim Report; Assessment Phase National Aeronautics and Space Administration Prepared by the PSTR panel, advisors,
1 Project Priority List (PPL) Update Troy Anderson ERCOT Enterprise Project Portfolio Management January 2011.
MEPAG Meeting October 4, 2012 Monrovia, CA Dave Des Marais, MEPAG Chair NOTE ADDED BY JPL WEBMASTER: This content has not been approved or adopted by,
NASA’s FY 2007 Budget Outlook February 23, 2006 | AIAA National Capital Section Brian Chase, Assistant Administrator for Legislative Affairs.
JWST Mission CDR Northrop Grumman Space Systems Redondo Beach (CA) April 10-16, 2010.
Management February 20, Annual Review of the Muon Accelerator Program (MAP) Subcommittee members: Ron Prwivo, Ron Lutha, and Jim Kerby.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
National Aeronautics and Space Administration February 27, 2013 Defining Potential HEOMD Instruments for Mars 2020 A Work in Progress... NOTE ADDED BY.
Approved For Public Release © The Aerospace Corporation 2009 June 17, 2009 Initial Summary of Human Rated Delta IV Heavy Study Briefing to the Review of.
PPAI Decadal Prediction/Predictability/Variability –Reviewed the WGCM/WGSIP Decadal Prediction Experiment –Reviewed/Revised Decadal WG Prospectus Reviewed.
Helping Teachers Help All Students: The Imperative for High-Quality Professional Development Report of the Maryland Teacher Professional Development Advisory.
PCOS/PhysPAG Town Hall AAS-HEAD, Monterey Richard Griffiths PCOS Program Scientist April 9, 2013 NASA HQ Perspective.
MEPAG: Action Items, Forward Planning Jack Mustard, MEPAG Chair MRO HiRISE / U. Arizona / JPL / NASA NOTE ADDED BY JPL WEBMASTER: This document was prepared.
Jim Bell Cornell University The Planetary Society July 30, 2009 Mars Exploration : Rationale and Principles for a Strategic Program Preliminary.
MEPAG October 4, 2012 Doug McCuistion Director, Mars Exploration Program NOTE ADDED BY JPL WEBMASTER: This content has not been approved or adopted by,
MEPAG Meeting February 27, 2013 web meeting David Des Marais, MEPAG Chair NOTE ADDED BY JPL WEBMASTER: This content has not been approved or adopted by,
PROPOSED STRATEGIC PLANNING PROCESS DECEMBER 3, 2014 Port of Port Angeles.
NASA PLANETARY DATA SYSTEM ARCHIVING IPDA Steering Committee Reta Beebe, Dan Crichton Paris, France July
IV&V Facility 7/28/20041 IV&V in NASA Pre-Solicitation Conference/ Industry Day NASA IV&V FACILITY July 28, 2004.
Current and Future Studies Relevant to MEPAG David H. Smith Mars Program Analysis Group Silver Spring, Maryland 3 March 2016 NOTE ADDED BY JPL WEBMASTER:
Budget and Planning Update
Visions and Voyages: The Planetary Decadal Survey
Preliminary Project Execution Plan
Presentation transcript:

1 MEPAG 3-4 March, 2009 Doug McCuistion Director, Mars Exploration Program

2 Agenda Recent Accomplishments and News MSL Where to from here?

3 Accomplishments & News Phoenix successfully completed primary and extended mission phases –Level 1 objectives accomplished MRO completed primary science mission and is in extended mission –Level 1 objectives accomplished MSL has been a dominating factor since last MEPAG –PSS and NAC reviews and recommendations –Congressional and OMB briefings –(More later) New Frontiers AO coming—Network Science included –A opportunity for Mars exploration –Release this FY National Academies –Decadal Survey preparations underway Chair chosen, panels being assembled (More later) –Planetary Protection for Mars Final stages of review Will go directly to publication in May

4 Accomplishments & News NAC and PSS leadership changing –Ken Ford: Chair of NAC –Jack Burns: Chair of NAC Science Committee –PSS: Sean Solomon’s tour completed, Fran Bangel is expected Chair (acting); Co-Chair TBD ESA joint Mars program under study –Mars exploration in the ESA Science Directorate Government budgets are in flux until new Administration policies in-place –Limited restitution of the Program's budget anticipated between FY09 and FY10 budgets—exact levels currently unknown –FY09 Joint Appropriations Bill reduced Planetary R&A by <8% MEP impact TBD –Unfortunately, MSL has severely impacted those plans Mars-16 Mars Technology Program (focused on MSR) Program reserves (aka flexibility to deal with problems & new investments) –FY10 budget at top-level--no MEP specifics yet

5 MDAP Historical Trends MDAP FY2009 RESULTS: Total # of awards = 30 (out of 88; 35%) Average award = $84.4K

6 MDAP FY2009 Awards ($) By Discipline/Review Group By Organizational Type

7 Mars Science Laboratory Cost History and Replan Status

8 MSL Cost History and Status - 1 New Frontiers in the Solar System: An Integrated Exploration Strategy (2003): Mars Science Laboratory A Science Definition Team (2001) and a Project Science Integration Group (2003) identified high value science opportunities for MSL. Nov. 20, MSL Formulation Authorization Document established the project and a cost target of $865M (RY$) –Exclusive of radioisotope power, focused technology, launch vehicle and mission operations. Note: these equal ~ $550M –Total: $1415 (RY$) May POP-04 estimated MSL life-cycle costs at $1,437M including all mission elements, but did not include “full-cost accounting”. February Preliminary Non-Advocate Review (PNAR) established MSL life-cycle costs at $1,546M including all mission elements and full-cost accounting. –First official estimate presented to the Agency Program Management Council (APMC) “The Mars Exploration Program (MEP) projects development of a Mars Science Laboratory (MSL), presumably a moderate-cost mission, for launch in Its instrument payload has been stated only in the most general terms. The mission may be important, indeed essential, as a technology-demonstration precursor mission to MSR.” Note: A moderate-cost mission was defined as <$650M.

9 MSL Cost History and Status - 2 August Non Advocate Review (NAR) –Official estimate adopted by NASA - Mission Baseline: $1.63B 1Q-2Q FY07 - Continuing Resolution, MEP budget reduction, and Phoenix overguide, forced deferral of some FY07 work into FY08 June 2007 (CDR) - $50-100M overguide predicted Aug - Nov Descope Effort: $36M provided of $75M request December JPL initial overguide request: $91M February 2008 –HQ solved for $190M based on Independent Team CTG of ~$140+M –President’s Budget: Scout-2 (MAVEN) slipped to 2013; FY09-11 funding deleted FY08 - Revised JPL requests totaled $165M October FY09; Revised JPL Request: Add’l $110M –NASA attached conditions wrt schedule/technical progress, & metrics December 2008: NASA slipped launch due to missing progress metrics; technical risk unacceptable

10 Priorities for FY’09 in Re-Plan Priority is to retire critical risks in FY’09 –Actuators and life test; Flight Model deliveries –Resolve Avionics issues and mature FPGA/box designs –Complete development/test of EM SA/SPaH –Conduct a design scrub and resolve open issues –Complete delivery of payload, radar, and MMRTG De-conflict launch queue and related MSL risk –Launch queue acceleration in 2009, ’10 and ‘11 Establish optimum cost, schedule, risk balance for remainder of development

11 Top-Level Schedule Strategy FY09 - Risk Reduction –Retire high risk development issues –Finish hardware builds where feasible FY10 - Delivery & Test –Complete remaining hardware builds –Conduct Rover System Environmental Test Program FY11 - Test & Margin –Complete Launch/Cruise ETP & KSC Operations –Maintain > 4 months margin for additional testing FY11FY10FY09 Design/Problem Closeout Final Hardware Fab Launch Rover Integration Rover ETP L/C Stack & ETP KSC Ops Sys V&V Actuators Avionics Slack

12 MSL Re-Plan Cost Status Cost Status –JPL committed to no additional funding in FY09 Replanning to existing FY09 NOA ($223M) –Prioritized technical risk reduction –Significant, rapid workforce draw-down in progress –FY’10—FY’14 budget increase in the range of $400M FY10-11 add’l budget extends development/test phase FY12 add’l budget for Prime Science Phase operations FY13-14 previously unfunded—now Prime Science Phase ops Detailed estimates in development by JPL

13 MSL Replan Cost Planning Current estimate for 2011 LRD is ~$400M –Covers launch slip and 2 years of MSL operations (FY10-14) –Funding primarily from MEP but there’s a phasing problem Funding Approach –No missions will be cancelled or delayed with the current plan to accommodate needed MSL funds –Mars Program Impacts: Delete Mars technology (FY10-11/MSL and use for Payback) Downsize Mars16 effort—partner with ESA? Reduce Mars operating mission’s end-of-year carry over and program reserves Reduce SMD EDL infrastructure funding (MSL/Mars16/Mara-18 keeps PSD commitment) –Non-Mars Impacts Reduce OPF study effort (down in FY10-11 payback in FY12-13) Rephase without impact: Discovery & New Frontiers reserves, start of the LRO science mission Rephase Juno NASA HQ held reserves Two additional options were presented to the Planetary Science Subcommittee of the NAC –Could be used if additional funding is needed, but only if needed and with PSS concurrence

14 The Path to Approval Dec 22, 2008: Review of FY09 re-plan by SMD, and approval to begin implementation January 9, 2009: Brief NASA Advisory Committee’s Planetary Sciences Subcommittee (PSS) February 3, 2009: Brief NASA Advisory Committee’s Science Subcommittee (NAC-SC) February 17, 2009: SMD AA review of complete re-plan –Delayed from Jan 27th due to re-plan fidelity March –Standing Review Board (SRB) assessment of complete re-plan Technical/schedule, budget, JUNO/MSL/USAF launch conflict April 2009 –April 14 - Science Mission Directorate PMC –April 22 - Agency PMC — approval of go-forward plan - Re-baseline May/June 2009: Submit revised Breach Report with re-plan to Congress (Section 103 of NASA Authorization Act of 2005, aka “Nunn-McCurdy for NASA”)

15 The Next Decade Opportunities to Excel

16 Drivers for Planning the Next Decade What are the driving requirements behind the Program’s baseline content? –MSL slip to 2011 has become a MAJOR driver –National Academy and MEPAG science goals must be supported –MEP architecture must be viable with or without Mars Sample Return –MSR in the 2020’s is the best the budget can support—even then, probably not “alone” What are the drivers for developing Program content? –The mission portfolio must reflect methodical scientific progress and stakeholder expectations—alignment with NRC and MEPAG –Direction from SMD AA to investigate cooperative program with ESA –It must include missions for science and infrastructure Technology development must enable all missions in the portfolio –How do we do this with virtually no technology program left?

17 - Mars Missions - Progression of Capabilities for Mars Exploration KgPathfinder 1994 MGS 1996 MPL 1998 Odyssey 2001 MER 2003 MRO 2005 Phoenix 2007 MSL 2011 Launch Mass 8941, ,0632, ,000 Fuel , Cruise Stage or Orbiter EDL System 230N/A140N/A287N/A Landed Mass 370N/A290N/A348 + rover N/A Mobile Mass 10.6N/A 185N/A 900 Science Instru- ments 8 kg.75 kg on rover 6 instr. (75kg) 3 instr. (45 kg) 5 instr (5.5 kg) 6 instr. (130 kg) 6 instr. (35 kg) 10 instr. (75.5 kg) + MEDLI

18 Community Architecture Priorities MATT-2 Planning Options Option # # Comments 2018a #1 MSR-OMSR-LMSONETScoutMPRFunded if major discovery? 2018b #1 MSOMSR-LMSR-ONETScoutMPRRestarts climate record early; trace gases 2018c #1 MPRMSR-LMSR-OMSONETScoutGap in climate record; telecom? 2020aMPRMSOMSR-LMSR-ONETScoutMPR helps optimize MSR 2020bMPRScoutMSR-LMSR-OMSONETGap in climate record, early Scout 2022aMPRMSONETMSR-LMSR-OScoutEarly NET; MPR helps MSR 2022bMSOMPRNETMSR-LMSR-OScoutEarly NET, but 8 years between major landers (MSL to MPR) 2024aMPRMSONETScoutMSR-LMSR-OEarly NET; 8 years between major landers; late sample return MSO = Mars Science Orbiter MPR = Mars Prospector Rover (MER or MSL class Rover with precision landing and sampling/caching capability) MSR = Mars Sample Return Orbiter (MSR-O) and Lander/Rover/MAV (MSR-L) NET = Mars Network Landers ( “ Netlander ” ) mission FOOTNOTES: #1 Requires early peak funding well above the guidelines #2 Celestial mechanics are most demanding in the 2020 and 2022 launch opportunities, but ATLAS V-551 capabilities presently appear to be adequate

19 The Exploration of Mars Where to From Here? Launch Year MRO Mars Express Collaboration Mars Express Collaboration Odyssey MER & Beyond Operational MAVEN NASA Mars-16 and ESA/ExoMars Collaboration NASA Mars-16 and ESA/ExoMars Collaboration Phoenix (deceased) Phoenix (deceased) Mars Science Lab The Era of Mars Sample Return Under Study 2001-Present

20 ESA-NASA Joint Mars Program A Potential for Expanded Scientific Discovery A new opportunity –Possible joint program with ESA starting with ExoMars in 2016 –Excellent opportunity to prepare for MSR through cooperative missions in –Collaborative studies underway since early January ’09 Joint engineering working group established ESA-NASA Executive Board established at Agency-to-Agency level ESA’s ExoMars is financially undersubscribed and cannot be flown independently MEP’s Mars-16 budget no longer supports a lander –Being responsive to discoveries would imply following-up methane, in addition to refreshing programmatic infrastructure –Architecture similar to MATT Option 2022b is likely needed before “continuing” the decade 2016 orbiter is currently the baseline NASA plan Key NASA requirements established—crucial for such a cooperation –Must address NASA/MEP/NRC science goals –Infrastructure must be maintained (orbiter in 2016 planned) –Immediate focus on ExoMars and ; 2016/18/20 included in planning space –Shared science and science efforts on all missions, including sharing science data –US does EDL in at least one opportunity of (NASA core competency) –US has a surface system in at least one opportunity of (NASA core competency) –US provides an ELV in no more than one opportunity of Completion of feasibility studies planned for end-of-June NASA-ESA Bi-Lateral Meeting

21 Summary/Conclusions MSL has impacted the program significantly, but impact has been minimal outside the Program MSL’s future rests on JPL and the Program’s ability to perform to technical challenges and cost leading up to the 2011 launch –MSL essentially is the Mars Program for the next couple years No help expected from Stimulus or Budget bills—we live within our means An opportunity to expand scientific opportunity could be upon us with a joint ESA-NASA Mars Exploration Program Decadal Survey, and NAC/PSS support of MEP, are extremely important to the Program’s future After many years of tumultuous budgets, MEP is at a crossroads, with excellent Agency and Congressional support, and re- establishment of an exciting and viable Mars Program

22 Backup

23 Current and Projected MEP Budgets FY09 President’s Budget Planetary Science Div. planning budget from FY09 POP Process FY08 Program Budget FY09 Program Budget

24 1.Partnership must address NASA/MEP/NRC as well as ESA, science goals 2.NASA-ESA establish a strategic partnership for Mares exploration in 2016/18/20 and beyond, with immediate focus on ExoMars and Plans must be budgetarily and technically realistic 3a. Develop two plans: what we can afford to do, and the “best” partnership 4.Shared science and science efforts on all missions, including sharing science data 5.Substantial collaboration will create dependencies, and must build on both party’s strengths and strategic interests 6.Missions should be segmented with clean interfaces (ITAR requirements must be complied with as well) 7.US does EDL in at least one opportunity of (NASA core competency) 8.US has a surface system in at least one opportunity of (NASA core competency) 9.US provides an ELV in no more than one opportunity of Shared opportunities require shared credit for outreach, public relations and national/organizational prestige 11.Missions must show identifiable progress toward Mars Sample Return NASA Guiding Principles for ExoMars Cooperation

25 ESA Guiding Principles for ExoMars Cooperation 1.ESA-NASA establish a strategic partnership for Mars exploration in 2016/18/20 and beyond with immediate focus on ExoMars and 2016/18. 2.Shared science and science efforts on all missions, including sharing science data. 3.Missions must show identifiable progress towards MSR. 4.ESA science priority for ExoMars – Exobiology. 5.ESA technology tenants for ExoMars – EDL, Rover, Drilling, Sample Preparation and Distribution. 6.Lead agency to be defined for each mission. For ExoMars (2016), ESA would like to be lead agency. 7.Missions should be segmented with clean interfaces. 8.Need a communications data relay orbiter for 2016 opportunity which could be used as a science opportunity as a secondary objective. 9.Shared opportunities require shared credit for outreach, public relations and national/organisational prestige.

26 ESA-NASA Comparative Guiding Principles for 2016/18/ExoMars Cooperation 1.ESA-NASA establish a strategic partnership for Mars exploration in 2016/18/20 and beyond, with immediate focus on ExoMars and Shared science and science efforts on all missions, including sharing science data 3.Missions must show identifiable progress toward Mars Sample Return 4.ESA science priority for ExoMars—Exobiology 5.ESA technology tenants for ExoMars-EDL, rover, drilling, sample preparation and distribution 6.Lead agency to be defined for each mission. For ExoMars (2016), ESA would like to be the lead agency 7.Missions should be segmented with clean interfaces 8.Need a communications data relay orbiter for 2016 opportunity which could be used as a science opportunity as a secondary objective 9.Shared opportunities require shared credit for outreach, public relations and national/organizational prestige 2. NASA-ESA establish a strategic partnership for Mares exploration in 2016/18/20 and beyond, with immediate focus on ExoMars and Shared science and science efforts on all missions, including sharing science data 11. Missions must show identifiable progress toward Mars Sample Return 1. Partnership must address NASA/MEP/NRC, as well as ESA, science goals 5. Substantial collaboration will create dependencies, and must build on both party’s strengths and strategic interests 7. US does EDL in at least one opportunity of (NASA core competency) 8. US has a surface system in at least one opportunity of (NASA core competency) 9. US provides an ELV in no more than one opportunity of Missions should be segmented with clean interfaces (ITAR requirements must be complied with as well) 10. Shared opportunities require shared credit for outreach, public relations and national/organizational prestige 3. Plans must be budgetarily and technically realistic 3a. Develop two plans: what we can afford to do, and the “best” partnership