Mu2e Magnet Design Changes Michael Lamm for the Mu2e Collaboration and TD/Magnet Systems Dept. March 26, 2012 All Experimenters Meeting 1 Contributors.

Slides:



Advertisements
Similar presentations
E821 SC Inflector and Beyond Wuzheng Meng 12 June 2008.
Advertisements

Q1 for JLAB’s 12 Gev/c Super High Momentum Spectrometer S.R. Lassiter, P.B. Brindza, M. J. Fowler, S.R. Milward, P. Penfold, R. Locke Q1 SHMS HMS Q2 Q3.
WBS 4 Solenoid Magnets Update Mu2e Working Group Meeting 27-Jul-2011 Thomas Page Solenoid Project Engineer.
Mu2e Solenoid System Status. Mu2e Experiment 9/23/20132 Production Solenoid Transport Solenoid Detector Solenoid Production Target Collimators Stopping.
Zian Zhu Superconducting Solenoid Magnet BESIII Workshop Zian Zhu Beijing, Oct.13,2001.
Muon g-2 Muon g-2 Experiment Quarterly Report Aria Soha All Experimenter’s Meeting March 2, 2015.
Magnet quench during a training run Magnet electrical circuit schematic PROGRESS ON THE MODELING AND MODIFICATION OF THE MICE SUPERCONDUCTING SPECTROMETER.
Spectrometer Solenoid Design and Procurement Review Steve Virostek Mike Green Mike Zisman Lawrence Berkeley National Lab MICE Collaboration Meeting October.
1 Spectrometer Solenoid Design and Cost Update Michael A. Green Lawrence Berkeley Laboratory 10 February 2005.
1 The Genoa Tracker Solenoids and their Contribution toward a New Design Michael A. Green Lawrence Berkeley National Laboratory and Pasquale Fabbricatore.
Twin Solenoid Twin Solenoid - conceptual design for FCC-hh detector magnet - Matthias GT Mentink Alexey Dudarev Helder Pais Da Silva Leonardo Erik Gerritse.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
Superconducting Large Bore Sextupole for ILC
Muons, Inc. AAC Feb. 4, 2009 V. Kashikhin 1 Fermilab AAC  V. Kashikhin for Superconducting Magnet Team Superconducting Helical Solenoids.
MCTF Alexander Zlobin MUTAC Meeting 8-10 April MCTF Magnet and HTS Conductor R&D.
Status of Mu2e Solenoids Michael Lamm for the Mu2e Project Working Group Meeting March 17, 2010 Organization Technical Progress Cost and Schedule.
1. Overview of the mu2e magnet system 2. Collaboration mu2e-COMET R. Ostojic Based on presentation of M. Lamm in ASC2010. All credit goes to the members.
1 A Joint Proposal for US-Japan Cooperation Program Proposal to JSPS US-Japan collaboration fund R&D of superconducting magnet technology for high intensity.
1 Design of Solenoid and iron yoke for GLD KEK Hiroshi Yamaoka Ken-ichi Tanaka July 13, ‘05.
CD meeting R.Yamada1 Thoughts on 4CD (4 th Concept Detector) Solenoid System based on Alex Mikhailchenko’s Basic Design Ryuji Yamada October 20,
Status of CEPC Detector magnet
LCWS14 Benoit CURE - CERN/PH Dept.1 International Workshop on Future Linear Colliders October 2014 Organized by the Vinca Institute of Nuclear.
Magnets for muon collider ring and interaction regions V.V. Kashikhin, FNAL December 03, 2009.
Mu2e Experiment and Issues Rick Coleman, Fermilab RESMM’12, February 2012.
Brookhaven - fermilab - berkeley US LHC ACCELERATOR PROJECT LHC IR Quad Heaters.
Fred Nobrega, Nikolai Andreev 21 September, 2015.
KEK Hiroshi Yamaoka Task list for Magnet/Iron yoke Solenoid magnet Iron yoke Experimental hall and other facilities May 11, ’05.
Alain Hervé, ILD Workshop, Seoul 17 February 2009, 4365-ILD-T-Coil-Developments.ppt Possible Coil Developments ILD Workshop - SEOUL - 17 February 2009.
Abstract: The Muon Ionization Cooling Experiment (MICE) is an international effort sited at Rutherford Appleton Laboratory, which will demonstrate ionization.
Big Magnet Design II: a) solenoid and cable concept b) short section test V.V. Kashikhin and A.V. Zlobin.
February 13, 2012 Mu2e Production Solenoid Design V.V. Kashikhin Workshop on Radiation Effects in Superconducting Magnet Materials (RESMM'12)
CEA DSM Irfu - F. KIRCHER - [Seoul Workshop, Feb 16-18, 2009] 1 ILD detector magnet: LoI version F. Kircher, O. Delferrière CEA Saclay, DSM/Irfu/SACM.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
Mu2e WGM 11/16/2011 R. Ray Mu2e Project manager. Review of the past few months In September it became apparent that the cost of Mu2e was well in excess.
Magnet vacuum vessel w/radiation shield and cold mass in place Magnet leads (left) and the three cryocoolers on the top of the spectrometer solenoid service.
TD Designs for mu2e Solenoid Magnets Michael Lamm for the Mu2e Collaboration and TD/Magnet Systems Dept. All Experimenters’ Meeting January 25, 2010.
RSVP AGS Upgrade Projects MECO RSVP Preliminary Baseline Review Brookhaven National Lab April 6-8, 2005 D. Phillips.
Optimized CESR-c Wiggler Design Mark Palmer, Jeremy Urban, Gerry Dugan Cornell Laboratory for Accelerator-Based Sciences and Education.
LARP Collaboration Meeting, April 26-28, 2006Gian Luca Sabbi HQ Design Study (WBS ) LARP Collaboration Meeting April 26-28, 2006 N. Andreev, E.
MICE Coupling Coil Testing at Fermilab All Experimenters Meeting Ruben Carcagno March 19, R. Carcagno - MICE CC Testing at Fermilab3/19/2012.
RSVP AGS Upgrade Projects MECO RSVP Preliminary Baseline Review Brookhaven National Lab April 6-8, 2005 D. Phillips.
Muon Cooling Channel Superconducting Magnet Systems Muon Collider Task Force Meeting on July 31, 2006 V.S. Kashikhin.
Magnet R&D for Muon Beam Cooling at FNAL Alexander Zlobin Fermilab Muon Collider Design Workshop, BNL December 1-3, 2009.
16 T Dipole Design Options: Input Parameters and Evaluation Criteria F. Toral - CIEMAT CIEMAT-VC, Sept. 4th, 2015.
22 October 2005MICE Meeting at RAL1 Tracker Solenoid Overview Michael A. Green Lawrence Berkeley Laboratory MICE Collaboration Meeting 22 October 2005.
What we have now – the Pbar source 1 1/23/2013 J. Morgan.
Helical Solenoid Development
Reducing the Iron in the Endcap Yoke of CLIC_SiD Benoit Curé, Konrad Elsener, Hubert Gerwig, CERN CERN, June 2014 Linear Collider Detector Magnet Meeting.
Muons, Inc. 14 Jan 2010 S. Kahn--IR Quads 1 IR Quadrupoles with Exotic Materials Steve Kahn, Muons Inc. Bob Palmer, BNL Don Summers, Ole Miss.
Long Quad (LQ) & High Gradient (HQ) Series Alexander Zlobin bnl - fnal- lbnl - slac US LHC Accelerator Research Program DOE LARP review Fermilab, June.
Mu2e Solenoids Michael Lamm Fermilab Institutional Review 12 February 2015.
Magnet R&D for Large Volume Magnetization A.V. Zlobin Fermilab Fifth IDS-NF Plenary Meeting 8-10 April 2010 at Fermilab.
MICE Spectrometer Solenoid Recovery Review - December 3-4, Steve Virostek MICE Spectrometer Solenoid Design and Assembly.
AUGUST 3, 2010 BRYCE AUSTELL UNIVERSITY OF ILLINOIS FERMILAB SIST INTERN ADVISOR: RYUJI YAMADA Muon-to-Electron Conversion Experiment (Mu2e) Detector Solenoid.
Superconducting Cryogen Free Splittable Quadrupole for Linear Accelerators Progress Report V. Kashikhin for the FNAL Superconducting Magnet Team (presented.
SC Magnet Summary Michael Lamm SC Magnets in High Radiation Environment RESMM’12 February 15, 2011.
1 Long QXF Mirror Fabrication (MQXFPM1) Rodger Bossert HiLumi-LARP Collaboration Meeting May 18-20, 2016 SLAC R. Bossert - HiLumi Collaboration Meeting.
Update on PANDA solenoid design and analysis Gabriella Rolando Helder Pais Da Silva Herman ten Kate Alexey Dudarev 3 November
Generic technology development - High field magnet R&D
Update on PANDA solenoid design
Superconducting Helical Solenoids
SiD Solenoid Status and Plans
Target and Horn status report
Bore quench field vs. critical current density
the MDP High Field Dipole Demonstrator
Superconducting Magnet Development for me Conversion Experiments
Yingshun Zhu Accelerator Center, Magnet Group
BESIII Collaboration Meeting, June 5~6, 2002, Zian Zhu
as a prototype for Super c-tau factory
Cross-section of the 150 mm aperture case
Presentation transcript:

Mu2e Magnet Design Changes Michael Lamm for the Mu2e Collaboration and TD/Magnet Systems Dept. March 26, 2012 All Experimenters Meeting 1 Contributors to the Mu2e Solenoid Design: N. Andreev, G. Ambrosio, R. Bossert, J. Brandt, M. Buehler, R. Coleman, D. Evbota, W. Jaskierny, V.V. Kashikhin, M. Lopes, J. Miller, T. Nicol, D. Orris, R. Ostojic, T. Page, T. Peterson, J. Popp, V, Pronskikh, Z. Tang, M. Tartaglia, Z. Tang, M. Wake, R. Wands and R. Yamada

2 Production Solenoid Transport Solenoid Detector Solenoid Production Target Collimators Stopping Target TrackerCalorimeter protons 2.5T 4.6 T 2.0T 1.0T ee     Mu2e experiment consists of 3 solenoid systems: Measure the Rare Process:  - + N  e- + N Muon timing is important. Negative axial field gradients prevent unwanted trapped particles from entering “Search Window”

March 26, 2012 All Experimenters Meeting 3 Reason for Design Changes Recommendations from May 2011 Independent Design Review –More operating margin for PS –Simplify DS –Better mechanical support for PS coils Value Management exercise in Fall 2011 –Reduce cost of Solenoid project by ~$20M Change in requirements –Field requirements have become less stringent with detailed beam studies  Simplify magnet designs

L2 Solenoid Power Supply/Quench Protection Cryoplant PS IRON DS IRON Field Mapping Ancillary Equipment Insulating vacuum Installation and commissioning Production Solenoid (PS) Transport Solenoid (TS) Detector Solenoid (DS) Cryogenic Distribution OFF PROJECT Single Layer-shorter Spectrometer 4.6 T peak field Less layers for PS DOWN SCALED Changes Since May 2011 IDR 4

PS Baseline Design Changes All Experimenters Meeting 5 Peak field 5T- I operation ~10kA NbTi Rutherford cable + Ni doped aluminum stabilizer (like ATLAS CS) Indirect Cooling (Thermal Siphon) Hadron absorber intercepts beam secondaries –~20 Watts deposited in coils Nominal peak field 4.6T –5T still possible with reduced margin Reduce number of layers Thinner conductor (lower current) Remove iron yoke   Gradient made by 3 axial coils same turn density but change # of layers Wound on individual bobbins

PS Field vs. Tolerance Bands All Experimenters Meeting March 26, Meets 5% field uniformity spec

March 26, 2012 All Experimenters Meeting 7 Collaboration with Japan Fabrication of practice PS coil at Toshiba (4 Layer/8 Turns) Uses aluminum stabilized NbTi conductor from Hitachi Cable Coil will be later tested at Fermilab

New baseline Transport Solenoid TS1 TS2 TS4 TS5 Three  Two cryostats: TSU, TSD TS3:  TS3U, TS3D. Wider coils to compensate for gap Rotatable Collimator, P-bar window G. Ambrosio TS Leader New coil fabrication proposed for better mechanical support. All Experimenters Meeting March 26, TS1,TS3,TS5: Straight sections with axial gradient TS2/TS4: approximate toroidal field Accomplished by many thin solenoid rings of different amp-turns

Coil Fabrication 9 Bolted connections Conductor Al Outer Supports March 26, 2012 Original plan: use SS inner bobbins  mechanical support complications. New plan: fabrication unit consists of two coils with outer support aluminum structure Coils wound on collapsible mandrel-then fit into outer aluminum ring Placement of coil in transport is determined by outer shell geometry All Experimenters Meeting

TS Field Requirements All sections meet all requirements Large margin wrt gradient requirement March 26, 2012 All Experimenters Meeting 10 Axial field distribution in the center of TS3 (left), axial gradient along TS3 (right).

Simplify DS Baseline March 26, 2012 OLD base line –Two coils: gradient + spectrometer bussed in series in a single cryostat –Two layer spectrometer, single mandrel  field uniformity –Two layer gradient on single mandrel with aluminum spacers –Iron return yoke (not shown) 11 All Experimenters Meeting Spectrometer Section Gradient Section

Simplify DS Baseline March 26, 2012 Spectrometer Section Gradient Section New base line driven by relaxed field requirements –Modular coil design  reduced cost/coil –Spectrometer: 3 Single Layer Coils  shorter coils, greatly reduced conductor volume, reduced field uniformity OK –Original conductor cost estimate based on expensive PS conductor, smaller field DS requires smaller cross section, no need for special reinforced aluminum –Relaxed calorimeter field requirements  shorten spectrometer 12 All Experimenters Meeting

DS Field vs. Tolerance Bands March 26, All Experimenters Meeting Gradient Section Spectrometer Section

March 26, 2012 All Experimenters Meeting 14 Conclusion Significant amount of work done prior to CD1 –Conceptual design of solenoids –Technology development with Japan Near term schedule –CD1 directors review April 3-5, Lehman review in June –June Test Toshiba coil/built prototype TS module/prototype conductor –CD2 sometime in 2014 Order conductor/ Contract final design with industry –Begin fabrication in 2016