3 rd Stakeholders Group Meeting Project status and details of the ongoing development of the load-flow based capacity calculation/allocation system CEE.

Slides:



Advertisements
Similar presentations
Czech approach to Regulatory Impact Assessment Prof. Michal Mejstřík Chairman of Regulatory Impact Assessment Board (RIAB) of the Czech Government Legislative.
Advertisements

- GDP 2011 versus 2010 – increase by 5.5%
Evaluation Plan in Hungary Dr. Tamás Tétényi Head of Department for Strategy and Evaluation National Development Agency.
2 nd IG-Meeting Preparation of the Coordinated Physical Transmission Right (PTR) Allocation Scheme for the CEE – Region Vienna
8 th IG-Meeting Coordinated Auctioning, Auction Office and Organisational Issues Christian Todem Vienna
Disclaimer Some elements of the following presentation are extracted from documents approved by the 11 CWE Project Parties. However, this presentation.
The role of ACER In the Regional Initiatives Steve Gordon Head Of the Gas Department North West Regional Initiatives 2011.
1 page 1 C O U P L E D Joint TSO-PX presentation NWE Day-Ahead Price Coupling IG meeting May 9 th 2012 Copenhagen Joint Presentation from TSOs and PXs.
IFE-CASC long term auctions Project status Implementation Group Meeting - Lisbon,
1 TITRE Update on approval processes for NWE price coupling NWE IG on DA and ID Copenhagen, 9 May 2012.
Report on ACER Progress An exchange of views with the Committee on Industry, Energy and Research of the European Parliament Brussels, 11 July 2011.
1 XVI Florence Forum Jose Sierra Madrid, 4 June 2009 Chair, RIG ERGEG Electricity Regional Initiative Update & Progress.
Does the Third Package provide the European TSO associations with the tools necessary to find solutions to the European energy challenge ? Pierre BORNARD.
Public Procurement in Albania in the framework of recent reforms PUBLIC PROCUREMENT AGENCY 1.
Allocation Rules Martin Apko CAO Central Allocation Office GmbH 30 February 2009, CEE Implementation Group, Vienna.
Mark van Stiphout – DG TREN – C2 Internal market for electricity and gas The role of TSOs in the third package EUROPEAN COMMISSION GIE conference 7 May.
ZHRC/HTI Financial Management Training
David Halldearn, ERGEG Conference on Implementing the 3 rd Package 11 th December 2008 Implementating the 3rd Package: An ERGEG Consultation paper.
Paris, 18th May nd RCC Meeting South Gas Regional Initiative.
Action for establishing a Single Auction Office for CSE Electricity Regional Initiative - Central-South Region 2 nd Stakeholders Group Meeting 21 April.
Asta Sihvonen-Punkka Director General of EMA Vice-Chair of ERGEG Baltic Electricity Mini-Forum 24 th of April, 2009 Riga The 3 rd Package – implied changes.
PCR Status report AESAG, September Supported by:
Case COMP/ – ENI (Abuse of Dominant Position) International Competition Law Dushanka Dovichinska 24 Nov 2010.
How will the Third Liberalization package influence the framework of the regulators? Dr. Annegret Groebel Managing Director and Head of International Coordination.
Creating a Single European Energy Market – the Regulatory Perspective London, 30. January 2007 ERGEG Electricity Regional Initiative Central-East Europe.
WG FBA Status Report Andrzej Detkiewicz IG, 30 ty January 2008.
Actions for establishing a Single Auction Office for CSE 9 th IG Meeting Milan, 18 th July 2008.
1 Auction Office establishment, antitrust issues and Project Plan IG Meeting, Vienna January 30 th 2008.
Capacity allocation in natural gas transmission networks Framework Guideline (Pilot) Dr. Stefanie Neveling, ACER Workstream Co-Chair Walter Boltz, ACER.
The 3rd package for the internal energy market Key proposals EUROPEAN COMMISSION Heinz Hilbrecht Directorate C - Security of supply and energy markets.
The Status Report for IG meeting Wojciech Jarosz February 13 th 2009.
WIPO Pilot Project - Assisting Member States to Create an Adequate Innovation Infrastructure to Support University – Industry Collaboration.
How do CEE countries benefit from improved regional cooperation? from the Czech TSO perspective The Regional Initiatives - Progress and Prospects Joint.
WG FBA report Dr. Uroš Gabrijel (ELES) IG Meeting, Vienna, 13 February 2009.
Actions for establishing a Single Auction Office for CSE 8 th IG Meeting Milan, 3rd June 2008.
EUROPEAN COMMISSION Heinrich Hick, DG TREN C 2 3rd IEM Package and relevance of GRI GRI NW stakeholder Conference, London, 14 November 2008.
Electricity Regional Initiative Central Eastern European Region Congestion Management – Status & Prospects Tahir Kapetanovic E-Control CEE Stakeholder.
IRG/ERG Gabrielle Gauthey Member of the Board of ART.
Madrid, 23rd July rd IG Meeting South Gas Regional Initiative.
Update on electricity market Baltic Mini Forum 1 October, 2010.
Implementation of Transparency Guidelines Martin Reisner Advisor Current Status and future Challenges Ljubljana – 13 September 2012.
New Rail Market Access Rules Directive 2012/34/EU (recast) EUROPEAN COMMISSION.
1 The regulators’ view on the Central West REM: Emphasis on the completion of existing initiatives Presentation for the Mini-Forum 20 June 2006.
European Commission views on intra-day and balancing markets
Asta Sihvonen-Punkka Director General of EMA Vice-Chair of ERGEG Baltic Electricity Mini-Forum 1 October, 2010 Jurmala ACER and regulatory empowerment.
A DVANCED A LLOCATION S TARTS W ITH U S ! CAO P ROGRESS REPORT 21 ST IG M EETING 26 J ANUARY 2010.
CAM PROPOSAL FOR HARMONISATION 19 th IG meeting Madrid 28 th March 2012.
Development of System Operation Network Codes ACER Workshop 24 August 2011 Ole Jan Olesen, Convenor ENTSO-E Working Group on European Operational Standards.
NATIONAL CONFERENCE Intellectual Property Policies for Universities and Innovation dr. sc. Vlatka Petrović Head, Technology Transfer Office Acting Head,
Single Auction Office 1 Mini-Forum of Central Western Europe Brussels, 20th June 2006 Dr. Frank-Peter Hansen Federal Network Agency.
Independence and powers of regulators: legal and institutional requirements Heinz Hilbrecht, Director, European Commission World Forum on Energy Regulation.
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
1FTS-CEER bilateral meeting, St Petersburg, 17 May 2011 Peter Plug Chairman of the electricity working group Use and management of interconnections – The.
Florence Forum, November 2008 Regulation (EC) 1228/ ERGEG Compliance Monitoring.
1 WG FBA report Uroš Gabrijel IG Meeting, Vienna, May 9th 2008.
Electricity Regional Initiative Central Eastern European Region Convergence & Coherence Sven Kaiser E-Control CEE Stakeholder Group Meeting 7 th November.
Deputy Head of Federal Accreditation Service Sergey V. Migin Approximation of accreditation systems of European Union and Russia.
1 Dublin 23/24 April CONCLUSIONS Regulatory Co-ordination Responses to Deliverables 3 and 4 due by 8 th May Papers redrafted to take comments into account.
REPUBLIC OF ALBANIA PUBLIC PROCUREMENT AGENCY Eighth Regional Public Procurement Forum May, 22-25, 2012 Tirana
Reforms in the Albanian Public Procurement System 7 th Regional Public Procurement Forum Tbilisi, Georgia May 16-19, 2011 PUBLIC PROCUREMENT AGENCY 1.
Ministry of Finance Compliance assessment of the management and control systems of the managing authorities under the Operational programmes. Conclusions.
process and procedures for assessments
Supported by: PCR Status report AESAG, September
PUBLIC PROCUREMENT SYSTEM IN UZBEKISTAN
- GDP 2011 versus 2010 – increase by 5.5%
Supported by: PCR Status report AESAG, September
LNG Workshop Bilbao, March 13th 2009 GLE.
TURKISH COMPETITION LAW ENFORCEMENT:
EUnetHTA Assembly May 2018.
System of independent assessment of qualifications in the field of AML/CFT Godina Elena Head of the Center for Assessment of Qualifications in the field.
Presentation transcript:

3 rd Stakeholders Group Meeting Project status and details of the ongoing development of the load-flow based capacity calculation/allocation system CEE TSOs Vienna

2 State of Play Antitrust and Merger Regulation Issues Documents requested by CEE-Regulators Updated Project Plan Project Office Open Topics Conclusions Agenda

3 Managing director/MD contract Cost sharing agreement Business plan, budget and shareholder‘s loan ( ) Articles of association Bank account Staff recruiting (Project Team) /employment contracts / accountant service Office ( ) Founding procedure, necessary TSOs‘ confirmations, proxy issue Antitrust and Merger/Cartel regulation issues Service Level Agreement (inter TSO contract) Software (common coordinated capacity calculation and allocation) Communication infrastructure and IT hardware Auction Rules, external data transfer (MLA) Not yet started Started In implementation Completed State of Play

4 Antitrust & Merger Regulation Issues I/II Several antitrust & merger regulations could be relevant:  Antitrust regulations following art. 81/82 of EC contract  Mergers following merger Regulation 139/2004  Antitrust and merger regulations under national (German) laws Previous steps, 1 st letter to the Commission:  CEE TSOs have already submitted a letter, on 26 th March, regarding antitrust & merger issues to the Commission.  The answer of the Commission puts the burden of final judgement of the notification need on TSOs’ shoulders.

5 Antitrust & Merger Regulation Issues II/II Previous steps, 2 nd letter to the Commission:  CEE TSOs have submitted a second letter, on 10 th July, to the Commission for final clarification – whether the Commission is responsible or national competition authorities.  A questionnaire has been submitted to CEE TSOs by the Commission for helping them to clarify the situation. The EC has denied our request as we could not prove that CAO will be a fully functioning company. The next steps are (to be elaborated in detail): notification of all 8 TSOs to the German federal syndicate agency (Bundeskartellamt) most likely notification of all 8 TSOs to the Polish syndicate agency

6 09/0710/0711/0712/0701/0802/0803/0804/0805/0806/0807/0808/0809/0810/0811/08 12/08 01/09 Test calculations for D/M/Y concepts Improvement of D/M/Y concepts Scheduling concept Curtailment concept Secondary market concept Cost & revenue distribution concept Implementation design Processes chain & Emergency concept IT Tender preparation IT Tender & selection of IT provider IT Installation IT Tests & Dry-run Assessment of and decision on FBA concepts by HLM and afterwards opinion by Regulators Acceptance by EC (merger regulations) or national authorities (if necessary) Board decisions & foundation of CAO Agreement with TSOs outside CEE region Auction Rules (including consultation with traders) Update tools of TSOs inside & outside CEE region (incl. 7 days regime) Service Level Agreement Opinion of Regulators Preparation of CAO Market Information WG Coordinated Auction WG Flow-based Allocation Support by consultant Permanent project team / CAO staff Regulators Other third parties High Level Group Consultation with regulators Project Plan For Next Months Dr CAT Dry-run Draft documents requested by regulators!

7 Project Team Creation of an permanent project structure:  In order not to lose time and to avoid further delay a Project Team will be established.  If the antitrust & merger regulation issues are clarified the Auction Office (as a independent legal entity) can immediately be established. Project coordination:  The Project Team (managed by the designated MD of the future AO) coordinates the work and acts as the overall project management.  A permanent project staff works part/full-time for establishing and developing the future allocation system.  The already established structure (Working Groups) will assist the Project Team.  Also a external consultant has been chosen to support the work!

8 Open topics I/II Scheduling, Curtailment:  Comprehensive concept has already been elaborated and experts of involved TSOs are going to finalise it during the next month.  Also different concepts and possibilities of curtailment are under investigation. Capacity calculations:  Concept is still under elaboration.  Several test calculations have been performed.  The Consultant will also assist in performing test calculations.

9 Open topics II/II IT:  IT-Tender for capacity calculation and auctioning is under preparation.  Experience of similar projects shows that development will take about 6 months.

10 Conclusions  Based on decision from CEE-Regulators no capacity – available for yearly auction for 2008 – will be shifted to monthly auctions in 2008 for enabling the start of FBA system during  So, the FBA system will start with high probability not before 2009 (yearly auction for 2009).  TSO looking forward to develop – with support from Consultants – a consistent package for Y/M/D allocations, opened for further development for intraday.  Strong cooperation with Regulatory Body is crucial to avoid further delays.

11 Thank you for your attention