2 Preliminary  Pre-Design & Design  Prior to Bid Letting  For funding allocation and bid comparison Final  Construction  Post Award  For contractor.

Slides:



Advertisements
Similar presentations
Project Estimates There are two types of estimates 1Partial Payment Estimate 2Final Payment Estimate.
Advertisements

Roles & Responsibilities in Construction Management
Construction Management. Players Owner – owns project upon completion of construction –Private – owner owns land and pays for construction of facility.
ESTIMATING - A CONTRACTORS PERSPECTIVE. Company History/Background Oman Construction was founded in 1876 First bridge contract in 1881 First Highway Contract.
CON 4003 CVE 4073/5073 The Estimating Process Prof. Ralph V. Locurcio, PE.
Preparing a Post Bid Report Preparing a Post Bid Report NYS OGS Design & Construction Group Cost Control.
Gene Shawcroft, P.E. Central Utah Water Conservancy District April 29-30, 2013.
Additive Alternates on ODOT let Projects -A discussion- Joe Anthony Supervisor, Construction Cost Section Office of Estimating.
Project Cost Estimating A Synthesis of Highway Practices Presented by: Christine M. Fiori, Ph.D., P.E. Arizona State University.
Alternative Project Delivery
Contract Types. Forms of Contracts Completion – A product is delivered –Cost or Fixed Price –Product must be delivered –Contract completed on delivery.
Rail Freight Assistance Program (RFAP) S ETTING THE S TAGE FOR THE F UTURE Rail Transportation Assistance Program (Rail TAP) RFAC Meeting April 28, 2010.
Alderman Road Residences Phase II Design Build. Extensive master planning preceded this phase 2003 – Dagit Saylor Master Plan Hanbury Evans Update.
Estimating Planning Estimating Planning Controlling.
Determination of Construction Contract Duration for Public Projects in Saudi Arabia By: Ahmed Saleh Al-Sultan, June 1989 Presented by Sameh Elish January.
COMMERCIAL “SOLE SOURCE” PROPOSAL ANALYSIS ROADMAP 1. Is information available within the Government? Step 1 – Information within the Government If Yes.
Overview of FDOT’s Long Range Estimating System 2005 TEA Conference November 4, 2005 Daytona Beach, Florida.
What is Project Cost Management?
Construction Engineering 221 Cost Estimating and Bidding.
State Auditor’s Office Change Order Pricing Practices Performance Audit of Eight Local Governments Puyallup City Council February 7, 2012 Chris Cortines,
Army Directorate of Public Works Support Contractor of the Year Carlos Garcia Owner/CEO KIRA Maximizing Return on Investment in Business Development.
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
Design Build, Job Contracting, or Construction Manager at Risk In early 2000 the legislators added an alternate way to accelerate construction project.
COMPLIANCE WITH GRANT IMPLEMENTATION PROCEDURES TxDot Grant Fund Project.
Project Risk and Cost Management. IS the future certain? The future is uncertain, but it is certain that there are two questions will be asked about our.
Construction Cost Estimating Class #2: Concept Estimating Prof. Ralph V. Locurcio, PE.
Tammy Shelton Acting Associate Staff Chief, HROD ORD Manager’s Meeting January 24, 2006 The Competitive Sourcing Challenge.
Tyrone Ware FDOT Specifications & Estimates Office Estimating Systems Support Section.
 Coordinating construction related training  Following and gathering info for construction related performance measures  Follow Contract Modifications.
1 ECGD3110 Systems Engineering & Economy Lecture 3 Cost Estimation.
ADOT Multimodal Planning Division Planning Assistance for Rural Areas (PARA) Program Overview December 4, 2013.
Technical Assistance Grants to Communities Pipeline Safety Trust Conference New Orleans November 20, 2008 Steve Fischer PHMSA/Office of Pipeline Safety.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
Center for Risk Management of Engineering Systems University of Virginia, Charlottesville 1 Process Development and Integration for the Six-Year Program.
Calistoga Joint Unified School District Measure “A” Citizens’ Oversight Committee Meeting October 27, 2011.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
1 MnDOT Metro District Proposed Transportation Improvement Program (TIP) Amendment Metropolitan Council January 17, 2007.
Utility Financial Management AWWA Intermountain Section Leadership Forum Session Two November 10, 2015.
ACCOUNTING FOR CAPITAL PROJECTS Financial Policies and Procedures for the Capital Project Delivery Process Office of the CFO.
Elevating the Quality of Life in the District Contracting and Procurement Division Information Session 2 Request for Proposal November 5, 2015.
Budget BOOT CAMP Part II: Budget management Budget BOOT CAMP Part II: Budget management Patrick S. DeGeorge Business Administrator Matawan-Aberdeen Regional.
SPECIAL PROCUREMENTS OCTOBER 20, 2015 Texas Woman’s University.
Cost Estimation Strategies for Keeping Track of the Vastness Presented by: David Lake, P.E. Roadway Designer Nevada Department of Transportation
Department Approved Cost The approved cost of a project phase represents the dollar amount that the Department has authorized that may be spent on a project.
Richland Creek Water Supply Program Contract for WTP and Pump Stations CMAR Services and Program Update Paulding County, Georgia Board of Commission Work.
OTC Pres: Bid & Award Phase 4 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Eryca McCartin, Office.
Ohio Department of Transportation John R. Kasich, Governor Jerry Wray, Director Office of Estimating 2015 OCA Leadership Forum.
Keith Roberts, P.E. Project Implementation Engineer IDOT – District 9.
Budget Estimates & Bid Estimates: Is there a difference? TCCE Annual Meeting September 3, 2014.
Introduction to Procurement for Public Housing Authorities Independent Cost Estimates and Cost/Price Analyses Unit 3.
OMB Circular A-122 and the Federal Cost Principles Copyright © Texas Education Agency
Construction Management At Risk Process
1 EASTERN MUNICIPAL WATER DISTRICT Temecula Valley Recycled Water Pipeline Joe Mouawad Sr. Director of Engineering September 2, 2015.
August 6, 2013 LAKE FORREST DRIVE UPDATE. sandyspringsga.gov Lake Forrest Drive Update  Actions To-Date Work Orders – 13 since 2009 for clean-up, 8 of.
 To provide a realistic accurate idea of the cost  Provide information about building or not.
PWGSC - KOREA 2nd JCC Meeting Canadian Federal Real Property Construction Contracting Presentation by Bruce Fletcher Director General – CASMS - PWGSC November.
English for Construction Engineering Management ,建筑工 程专业英语 赖小东 授课教师:赖小东 Cell# 江西财经大学旅游与城市管理学院工程管理系.
DR. Nabil Dmaidi F ACTORS THAT D ETERMINE V ARIATION IN E STIMATES.
Reject all bids for Citywide Tree Trimming Services and authorize increases to Contracts No. 21,628 and No. 21,629 with George Salinas Tree Preservation,
Stockton Event Center Audit Recommendations and City Response
Light Rail Transit Project
Estimating and Scheduling CEE 492
Overview May 24, 2017.
Managing Outgoing Subawards April 18, 2017
Pre-Construction Services
Request for Proposal & Proposal
USFS Acquisition Mechanisms and Potential for Increased Local Contracting A Collaborative effort between USFS Region 5 and the Sierra institute for community.
What is Project Cost Management?
Chapter 2 – Review ‘construction management’
Contract Award for the Colorado Street Bridge Suicide Mitigation Enhancements Project City Council May 20, 2019 Item # 7.
Presentation transcript:

2 Preliminary  Pre-Design & Design  Prior to Bid Letting  For funding allocation and bid comparison Final  Construction  Post Award  For contractor payout

3 Preliminary  Pre-Design & Design  Prior to Bid Letting  For funding allocation and bid comparison Pre-Design  LRE Design  DQE Authorization Estimate Official Estimate

 Long Range Estimates system  Pre-Design; conceptual estimate: used to establish funding levels for the project  Generates pay items and quantities you can EXPECT to have, based on project characteristics (typical sections, length, etc.)  Design Quantities and Estimates system  Design estimate: used to develop the Department’s Official Estimate for bid comparison purposes  Contains KNOWN pay items and quantities, based on complete (or nearly complete) plans. 4

5

 LRE uses characteristics of typical section models, applied to a length of roadway, to generate anticipated pay items, quantities, and unit prices. 6

 District Estimator determines unit prices based on:  Pay Item Quantity  Project Location  Contract Duration  Material Cost and availability  Labor Cost  Equipment Cost  Contractor Competition  Recent bid prices on similar items are also taken into consideration 7

8

 At 60% - 90% plans, the Designer determines the pay items and quantities comprised in the scope of the project  District Estimator determines unit prices for each pay item  Both bid-based and cost-based estimating techniques are used 9

 Estimates are based on Present Day Cost (PDC)  Work Program Office applies inflation factors for projects that are scheduled for future years 10

11 Annual Work Program Review

 Goal: To ensure that appropriate funds are budgeted for each year in the 5 Year Work Program  Review Criteria:  Estimates must be in LRE or DQE  Quantifiable and include all scope  Within tolerance of Work Program  Updated every 6 months  Review Schedule:  August through November  “Exceptions List” completed after each review 12

 Develop/revise LRE estimate: Pre-Design Phase 1 (30% Plans) Phase 2 (60% Plans)  Develop/revise DQE estimate: Phase 3 (90% Plans) Phase 4 (100% Plans)  Develop/finalize Authorization Estimate: FHWA authorization of funds Advertisement for bids Work Program Amount (for encumbrance)  Develop Official Estimate  Perform post-bid analysis  Present findings to Awards Committee 13

14