REQUIREMENTS FOR FCC DILUTION KICKERS AND BEAM DUMP LINE GEOMETRY F. Burkart, W. Bartmann, M. Fraser, B. Goddard, T. Kramer FCC dump meeting 18 th June.

Slides:



Advertisements
Similar presentations
Study of the Luminosity of LHeC, a Lepton Proton Collider in the LHC Tunnel CERN June F. Willeke, DESY.
Advertisements

Performance reach of LHC beam dump B.Goddard: input from L.Ducimetière, W.Bartmann, V.Mertens, J.Borburgh, F.Velotti, M.Barnes, C.Bracco, V.Senaj, M.Meddahi,
Luminosity Prospects of LHeC, a Lepton Proton Collider in the LHC Tunnel DESY Colloquium May F. Willeke, DESY.
November 2005M. Woodley1 ILC Beam Delivery System layout with end-of-linac undulator.
FCC-hh Injection and Extraction
B.Goddard 08/11/04 HHH 2004 Workshop, CERN Beam Dump Brennan GODDARD CERN AB/BT The existing LHC beam dump is described, together with the relevant design.
ILC RTML Lattice Design A.Vivoli, N. Solyak, V. Kapin Fermilab.
October 31, BDS Group1 ILC Beam Delivery System “Hybrid” Layout 2006e Release Preliminary M. Woodley.
January 10, 2007M. Woodley (SLAC)1 ILC Beam Delivery System “Interim Working Assumption” 2006e Release European LC Workshop, January , Daresbury.
HF2014 Workshop, Beijing, China October 9 th -12 th, 2014 Constraints on FCC-ee lattice design Bastian Haerer Constraints on the.
LER Workshop, CERN, October 11-12, 2006Detector Safety with LER - Henryk Piekarz1 LHC Accelerator Research Program bnl-fnal-lbnl-slac Accelerator & Detector.
J. Pasternak First Ideas on the Design of the Beam Transport and the Final Focus for the NF Target J. Pasternak, Imperial College London / RAL STFC ,
1 st September 2005LHC-LUMI 05 - G.Arduini – CERN/AB Optical requirements for the magnetic lattice of the high energy injectors (SSPS in the SPS tunnel)
Accelerator Science and Technology Centre POST-LINAC BEAM TRANSPORT AND COLLIMATION FOR THE UK’S NEW LIGHT SOURCE PROJECT D. Angal-Kalinin,
Sketching Basic Kicker System Parameters W. Bartmann, T. Fowler, B. Goddard, T. Kramer.
Accelerator Science and Technology Centre POST-LINAC BEAM TRANSPORT AND COLLIMATION FOR THE UK’S NEW LIGHT SOURCE PROJECT D. Angal-Kalinin,
LER Workshop, October 11, 2006LER & Transfer Line Lattice Design - J.A. Johnstone1 LHC Accelerator Research Program bnl-fnal-lbnl-slac Introduction The.
Plan for Beam Extraction using strip-line kicker with pulse bump orbit Present extraction kicker system Strip-line kicker system for ILC Beam extraction.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
FCC DUMP SYSTEM W. Bartmann, B. Goddard, R. Ostojic FCC Dump Meeting, 14 th Jan
Review of FCC-hh optics & beam dynamics IPNO, Orsay, Paris November 2015 Reviewers: S. Fartoukh (CERN), O. Napoly (CEA), E. Todesco (CERN), F. Zimmermann.
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
LHC beam dump, injection system and other kickers B.Goddard, with input from L.Ducimetière, W.Bartmann, V.Mertens, J.Borburgh, M.Barnes, C.Bracco, V.Senaj,
Beam absorbers for Machine Protection at LHC and SPS
Accumulator & Compressor Rings with Flexible Momentum Compaction arccells MAP 2014 Spring Meeting, Fermilab, May 27-31, 2014 Y. Alexahin (FNAL APC)
CR: status and activities at BINP I.Koop, BINP, Novosibirsk O.Dolinskyy, GSI,Darmstadt , MAC, GSI, Darmstadt.
HF2014 Workshop, Beijing, China 9-12 October 2014 Constraints on FCC-ee lattice design Bastian Haerer Constraints on the FCC-ee.
Optics considerations for PS2 October 4 th, 2007 CARE-HHH-APD BEAM’07 W. Bartmann, M. Benedikt, C. Carli, B. Goddard, S. Hancock, J.M. Jowett, A. Koschik,
DISCUSSION OF THE ARCS AND OVERALL LATTICE INTEGRATION FCC meeting 8th of January 2015 Antoine Chance.
HF2014 Workshop, Beijing, China 9-12 October 2014 Challenges and Status of the FCC-ee lattice design Bastian Haerer Challenges.
Beam transfer considerations for LAGUNA Angelina Parfenova, W. Bartmann, L. Ducimetiere, B. Goddard, V.Kain, M.A. Kowalska, M. Meddahi, B. Puccio, F. Velotti.
Layout and Arcs lattice design A. Chancé, B. Dalena, J. Payet, CEA R. Alemany, B. Holzer, D. Schulte CERN.
Design challenges for head-on scheme Deepa Angal-Kalinin Orsay, 19 th October 2006.
First evaluation of Dynamic Aperture at injection for FCC-hh
Oleksiy Dolinskyy 1st December, 2014
Primary Beam Lines for the Project at CERN
BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS
Surviving an Asynchronous Beam Dump?
The LHC Beam Dumping System
Introduction: FCC beam dumping system
LHC beam dump 7.56 TeV operation
Injection system design for high-energy circular collider FCC-hh
Options and Recommendations for TL and Dumps
Septa requirements and suitable septa topologies for FCC
Large Booster and Collider Ring
FCC hh dump kicker - switch topologies and impact on beam
AD & I : BDS Lattice Design Changes
FCC Kicker Systems M.J. Barnes, T. Kramer CERN TE-ABT
FCC-hh injection group 7
NuSTORM - μ Storage Ring with Injection
Beam Injection and Extraction Scheme
XFEL Beam Collimation and Switchyard Review Beam Switchyard
Progress of SPPC lattice design
2017 CAS Erice case study: Design of a beam dumping system for FCC
Cui Xiaohao, Bian Tianjian, Zhang Chuang 2017/11/07
LHC (SSC) Byung Yunn CASA.
PS2 Injection/Extraction Layout
Collider Ring Optics & Related Issues
MEBT1&2 design study for C-ADS
Negative Momentum Compaction lattice options for PS2
GROUP 12 CAS – Erice - March 2017 Andrea DE FRANCO
Kicker specifications for Damping Rings
Negative Momentum Compaction lattice options for PS2
Specifications for the XFEL Beam Switchyard Kickers
Feasibility of Reusing PEP-II Hardware for MEIC Electron Ring
Feasibility of Recuperation of Magnets in Decommissioned Storage Rings
Transfer Line for EIC.
Andrew Hutton Concept suggested independently by Haipeng Wang
Fanglei Lin JLEIC R&D Meeting, August 4, 2016
Option 1: Reduced FF Quad Apertures
Presentation transcript:

REQUIREMENTS FOR FCC DILUTION KICKERS AND BEAM DUMP LINE GEOMETRY F. Burkart, W. Bartmann, M. Fraser, B. Goddard, T. Kramer FCC dump meeting 18 th June 2015

Outline Current LHC Dilution kicker requirements Beam dump line geometry Conclusion 18/06/2015FCC dump meeting 2

Reminder – LHC system 18/06/2015FCC dump meeting 3 MKBH Magnets per system4 Max. system defl. angle0.278 mrad Kick strength per magnet1.624 Tm Hor. aperture58 mm Ver. aperture32 mm Frequency14.2 kHz MKBV Magnets per system6 Max. system defl. angle0.277 mrad Kick strength per magnet1.077 Tm Hor. aperture66 mm Ver. aperture36 mm Frequency12.7 kHz Dilution kickers MKB Dump block TDE ~ 600 m

Installation in the tunnel 18/06/2015FCC dump meeting 4 Courtesy: L. Ducimetiere

BTVDD screenshot 18/06/2015FCC dump meeting 5

FCC beam dumps ~ bunches with a bunch spacing of 25 ns. Bunches separated by 1.8 mm on the TDE (Given by max. Temperature in Carbon (1500 Celsius) - A. Lechner). Bunch equally spaced dumped on the beam dump block.  Requires frequency modulation of the dilution kicker. 18/06/2015FCC dump meeting 6

How it should look like: 18/06/2015FCC dump meeting 7 R=20 cm

Zoom into the first bunches 18/06/2015FCC dump meeting mm 6 mm

Frequency and amplitude of the dilution kickers 18/06/2015FCC dump meeting 9

Frequency modulation 18/06/2015FCC dump meeting 10

Requirements for FCC dilution kickers B 50 TeV: Tm Max deflection angle with the current 50 TeV: mrad  Drift space between MKB and TDE: 4.6 km Possible Mitigations: Increase number of elements. Increase of current. Tilted MKB to gain in both planes.?? Install Quadrupole to get more kick: Variation of the drift length  beam dump line geometry. 18/06/2015FCC dump meeting 11 MKBH MKBV Quad

FCC layout 18/06/2015FCC dump meeting 12 2 dump insertions (length: 4.2 km ). Extraction and betatron collimation.

Beam dump line geometry (1/3) 18/06/2015FCC dump meeting km dump insertion2.8 km collimation insertion 2 km dump line 2 km dump line (for dilution system / drift) Dump cavern should be separated from circulating beam. Dumped beam is only about 0.7 m separated in hor. plane from FCC circulating beam, after 2 km. Needs ~100 m of 16 T dipole at 167’000 Tm. Courtesy: W. Bartmann

Dump line elements 1.4 km dump insertion 2.0 km dump line Kicker Septum 10 mrad bend MKB Absorber 18/06/2015FCC dump meeting 14  Would require: 0.12 mrad total deflection in the MKB,  Keep aperture from LHC MKB= 11 magnets (hor).  Min. extraction energy: 3.3 TeV – gain factor 7 (energy-scaling) in aperture? Will be reduced by higher  2.8 km collimation

Beam dump line geometry (2/3) 1.4 km dump insertion2.8 km collimation insertion 2 km dump line 2 km arc bend gives 150 mrad angle 150 m separation between dump cavern and ring. No additional dipoles needed. Collimation in the downstream arc needed. 18/06/2015FCC dump meeting 15 Courtesy: W. Bartmann

Dump line elements 1.4 km dump insertion 2 km dump line Kicker Septum MKB Absorber 18/06/2015FCC dump meeting 16 arc  Would require: mrad total deflection in the MKB.  Keep aperture constant = 9 magnets (hor).

Beam dump line geometry (3/3) 18/06/2015FCC dump meeting km dump insertion2.8 km collimation insertion 2 km dump line ~ 1 km dump line Feed dump line through collimation insertion. Reduces complexity of the system – less kick strength needed in kicker and septum, no additional dipoles, no additional collimation in the arc. Radiation limitations? Hot area – access limitations? Bigger tunnel diameter? Distance between collimator and dump line?

Dump line elements 18/06/2015FCC dump meeting km dump insertion 2 km dump and collimation line Kicker Septum Absorber Collimation MKB arc  Would require: mrad total deflection in the MKB.  Keep aperture constant = 6 magnets (hor).

Conclusions MKB requirements: max. deflection between 0.1 mrad and mrad depending on dump insertion geometry. Frequency up to 10 MHz. First assumption: keep apertures as in LHC. How much redundancy needed? 3 options for beam dump insertion design. With 100m dipoles and collimation downstream. Without dipoles and with dedicated collimation. Going straight through collimation insertion into beam dump line using arc separation 18/06/2015FCC dump meeting 19 Feasible?

18/06/2015FCC dump meeting 20 Thank you for your attention!

18/06/2015FCC dump meeting 21