Develop Project Charter

Slides:



Advertisements
Similar presentations
Chapter 4 Scope Management
Advertisements

Quick Recap. Quick Recap The Project Plan Plan Your Work, then Work Your Plan.
NEES Project Management Workshop June 16 June 18 1 Segment 2.
Project Scope Management
Degree and Graduation Seminar Scope Management
Project Change Management
Project Scope Management
Chapter 5: Project Scope Management
Chapter 3: The Project Management Process Groups
Chapter 5: Project Scope Management
Project Scope Management
This work is licensed under a Creative Commons Attribution 3.0 Unported LicenseCreative Commons Attribution 3.0 Unported License (CC-BY). Project Management.
Configuration Management
02 Apr 2010Saleh Eid, KAU, EMBA, PMP Course2 Introduction: Do you feel that work in this project never ends? Are the people in your team unsure of what.
Project Scope Management
Advanced Project Management Project Plan Templates
Project Management Fundamentals Project Organization and Integration
What is Business Analysis Planning & Monitoring?
CC20O7N - Software Engineering 1 CC2007N Software Engineering 1 Requirements Engineering Practices with Techniques.
PMP® Exam Preparation Course
BSBPMG502A Manage Project Scope Manage Project Scope Project Scope Processes Part 1 Diploma of Project Management Qualification Code BSB51507 Unit.
Demystifying the Business Analysis Body of Knowledge Central Iowa IIBA Chapter December 7, 2005.
PPMT CE-408T Engr. Faisal ur Rehman CED N-W.F.P UET P.
Centro de Estudos e Sistemas Avançados do Recife PMBOK - Chapter 4 Project Integration Management.
1.  Describe an overall framework for project integration management ◦ RelatIion to the other project management knowledge areas and the project life.
Week 2 Seminar: Project Scope Management
Strong9 Consulting Services, LLC 1 PMI - SVC I-80 Breakfast Roundtable Monthly Meeting Thursday, October 12, :00 am – 9:00 am.
SacProNet An Overview of Project Management Techniques.
Lecture 6. Review of Lecture 5 Company strategic planning: mission and objective statements and competitive strategy. Planning Methods: Top-down, Bottom-up.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Information Technology Project Management
Apply Project Scope Management Techniques Project Scope Processes – Part 2 Certificate IV in Project Management Qualification Code BSB41507 Unit.
Ch 4 - Learning Objectives Scope Management You should be able to: n Discuss the relationship between scope and project failure n Describe how strategic.
Project Scope Management
2 nd Knowledge Area : Project Scope Management. Importance of Good Project Scope Management 1995 CHAOS study cited user involvement, a clear project mission,
Lecture 12 Managing Project Control and Closure. Project Control The process that allows monitoring and measurement of project progress and directing.
Validate Scope What we have: Requirement Traceability Matrix Verified Deliverables What we do: Inspection What we get: Accepted Deliverables.
Project Scope Management 1. 2 Learning Objectives Understand the elements that make good project scope management important. Explain the scope planning.
Project Management Project Integration Management Minder Chen, Ph.D. CSU Channel Islands
Project Management Basics
Recent trends in IT projects – Globalization, outsourcing, and virtual teams Project management process groups – Initiating, planning, executing, monitoring.
The Project Plan Plan Your Work, then Work Your Plan
SCOPE DEFINITION,VERIFICATION AND CONTROL Ashima Wadhwa.
~ pertemuan 4 ~ Oleh: Ir. Abdul Hayat, MTI 20-Mar-2009 [Abdul Hayat, [4]Project Integration Management, Semester Genap 2008/2009] 1 PROJECT INTEGRATION.
Apply Project Scope Management Techniques Project Scope Processes – Part 2 Week 4 Certificate IV in Project Management Qualification Code BSB41507.
Project Management Processes for a Project Chapter 3 PMBOK® Fourth Edition.
Defining and Managing Project Scope. MOV Scope Phases Time Estimates Resources Tasks Schedule Budget Sequence Project Planning Framework.
Prepared by Amira Selim 31 st October 2009 Revised by Dahlia Biazid Requirements Analysis.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
6/6/ SOFTWARE LIFE CYCLE OVERVIEW Professor Ron Kenett Tel Aviv University School of Engineering.
Project Scope Management ©2011 Long Island Chapter of the Project Management Institute ALL RIGHTS RESERVED PMP Prep Course – PMBOK 4th Edition Version.
Copyright 2015 John Wiley & Sons, Inc. Project Planning Part II.
Information Technology Project Management, Seventh Edition.
Janaki Douillard & Makenzie Bryk
Part II Project Planning.
Project Planning: Scope and the Work Breakdown Structure
Scope Planning.
Module nine PMP® Mastery 2016 APMG Create WBS
Project Management BBA & MBA
Project Scope Management
Lecture 05 : Project Scope Management
Project Integration Management
TechStambha PMP Certification Training
Chapter 5: Project Scope Management
PROJECT SCOPE MANAGEMENT
CIS12-3 IT Project Management
PROJECT SCOPE MANAGEMENT
Project Scope Management
Project Scope Management
Project Scope Management
Presentation transcript:

Develop Project Charter Input: (Pre Project Activities) PSoW Business Need (Market Demand, technical advance, legal or Govt.) Product Scope Description (Product / Service / Result) Strategic Plan (Goal, Vision, Mission) Business Case (Justification) Cost Benefit Analyst (feasibility) Contract (If external customer) Tools & Techniques Expert Judgment Output: Project Charter and its content Project Purpose High level requirements High level risks Summary milestones Summary budget

Second knowledge area of Project Management Project Scope Management

Where are we We have completed the initiation process We are ready to start the Project Planning Process Purpose of this Lecture: Defining Project Goals & Objectives Discovering Requirement Agreeing on Deliverables Determining Assumptions & Constraints Compiling the Project Scope Statement

What is Scope? Project scope –The work that must be done in order to deliver a product with the specified features and functions. Project Scope Management includes the processes required to ensure that the project includes all the work required, and only the work required, to complete the project successfully, with all the requirements and characteristics agreed upon. Project Scope Management is primarily concerned with defining and controlling what is and is not included in the project.

Plan Scope Management ?

COLLECT REQUIREMENTS How requirements can be collected?

COLLECT REQUIREMENTS How do you collect requirements? INTERVIEWS (Directly with stakeholders) FOCUS GROUPS (prequalified Stakeholders & Subject matter experts) FACILITATED WORKSHOPS (Focused cross functional stakeholders) JAD Joint application design, QFD Quality function development GROUP CREATIVITY TECHNIQUES (brainstorming, nominal group technique, Delphi Technique, Idea/mind mapping, Affinity Diagram) GROUP DECISION MAKING TECHNIQUES (Unanimity, Majority, Plurality, Dictatorship) QUESTIONNAIRE AND SURVEYS (wide number of respondents) OBSERVATION (viewing individual in their environment) PROTOTYPES (early feedback by providing a working model) Bench marking, Context Diagram and Document Analysis

Collect Requirements For the requirement that you gathered, you make these three documents to proceed further. Requirement Documentation Business need or opportunity to be seized Project objectives for traceability Functional requirements (business processes, information) Non-functional requirements (level of services, performance, safety) Quality requirements Acceptance criteria Business rules Impact of other organizational area, sales, technology group Support and training requirements Requirements assumptions and constraints Requirement Management Plan How requirement activities will be planned, tracked & reported How changes to the product initiated, impact analysis and level of authorization for approval of change Requirement Prioritization process

Collect Requirements 3. Requirement Traceability Matrix A table that links requirements to their origin and traces them throughout the project life cycle. It helps to ensure that each requirement adds business value by linking it to the business and projective objectives. It provides a mean to track requirements throughout the project life cycle. Help to ensure that requirements approved in the requirement documents are delivered at the end of the project. It provides a structure for managing changes to the product scope. Attributes are associated with each requirement and recorded in the requirement traceability matrix; such as: a unique identifier, textural description of each requirement, rationale of inclusion, owner, source, priority, version, current status and date completed.

Requirement Traceability Matrix ID Associate ID Requirement Description Business Need Opportunities Goals, Objectives Project Objective WBS Deliverable Product Design Product Development Test Cases

Define Scope After collecting requirements, you do a PRODUCT ANALYSIS ( Product breakdown, requirement analysis, system engineering, value engineering and value analysis) and you also do an ALTERNATIVE IDENTIFICATION (different approaches to execute and perform the work of the project) and you produce a scope statement. Scope statement is very important for a project manager due to the following reasons: It Includes Major Deliverables It also Includes the deliverables excluded from the project I shows major assumptions and risk factors in the project It lists out all project requirements that are gathered from the previous stem It is then signed by the project manager, sponsor, major stakeholders and some vendors that may have major part to play in the project. It is a total commitment from the Project manager and the sponsor.

Project Charter Vs Project Scope Statement a comparison Purpose or Justification Measureable Project Objectives and Success Criteria High-level requirements High-level project description High-level Risk Summary Milestone Schedule Summary Budget Stakeholder List Project Approval requirements (success factor, who decides an who signs) Assigned Project Manager Name and authority of the sponsor Project Scope Statement Project Scope Description (progressively elaborated) Acceptance Criteria Project Deliverables Project Exclusions Project Constraints Project Assumptions

CREATE WBS Since in define scope, we prepare scope statement therefore we can now break the project into work packages, also known as deliverables. The technique we use in breaking project into work packages is called Decomposition. This decomposition techniques provides us an output of : WBS : It is a deliverable-oriented hierarchical decomposition of the work to be executed by the project team WBS DICTIONARY (Code, description of work, responsible organization, list of schedule milestones, associated schedule activities, resources required, cost estimates, quality requirements, acceptance criteria) SCOPE BASELINE: A component of project management plan (PSS, WBS, WBS Dictionary) PROJECT DOCUMENT UPDATE Scope Statement is then passed on to the Project Time Management and Project Quality Management to plan for Time and Quality.

Validate SCOPE INPUT TOOLS AND TECHNIQUES OUTPUTS PROJECT MANAGEMENT PLAN REQUIREMENTS DOCUMENTATION REQUIREMENTS TRACEABILITY MATRIX Verified DELIVERABLES TOOLS AND TECHNIQUES INSPECTION (Includes activities such as measuring, examining and verifying to determine whether work & deliverables meet requirement and product requirement criteria. Also called: review, product reviews, audits & walkthroughs) OUTPUTS ACCEPTED DELIVERABLES The ones that meet the acceptance criteria are formally signed off and approved. CHANGE REQUESTS (the once not meet acceptance run through project integrated change control process) PROJECT DOCUMENT UPDATES

CONTROL SCOPE INPUT; PROJECT MANAGEMENT PLAN Scope base line is compared to actual Scope management plan describes how to manage and control scope Change management plan Configuration management plan (those items that require formal change control) Requirement measurement plan WORK PERFORMANCE INFORMATION Information about project process REQUIREMENTS DOCUMENTATION REQUIEMENT TRACEABILITY MATRIX ORGANIZATIONAL PROCESS ASSETS Existing formal & informal scope control related policies, procedures and guidelines Reporting and monitoring methods to be used **Control Scope is the process of monitoring the status of the project and product scope and managing changes to the scope baseline. Controlling the project scope ensures all requested changes and recommended corrective or preventive actions are processes through the Perform Integrated Change Control process. Uncontrolled changes are often referred as Project Scope Creep.

Control Scope TOOLS AND TECHNIQUES OUTPUTS VARIANCE ANALYSIS: assess the magnitude of variation from original scope baseline. OUTPUTS WORK PERFORMANCE MEASUREMENTS (Planned vs Original) ORGANIZATIONAL PROCESS ASSETS UPDATES (causes of variance, corrective measures, lesson learned) CHANGE REQUESTS to the scope baseline or other components of project management plan PROJECT MANAGEMENT PLAN UPDATES Scope baseline cost baseline and schedule baselines update, PROJECT DOCUMENT UPDATES Requirements documentation Requirement traceability matrix

Thank You Any Questions? Next Lecture: Project Time Management