1 PTC 101 A primer for PTC PTC 101 A primer for PTC.

Slides:



Advertisements
Similar presentations
Positive Train Control Benefits
Advertisements

SCORT/TRB Rail Capacity Workshop - Jacksonville Florida1 1  A Primer on Capacity Principles  New Technologies  Public Sector Needs 22 September
2008 Mid-States Highway–Rail Grade Crossing Safety Conference May 20, 2008 David Peterson.
1 Federal Railroad Administration Railroad Safety Advisory Committee On-Track Safety Adjacent Tracks Safety Advisory No April 27, 2004.
Union Pacific and the Environment Armour Yellow Outside -- Green Inside ORULE Meeting – October 2, 2008.
1 Union Pacific Railroad David Wickersham Chief Engineer, Western Region February 24, 2014.
Positive Train Control Allison I. Fultz Kaplan Kirsch & Rockwell LLP Washington, DC 2010 LEGAL AFFAIRS SEMINAR February 23, 2010.
Connected Vehicles AASHTO Annual Meeting | October 17, 2013 | Denver, CO Mike Cammisa Director, Safety Association of Global Automakers.
National Rail Safety Investigations in Australia International Rail Safety Conference Vancouver – Oct 2013 Tony Simes Manager - Rail Coordinator.
Impacts of “MAP-21”on the National Bridge Inspection Program Tribal Government Coordination Meeting Date August 7, 2014 Presented by: Gary Moss, P.E. Acting.
Clarendon, Texas May 28, 2002 Collision of Two Burlington Northern Santa Fe Freight Trains.
Amtrak Advanced Civil Speed Enforcement PTC System Status Report
Conductor Decertification Discipline
The Federal Regulator’s Perspective Industrial Railway Safety Conference Fort Saskatchewan, Alberta April 28, 2015.
Guidelines for Traffic Control at Surface Mines
Railway Safety Plan and Its Status in Korea
Road charging and vehicle taxation - the EU perspective
The Rail Safety Improvement Act of 2008 Issues For Rail Industry Contractors Kevin M. Sheys Partner K&L Gates LLP January 9, 2009.
Randy Wade TRB Intercity Passenger Rail Committee Tuesday January 25, 2011 Washington, DC.
M IAMI F ORT L AUDERDALE W EST P ALM B EACH O RLANDO Addresses Florida’s demand for express, intercity rail travel. Is designed to serve tourists, business.
Japan’s Efforts to Ensure Safety of Railways October 12th, 2010 Railway Bureau MLIT.
CE 515 Railroad Engineering
Electronic Train Management System and Safety Larry Milhon March 9, 2007.
Module 13: Highway-Rail Grade Crossings (HRGC)
1 Development of California Regulations for the Testing and Operation of Automated Vehicles on Public Roads Steven E. Shladover, Sc.D.Ching-Yao Chan, Ph.D.
ARRC Collision Avoidance System
ERTMS state of the art and evolution of the applications considering customer’s orientations.
IntelliDrive Policy and Institutional Issues Research Valerie Briggs Team Lead, Knowledge Transfer and Policy, ITS Joint Program Office, RITA May 4, 2010.
Federal Railroad Administration's Ruling:
BEWAG (UIP) General assembly European Railway Agency Jean-Marie DECHAMPS, Head of Sector (Safety) Brussels, 27 April 2015.
Positive Train Control Labor Briefing Washington, DC December 10, 2008.
 Classes of trains  Fundamental principles of track authority  Impact of power/ton ratios  Drivers of dispatch priority 22 September 2010 SCORT/TRB.
North Carolina Rail Division Staff of about 50 Mission to: Improve & expand passenger rail service Improve safety at crossings Provide industrial access.
Doc.: IEEE ptc SubmissionKevin Nichter, Lilee SystemsSlide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
1 Supplemental Regulations to 34 CFR Part 300 Assistance to States for the Education of Children with Disabilities and Preschool Grants for Children with.
The Railroad Industry Local Operations And Future Challenges.
Office of Railroad, Pipeline & Hazardous Materials Investigations Right-of-Way Procedures & Safety Rules Compliance.
Foreign Supplier Verification Programs Supplemental Proposal 1.
C B T M Communications Based Train Management
September 25, 2013 Greg Davis FHWA Office of Safety Research, Development and Test Overview of V2I Safety Applications.
AASHTO Standing Committee on Rail Transportation Denver, Colorado September 2014.
Working Party on Rail Transport – 63rd session Geneva, 18 November 2009 EUROPEAN COMMISSION.
European Commission 1 Directorate General for Energy and Transport Discussion for a co-ordinated trans-European Deployment Plan for ERTMS 15 June 2004.
Section III Day 3 1 DMV Manual pgs The day has finally arrived. You are officially a licensed driver. It is such a big event that the school paper.
Safe Transport of Energy Products Rail Related Rulemaking Update
A Good Year for Short Lines & Regionals Dave Mears Senior Director American Short Line and Regional Railroad Association ACACSO Conference Orlando, FL.
POSITIVE TRAIN CONTROL What it is, and what it does SCORT – September 2015.
John McBride Locomotive Engineer Kirk Thomas Conductor Kevin Mahoney Road Foreman John Pepe Rail Traffic Controller Bruce Parkin FRA.
1 PTC Update ACACSO May 2011 PTC Update ACACSO May 2011.
Summary and Wrap-up Discussion 8 July 2015
Safety Concerns: Robotics Georgia CTAE Resource Network Curriculum Office Written by: E.L. Decker July 2009.
Positive Train Control The impact of legislative changes SCORT Chris Heald September 22, 2009.
MNM Fatal Powered Haulage Accident Powered Haulage Accident May 17, 2013 (New Mexico) May 17, 2013 (New Mexico) Underground Molybdenum Mine Underground.
49 CFR PART 240 Qualification and Certification of Locomotive Engineers.
Hazmat HM-246 Enhancing Railroad Tank Car Safety William S. Schoonover Chief, Hazardous Materials Division Federal Railroad Administration Presentation.
Freight Railway Integration Strategy For Inter-American Development Bank Transport Week 2009 by Transportation Technology Center, Inc. (TTCI) Subsidiary.
6/12/2016 FRA – Office of Railroad Safety Moving America Forward F E D E R A L R A I L R O A D A D M I N I S T R A T I O N F RA Regulatory Activity Update.
Positive Train Control Implementation of the Rail Safety Improvement Act Mandate: Elements of an Agreement?
APTA Webinar with Congressional Rail Staff– Overview of the FAST Act
Regional Road Safety Workshop
MBTA/MassDOT RAILROAD QUIET ZONES
Positive Train Control
Green Line Train Protection System
University of Colorado A Line and B Line Grade Crossing Update
OVERVIEW: POSITIVE TRAIN CONTROL (ptc)
APTA Webinar with Congressional Rail Staff– Overview of the FAST Act
Designed-in Logic to Ensure Safety of Integration and Field Engineering of Large Scale CBTC Systems Author: Fenggang Shi.
October 2011 doc.: IEEE ptc September 2012
<month year> doc.: IEEE ptc May 2012
System Safety Regulation
Presentation transcript:

1 PTC 101 A primer for PTC PTC 101 A primer for PTC

22 Oct 16, Railroad Safety Improvement Act signed into law July 21, 2009 – FRA Published Notice of Proposed Rule Making (NPRM) Jan 15, 2010 – FRA Published Final Rule Apr 16, Deadline for Railroads to Submit PTC Implementation Plans to FRA Dec 31, Deadline for PTC Implementation Congress mandated PTC implementation by the end of 2015 Completing required work by 2015 is an ambitious goal

33 PTC legislation requires specific functionality PTC gauges upcoming signals, authorities, switches, operating conditions, locomotive position & speed PTC designed to warn engineer of need for action If the engineer fails to act, PTC system will engage locomotive brakes and bring train to full stop Prevent movement through misaligned switches Protect track workers Prevent train to train collisions Prevent overspeed derailments If railroaders do their jobs correctly, PTC should never engage the brakes

4 PTC is required on the following: All roads providing or hosting intercity or commuter passenger service Class I roads — Track with one or more PIH (poisonous inhalant) cars annually and — traffic greater than 5 million gross tons annually Class II and III roads — Must be equipped:  If there is passenger service on the route  in other special circumstances as described in the regulation

Regulation requires the submission of three plans PTC Development Plan — Describes the PTC technology to be implemented PTC Implementation Plan — Describes when and where the PTC system will be implemented — How interoperability with class I’s, commuters, and short lines will be achieved PTC Safety Plan required for PTC System Certification — Describes how the safety of the system will be ensured — Contents include:  Railroad Training Plan  Operations and Maintenance Manual  Configuration and Revision Control Measures  Initial Implementation Procedures  Post Implementation Testing and Monitoring Procedures 5

66 PTC System Overview Initialization Track Database Speed Restrictions Work Zones Train Consist Movement Authorities Braking Curve Warning Curve Predictive Braking Speed Restrictions Switches Work Zones Signals

77 Interoperability Locomotive fleet age and mix Wayside plant age and mix Equipping switches in un-signaled territories Scale of changes and increase in workload Compressed timeline Unproven technology Heavy reliance on suppliers Huge capital requirements Why is PTC so challenging?

88 Class I Railroads Passenger Railroads Class Is agreed to develop standard platform PTC must be able to recognize and stop foreign locomotives PTC legislation requires industry interoperability

99 Wayside installs must be tailored to existing plant...

10... which varies from location to location...

11... including some very old equipment

12 Equipping dark territories presents special challenges Switches must be equipped with: — Switch position monitors — Wayside interface units — Communications — And a power source Infrastructure availability varies by territory Some territories require the installation of: — Electricity — Communications Alternate energy sources are necessary in some areas

13 PTC technology is still in development Onboard and office system requirements are still being refined The 220 MHz radio (required for interoperability) is still being specified — Production radios will not be available until Jan 2012 Final wayside interface units have not been received from all suppliers

14 Two suppliers are delivering major technology components of PTC Wabtec Railway Electronics — Onboard segment — Office segment MeteorComm — 220 MHz radio design — Messaging software — Systems Management software Supplier management is critical to project success

15 FRA places the cost benefit ratio for PTC at 22:1 PTC will prevent a small percentage of train accidents PTC will not prevent: — Track failure related accidents — Equipment failure related accidents — Grade crossing accidents “FRA recognizes that the likelihood of business benefits is uncertain and that the cost-to-benefit comparison of this rule, excluding any business benefits, is not favorable” – PTC Regulatory Impact Analysis

16 Interoperability across the United States Magnitude of wayside installations Short timeline with mandatory completion in 2015 Technology still under development Huge capital requirements PTC is challenging...

17 Questions ?