Dan Donecker BAE/MAE – Structural Option Senior Thesis Project 35 West 21 st Street New York, New York.

Slides:



Advertisements
Similar presentations
ASHA National Office Building 2011 AE Senior Thesis Ryan Dalrymple 5 th year Structural Option BAE/MAE Advisor: Dr. Thomas Boothby Photo Courtesy of Boggs.
Advertisements

The Optimus Signature Boutique Offices, India AE Senior Thesis 2013 Punit G. Das | Structural Option Faculty Advisor: Dr. Linda Hanagan.
Fraser Centre State College, PA Tyler Strange Structural Option Consultant: Dr. Thomas Boothby April 13, 2011 Tyler StrangeStructural Option Fraser Centre.
Milton S. Hershey Medical Center Biomedical Research Building Joshua Zolko, Structural Option.
Carl Hubben – Structural Option Ae senior thesis Office Building-G EASTERN UNITED STATES.
MICA GATEWAY RESIDENCE BALTIMORE, MARYLAND SCOTT MOLONGOSKI SENIOR THESIS STRUCTURAL OPTION ADVISOR: PROFESSOR SUSTERSIC.
The Pennsylvania State University Architectural Engineering Structural Emphasis Advisor: Dr. Andres Lepage Steven Stein ROOSEVELT ISLAND SOUTHTOWN BUILDING.
Jeremiah Ergas AE 482 – 5 th Year Senior Thesis Structural Option April 15 th, 2008 Faculty Consultant: Dr. Ali Memari Northside Piers – Brooklyn, NY Structural.
A Medical Office Building For The Primary Health Network Daniel Goff I Structural Option Dr. Thomas Boothby l Faculty Advisor Sharon, Pennsylvania Source:
Penn State Hershey Medical Center Children’s Hospital Hershey, Pennsylvania Matthew Vandersall Structural Option AE Senior Thesis Dr. Richard Behr.
The University Sciences Building Northeast, USA Final Presentation Chris Dunlay Structural Option Dr. Boothby.
Jonathan E. Aberts Spring 2009
University Health Building Thesis Final Presentation
Courtesy of Holbert Apple Associates Georgia Avenue Building Introduction Statistics Gravity System Lateral System Problem Statement & Solution.
Samuel M. P. Jannotti Structural April 14, 2008 American Eagle Outfitters Quantum III: South Side Works.
LOCKWOOD PLACE BALTIMORE, MARYLAND Monica Steckroth- Structural Option.
360 State Street New Haven  CT  Structural | Sabrina Duk | T. Boothby.
JOSEPH MUGFORD THESIS PRESENTATION SPRING 2007 SOHO HIGH RISE CONDOMINIUMS A STUDY OF LIGHTWEIGHT CONCRETE CONSTRUCTION.
Rockville Metro Plaza II Rockville Pike John Vais | Structural Option PSU AE Senior Thesis 2014 Faculty Advisor – Dr. Hanagan Rockville, Maryland
Hershey Research Park Building One Jonathan Krepps Structural Option Senior Thesis 2013 Faculty Advisor: Dr. Hanagan.
Jonathan Coan AE Senior Thesis April 10, 2012 Weill Cornell Medical Research Building New York, NY Images courtesy of Ennead Architects.
Senior Thesis Structural Option Ryan Friis Spring Morgan St. Chicago, IL 111 Morgan St. Chicago, IL Ryan Friis Structural Option.
GARY NEWMAN STRUCTURES OPTION ADVISOR: DR. HANAGAN SENIOR THESIS PRESENTATION SPRING 2008.
Southeast View of IRMC West View of IRMC. Presentation Outline Introduction Existing Structure Thesis Goals Structural Depth Lighting Breadth Conclusion.
BRYAN DARRIN SENIOR THESIS PRESENTATION MILLENNIUM HALL DREXEL CAMPUS PHILADELPHIA, PA.
Structural System Redesign Existing Conditions Proposal Gravity Design Lateral Design Cost Comparison Schedule Impact Conclusions.
The Odyssey Condominium Aaron Snyder Arlington, Virginia
SEAN BEVILLE STRUCTURAL OPTION ADVISOR: PROF. BOOTHBY APRIL 13, 2009 TEMECULA MEDICAL CENTER “STRUCTURAL SYSTEM OPTIMIZATION” THE DEPARTMENT OF ARCHITECTURAL.
Joe Sharkey Structural Option Christiana Hospital 2010 Project Newark, DE.
Lancaster, PA Courtyard by Marriott Danielle Shetler - Structural Option Senior Thesis - Spring 2005.
Gateway Plaza Wilmington, DE Elizabeth Hostutler Structural Option.
300 North La Salle Liam McNamara BAE / MAE Senior Thesis April 13 th, 2010.
The Towers at the City College of New York Robin Scaramastro - Structural Option - Advisor: Dr. Memari Senior Thesis Final Presentation – Spring 2007.
URS – ARENA DISTRICT OFFICE BUILDING DAVID LEE STRUCTURAL OPTION.
Third Avenue NY, New York Michelle L. Mentzer Structural Option.
Mountain Hotel Urban Virginia Senior Thesis 2013 Faculty Advisor: Professor Kevin Parfitt Benjamin Borden Structural Option.
Whiteland Village Mary Longenecker Structural Option Senior Thesis August 7, 2007.
Ryan Pletz Structural Dr. Hanagan The Pennsylvania State University Department of Architectural Engineering Senior Thesis April 14, 2008.
Christopher Simmons l Structural Option AE Senior Thesis l Spring 2010 Faculty Consultant l Dr. Ali M. Memari Baltimore Hilton Convention Center Baltimore.
Senior Thesis 2006 The Pennsylvania State University
Jonathan Goodroad Structural Option 2005 Thesis Penn State AE Delaware State University Administration and Student Services Building.
T IMOTHY H P ARK – S TRUCTURAL O PTION. Building Summary Current Systems Proposal Description Gravity Lateral Other Structural Factors Breadth Options.
N EW Y ORK, N EW Y ORK 100 Eleventh Avenue © Tyler E. Graybill | Structural Option AE Senior Thesis Presentation | April 12, 2010 Faculty.
Brad Oliver – Structural Option Advisor – Professor Memari.
Oklahoma University Children’s Medical Office Building Oklahoma City, Oklahoma AE Senior Thesis Final Report April 14, 2014 Jonathan Ebersole Structural.
Fordham Place Bronx, NY Aric Heffelfinger Structural Option Spring 2006.
Justin Purcell Structural Option Advisor: Dr. Hanagan.
Introduction 120,000 SF 10 Stories (90ft) $40 Million Aug – Dec.2011 Presentation Outline Introduction Base Steel Redesign Progressive Collapse Tie.
Park Potomac Office Building “E” Kyle Wagner l Structural Option AE Senior Thesis l Spring 2010 Faculty Consultant l Prof. Kevin Parfitt.
Eastern USA University Academic Center Alexander AltemoseIStructural Option.
SteelStacks Performing Arts Center Sarah Bednarcik | Structural BAE/MAE Faculty Advisors: Dr. Linda Hanagan & Dr. Ali Memari Spring Thesis 2013Bethlehem,
AE Senior Thesis 2009 U.S. Pharmacopeia Headquarters Consolidation Rockville, MD Analysis and Design of a Mild Reinforced One way slab with Post Tensioned.
Student Health Center Jacob Brambley - AE (structural option)
Chagrin Highlands Building One Beechwood, Ohio Branden J. Ellenberger - Structural Option Senior Thesis 2004.
Michael A. Troxell Structural Option Senior Thesis 2006 The College of Business Administration Northern Arizona University Flagstaff, Arizona.
Biobehavioral Health Building The Pennsylvania State University Daniel Bodde Structural Option Advisor – Heather Sustersic.
THE NORTHBROOK CORPORATE CENTER Redesign of the Lateral Load Resisting System.
John Pillar Hampton Inn & Suites National Harbor, Md Advisor: Dr. Memari Distinguished Speaker Series, Spring 2007.
William W. Wilkins Professional Building Columbus, Ohio Michelle Benoit Senior Thesis Presentation Spring 2007 Structural Option.
Hunter Woron Spring 2012 Structural Professor Parfitt.
R. Bryan Peiffer– Structural Option AE Senior Thesis 2011 Three PNC Plaza, Pittsburgh Pa.
Mountain State Blue Cross Blue Shield Headquarters
Pearl Condominiums Philadelphia, PA
CONDOMINIUM TOWER & PARKING
Advisor: Professor M. Kevin Parfitt
Introduction James W. & Frances G. McGlothlin Medical Education Center
Ryan Johnson - Structural Option
TOWERS CRESCENT BUILDING B Mike Synnott Structural.
North Shore at Canton The Pennsylvania State University
RiverView Condominiums II Chicago, IL
Presentation transcript:

Dan Donecker BAE/MAE – Structural Option Senior Thesis Project 35 West 21 st Street New York, New York

35 West 21 st Street Dan Donecker – Structural Option Presentation Outline Building Introduction Existing Conditions Thesis Proposal Structural Redesign: Gravity Structural Redesign: Lateral Breadth Redesign: Architecture Comparison of Existing and Redesigned Building Questions

35 West 21 st Street Dan Donecker – Structural Option Existing Conditions - General Location: 35w 21 st Street, NY, NY 16 Stories – 160 ft above grade 162,000 sq. ft Occupancy: First floor Retail Stories 2-15, Residential Owner: Roseland Associates Architect: SLCEArchitects Struct. Engr.: DeSimone Consulting Engineers Mech. Engr.: Cosentini Associates CM: Plaza Construction Corporation

35 West 21 st Street Dan Donecker – Structural Option Existing Conditions - Architecture Building composed of two sections 16 story tower (blue) 8 story tower (green) N

35 West 21 st Street Dan Donecker – Structural Option Existing Conditions -Architecture -Towers connected at Two levels Classic stone façade

35 West 21 st Street Dan Donecker – Structural Option Existing Conditions -Structural: floor Two – way flat plate 8” thick (typ.) 5 ksi concrete Studrails at columns with high shear N

35 West 21 st Street Dan Donecker – Structural Option Existing Conditions -Structural: Columns Rectangular Col. No typical size No typical spacing Position governed by architecture 5.95 ksi concrete Studrails in areas of high shear N

35 West 21 st Street Dan Donecker – Structural Option Existing Conditions -Structural: Lateral system Shear wall system 5.95 ksi concrete Position governed by architecture N

35 West 21 st Street Dan Donecker – Structural Option Thesis Proposal -Summary Create regular column grid Minimize floor thickness Optimize lateral system Integrate architecture and structural Remove ceiling cavity

35 West 21 st Street Dan Donecker – Structural Option Thesis Proposal -Goals The ultimate goal of this thesis is to minimize the floor-to- floor height of each story in order to add an extra floor without increasing the overall building height. Also to increase constructability by providing a regular column grid and typical column sizes

35 West 21 st Street Dan Donecker – Structural Option Structural Redesign: - Gravity Columns Create Regular Column Grid Design Columns Per New Grid

35 West 21 st Street Dan Donecker – Structural Option Structural Redesign: - Gravity Columns N Existing column layoutRevised column layout

35 West 21 st Street Dan Donecker – Structural Option Structural Redesign: -Gravity Columns Column load take down spreadsheet PCA Slab for moments

35 West 21 st Street Dan Donecker – Structural Option Structural Redesign: -Gravity Columns PCA Column used to design gravity columns for biaxial bending and compression

35 West 21 st Street Dan Donecker – Structural Option Structural Redesign: -Gravity Columns Number of columns reduced Existing – 31 Redesign – 16 Number of different cross sections Existing – 14 Redesign – 3

35 West 21 st Street Dan Donecker – Structural Option Structural Redesign: - Gravity Floor Post-Tension 2-way Flat Plate Reduce Floor Thickness Add Another Level? Picture from Holbert Apple Associates, Inc.

35 West 21 st Street Dan Donecker – Structural Option Structural Redesign: - Gravity Floor Post-Tension 2-way Flat Plate Per Chapter 13 & 18 of ACI Frame 1 Frame 4 Frame 3 Frame 2

35 West 21 st Street Dan Donecker – Structural Option Structural Redesign: - Gravity Floor Post-Tension 2-way Flat Plate PCA Slab used to determine moments and shears FRAME 1

35 West 21 st Street Dan Donecker – Structural Option Structural Redesign: - Gravity Floor

35 West 21 st Street Dan Donecker – Structural Option Structural Redesign: - Gravity Floor

35 West 21 st Street Dan Donecker – Structural Option Structural Redesign: -Gravity Floor Studrail Design Decon Studrail design

35 West 21 st Street Dan Donecker – Structural Option Structural Redesign: - Gravity Floor 10 – ½” Diam. Strands 20 – ½” Diam. Strands 20 – ½” Diam. Strands 1 – ½” Diam. 12 (typ.)

35 West 21 st Street Dan Donecker – Structural Option Structural Redesign: -Gravity Floor Existing floor thickness – 8” Redesigned floor thickness – 6” Additional 26” of height available Decreased cu. Yd. of Concrete needed Increased difficulty of construction

35 West 21 st Street Dan Donecker – Structural Option Structural Redesign: - Lateral Optimize Shear Walls Integrate into new grid and arch. Do not decrease performance

35 West 21 st Street Dan Donecker – Structural Option Structural Redesign: - Lateral Existing shear wall planRedesigned shear wall plan N

35 West 21 st Street Dan Donecker – Structural Option Structural Redesign: - Lateral Performance not decreased by new plan

35 West 21 st Street Dan Donecker – Structural Option Structural Redesign: -Lateral – loads/drifts Wind – ASCE 7-05 CH. 6 Seismic – ASCE 7-05 CH. 11 & 12 % Diff. wind = 1.1 % Diff. seismic = 3.8 %

35 West 21 st Street Dan Donecker – Structural Option Structural Redesign: -Lateral – Shear wall design Explicit modeling of basement walls and ground floor diaphragm Large increase in maximum shear wall force Shear reversal 87% increase

35 West 21 st Street Dan Donecker – Structural Option Structural Redesign: -Lateral – Shear wall design Reinforcement governed By Minimum per ACI Chapters 10, 11 & 14 Chapter 21 need not be considered Ordinary reinforced conc. Shear wall

35 West 21 st Street Dan Donecker – Structural Option Structural Redesign: -Lateral – Shear construction No link beams in new design Existing cu. Yd of Conc. = 575 Redesign Cu. Yd of Conc. = % increase Attribute needed increase in concrete to explicit modeling of basement and ground floor diaphragm

35 West 21 st Street Dan Donecker – Structural Option Architectural Breadth: -Floor Plans Integrate structural grid and new shear wall plan with architecture Existing Arch. Floor PlanRedesigned Arch. Floor Plan

35 West 21 st Street Dan Donecker – Structural Option Mechanical Breadth: -Individual Heat Pumps Remove ceiling cavity Replace mechanical ductwork with Individual Air-to-Air Heat pumps for each apartment unit

35 West 21 st Street Dan Donecker – Structural Option Conclusions: Reduced slab thickness of 2” Reduced ceiling cavity of 6” Total reduction in height of 9’-6” Allows for additional story Additional story has little effect on wind and seismic resisting elements as well as foundations Decreased cost of construction for columns Additional revenue from extra story outweighs the upfront costs of a post-tensioned slab. Overall, Redesign is recommended

35 West 21 st Street Dan Donecker – Structural Option Acknowledgements: DeSimone Consulting Engineers – Ben Downing and Josh Gerard All of the AE Faculty Especially : o Professor Parfitt o Dr. Lepage o Dr. Memari Thesis Advisor: o Dr. Boothby

35 West 21 st Street Dan Donecker – Structural Option Questions?