554-556 Third Avenue NY, New York Michelle L. Mentzer Structural Option.

Slides:



Advertisements
Similar presentations
Introduction to Lateral Force Resisting Systems
Advertisements

ASHA National Office Building 2011 AE Senior Thesis Ryan Dalrymple 5 th year Structural Option BAE/MAE Advisor: Dr. Thomas Boothby Photo Courtesy of Boggs.
The Optimus Signature Boutique Offices, India AE Senior Thesis 2013 Punit G. Das | Structural Option Faculty Advisor: Dr. Linda Hanagan.
Carl Hubben – Structural Option Ae senior thesis Office Building-G EASTERN UNITED STATES.
Design of Tension Members
Connections and Bracing Configurations
Design of Tension Members
BIMception Proposal Thomas Villacampa Alexander Stough Christopher Russell Stephen Pfund.
Jeremiah Ergas AE 482 – 5 th Year Senior Thesis Structural Option April 15 th, 2008 Faculty Consultant: Dr. Ali Memari Northside Piers – Brooklyn, NY Structural.
Milton S. Hershey Medical Center Biomedical Research Building Joshua Zolko, Structural Option.
Penn State Hershey Medical Center Children’s Hospital Hershey, Pennsylvania Matthew Vandersall Structural Option AE Senior Thesis Dr. Richard Behr.
Rectangular framed structures
The University Sciences Building Northeast, USA Final Presentation Chris Dunlay Structural Option Dr. Boothby.
High Rise Structural Systems
Crocker West Building State College, Pa Eric M. FosterStructural OptionSpring 2009.
Hershey Academic Support Center Structural Option Shawn Jones Building Analysis of the Hershey Academic Support Center Hershey, PA Shawn Jones Structural.
Courtesy of Holbert Apple Associates Georgia Avenue Building Introduction Statistics Gravity System Lateral System Problem Statement & Solution.
Samuel M. P. Jannotti Structural April 14, 2008 American Eagle Outfitters Quantum III: South Side Works.
360 State Street New Haven  CT  Structural | Sabrina Duk | T. Boothby.
World Trade Center 7 Building Performance Assessment.
George Read Hall The University of Delaware
Reading Structural Drawings
Rockville Metro Plaza II Rockville Pike John Vais | Structural Option PSU AE Senior Thesis 2014 Faculty Advisor – Dr. Hanagan Rockville, Maryland
Senior Thesis Structural Option Ryan Friis Spring Morgan St. Chicago, IL 111 Morgan St. Chicago, IL Ryan Friis Structural Option.
All Hakuna Resort photos in courtesy of LMN Development LLC Young Jeon Structural Option Advisor: Heather Sustersic Hakuna Resort AE Senior Thesis 2015.
TOPICS COVERED Building Configuration Response of Concrete Buildings
Nick Szakelyhidi Structural Option Office Building Washington, DC Nick Szakelyhidi Structural Option.
GARY NEWMAN STRUCTURES OPTION ADVISOR: DR. HANAGAN SENIOR THESIS PRESENTATION SPRING 2008.
AMERICAN EAGLE OUTFITTERS Quantum II Corporate Headquarters Michael Sandretto Spring – 2007 Structural Option.
Southeast View of IRMC West View of IRMC. Presentation Outline Introduction Existing Structure Thesis Goals Structural Depth Lighting Breadth Conclusion.
BRYAN DARRIN SENIOR THESIS PRESENTATION MILLENNIUM HALL DREXEL CAMPUS PHILADELPHIA, PA.
Structural System Redesign Existing Conditions Proposal Gravity Design Lateral Design Cost Comparison Schedule Impact Conclusions.
Final Thesis Presentation Washingtonian Center Lee ResslerApril 15, 2008 Faculty Advisor: Dr. Memari.
The Odyssey Condominium Aaron Snyder Arlington, Virginia
SEAN BEVILLE STRUCTURAL OPTION ADVISOR: PROF. BOOTHBY APRIL 13, 2009 TEMECULA MEDICAL CENTER “STRUCTURAL SYSTEM OPTIMIZATION” THE DEPARTMENT OF ARCHITECTURAL.
Lancaster, PA Courtyard by Marriott Danielle Shetler - Structural Option Senior Thesis - Spring 2005.
Mathew Nirenberg AE Senior Thesis Structural Option.
Moment Connection Requires Bolts Outside the Flanges
URS – ARENA DISTRICT OFFICE BUILDING DAVID LEE STRUCTURAL OPTION.
Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.
Dan Donecker BAE/MAE – Structural Option Senior Thesis Project 35 West 21 st Street New York, New York.
Howard County General Hospital Patient Tower Addition Columbia, MD Kelly M. Dooley Penn State Architectural Engineering Structural Option.
Whiteland Village Mary Longenecker Structural Option Senior Thesis August 7, 2007.
Nicholas Reed Structural Option Seneca Allegany Casino Hotel Addition AE Senior Thesis 2013 Courtesy of Jim Boje, PE.
Welcome to Daniel Painter’s Architectural Engineering Senior Thesis Presentation of Two Freedom Square April 16, 2003 Pennsylvania State University.
Senior Thesis 2006 The Pennsylvania State University
Brad Oliver – Structural Option Advisor – Professor Memari.
Fordham Place Bronx, NY Aric Heffelfinger Structural Option Spring 2006.
Justin Purcell Structural Option Advisor: Dr. Hanagan.
Computer Associates International, Regional Office
Park Potomac Office Building “E” Kyle Wagner l Structural Option AE Senior Thesis l Spring 2010 Faculty Consultant l Prof. Kevin Parfitt.
Eastern USA University Academic Center Alexander AltemoseIStructural Option.
James C. Renick School of Education PSU AE Senior Thesis 2006 Mick Leso - Structural North Carolina A&T State University - Greensboro.
Brandon mckee ae senior thesis 2007 construction management penn state university ambridge area high school Ambridge Area High School ambridge, pennsylvania.
Chagrin Highlands Building One Beechwood, Ohio Branden J. Ellenberger - Structural Option Senior Thesis 2004.
Biobehavioral Health Building The Pennsylvania State University Daniel Bodde Structural Option Advisor – Heather Sustersic.
THE NORTHBROOK CORPORATE CENTER Redesign of the Lateral Load Resisting System.
Arlington Gateway Hotel 801 North Glebe Road Arlington, Virginia Michael Gray Penn State University AE Senior Thesis Presentation 2005.
Hunter Woron Spring 2012 Structural Professor Parfitt.
Structural Systems Design for a Laramie Office Building
Pearl Condominiums Philadelphia, PA
CONDOMINIUM TOWER & PARKING
Chapter-2 Parts of Steel Bridges.
Introduction James W. & Frances G. McGlothlin Medical Education Center
Outline Introduction Structural Redesign Gravity System
North Shore at Canton The Pennsylvania State University
Project: 250 West Street, Columbus, Ohio
Mitre III Building McLean VA Debra Schroeder Structural Option.
Masonry Bearing Walls.
RiverView Condominiums II Chicago, IL
Presentation transcript:

Third Avenue NY, New York Michelle L. Mentzer Structural Option

Third Avenue – The Aurora Michelle L. Mentzer – Structural Emphasis Outline Building Information Structural Background Problem Statement Proposal Structural Design Architecture Construction Management Conclusions

Third Avenue – The Aurora Michelle L. Mentzer – Structural Emphasis Design Team Owner  Maidman Development Architect  H. Thomas O’Hara Architects Structural Engineer  DeSimone Consulting Engineers CM  BrawnMade Construction  Tishman Staff MEP Engineer  MGJ Associates

Third Avenue – The Aurora Michelle L. Mentzer – Structural Emphasis Location 37 th Street and Third Avenue Midtown Manhattan

Third Avenue – The Aurora Michelle L. Mentzer – Structural Emphasis Building Information 30 Stories 120,000 sq. ft sq. ft. Footprint Residential occupancy  Ground floor Retail space Residential lobby  Fifth floor Fitness room Living units Ground Floor Fifth Floor

Third Avenue – The Aurora Michelle L. Mentzer – Structural Emphasis Building Information Residential occupancy  Floors 2-24 Marriott ExecuStay Suites  Floors Double height condominiums Floor 8-24 Floor 25-30

Third Avenue – The Aurora Michelle L. Mentzer – Structural Emphasis Structural Background Gravity System Flat plate concrete construction Floors 6-30 cantilever over buildings on 2 sides  Flat plate supports cladding load at cantilevers Column walks shift loads toward building interior Post-tensioning in slabs and columns near walks Mat Foundation

Third Avenue – The Aurora Michelle L. Mentzer – Structural Emphasis Structural Background Column Walk Column 12 on floor 5 Column 18 on floor 8 Resembles a wall between levels

Third Avenue – The Aurora Michelle L. Mentzer – Structural Emphasis Structural Background Lateral System Wind loads govern for design loads Shear wall core  Relatively uniform throughout building  Link beams connect walls above door openings  Extends above main roof to enclose penthouse

Third Avenue – The Aurora Michelle L. Mentzer – Structural Emphasis Problem Statement Architectural style limited by thin cantilever slabs that cannot support heavy cladding ADOSS model proved slabs would fail with heavy cladding load Metal panels are the only option

Third Avenue – The Aurora Michelle L. Mentzer – Structural Emphasis Proposal Develop an additional support system capable of carrying excess cladding loads  Steel trusses at roof level  Tension members hanging from trusses carry loads Change façade through architectural precast panels and roof trusses Determine impact these changes have on construction schedule, site layout and cost

Third Avenue – The Aurora Michelle L. Mentzer – Structural Emphasis Structural Design Truss Design Braced frames replace shear walls above roof System modeled in RISA Applicable load cases considered Continuous top & bottom chords Pins at all other locations Fixed supports at columns and shear walls

Third Avenue – The Aurora Michelle L. Mentzer – Structural Emphasis Structural Design Supporting Columns Located wherever a truss joint coincides with a column/shear wall Connections not necessarily centered on column

Third Avenue – The Aurora Michelle L. Mentzer – Structural Emphasis Structural Design Truss and Braced Frame Member Sizes Maximum consistency Lightest weight sections where possible All wide flange shapes W21x83 W14x211 W14x90

Third Avenue – The Aurora Michelle L. Mentzer – Structural Emphasis Structural Design Truss Connections Heavy bracing type connections at truss joints Base plate and anchor bolts connect bottom chord to columns or shear walls

Third Avenue – The Aurora Michelle L. Mentzer – Structural Emphasis Structural Design Tension Members W14x22, W14x34, W14x68  Largest members at top  Reduce size as allowable Hanger connection Tension splices where necessary

Third Avenue – The Aurora Michelle L. Mentzer – Structural Emphasis Structural Design Slabs No gravity load transferred from cladding to slabs  Cladding directly supported by columns  Angles welded to column flanges and bolted to panels Lateral ties from panels to slab  Transfer wind forces to rigid diaphragm

Third Avenue – The Aurora Michelle L. Mentzer – Structural Emphasis Structural Design Column Walk Added compression in column creates more tension in slab near column 18 on level 8  Initially gravity load is fully vertical  As core reinforcement in column slants, gravity force creates horizontal component at slab level  Horizontal tension at level 8 is resisted by post-tensioning One additional 1 3/8 “ Dywidag in level 8 slab  Original design calls for 5 Dywidags

Third Avenue – The Aurora Michelle L. Mentzer – Structural Emphasis Structural Design Column Capacities Column capacities checked at critical locations using PCA Column All support columns checked for gravity loads and moments from eccentricity  Dimensions and reinforcement increase in some areas Exterior columns not supporting truss also checked  Supporting extra loads directly from cladding  Sufficient as designed to carry cladding loads

Third Avenue – The Aurora Michelle L. Mentzer – Structural Emphasis Structural Design Tension in Columns Created by moment from cantilevered truss Resisted by reinforcement in concrete

Third Avenue – The Aurora Michelle L. Mentzer – Structural Emphasis Structural Design Shear in Columns Lateral loads from trusses and braced frames transferred directly to columns at roof level Rigid diaphragm redistributes load at floor thirty Where columns are in tension, shear reinforcement takes full shear load Several columns require additional shear reinforcement at roof level

Third Avenue – The Aurora Michelle L. Mentzer – Structural Emphasis Structural Design Adjusted Column Sizes

Third Avenue – The Aurora Michelle L. Mentzer – Structural Emphasis Structural Design Overturning Moments 0.9D+1.6W load case critical  Overturning caused by combination of wind and truss forces Building overturning resisted by self weight and foundation  Safety factor (critical case)=2.5 Moments cause tension and compression in opposite flanges of shear wall core  Spreadsheets used to check reinforcement for tension and compression in shear walls  Sufficient as designed to resist tension and compression loads

Third Avenue – The Aurora Michelle L. Mentzer – Structural Emphasis Architecture Precast architectural panels  Architectural Precast Association  Acid-etched medium with yellow pigment Red and beige tones blend with surroundings Hint of yellow sets it apart and ties in idea of light associated with the name “Aurora” Cladding

Third Avenue – The Aurora Michelle L. Mentzer – Structural Emphasis Architecture Truss Design Similar truss idea used in IBM Building, Baltimore, MD Shape of trusses emphasizes cantilevers Maximum symmetry possible Add interest and detract from tall slender penthouse Visible from street level

Third Avenue – The Aurora Michelle L. Mentzer – Structural Emphasis Architecture Column Dimensions Changes West window shifts No other substantial changes to layout necessary

Third Avenue – The Aurora Michelle L. Mentzer – Structural Emphasis Architecture BeforeAfter

Third Avenue – The Aurora Michelle L. Mentzer – Structural Emphasis Construction Management Sequencing Finish pouring concrete before erecting steel Enclosures cannot begin until after steel work is complete Crane only needed for one task at a time

Third Avenue – The Aurora Michelle L. Mentzer – Structural Emphasis Construction Management Tower crane capacity = 8 tons Maximum member weight = 5 tons Maximum panel weight = 7.5 tons Street parking behind crane Site Logistics

Third Avenue – The Aurora Michelle L. Mentzer – Structural Emphasis Construction Management Schedule Impact Durations from MC 2 Steel adds approx. 1.5 months to schedule Panels take about the same amount of time to hang Overall extension of schedule = 1.5 months

Third Avenue – The Aurora Michelle L. Mentzer – Structural Emphasis Construction Management Cost Initial overall cost  R.S. Means = $18.2 million Structural steel  MC 2 =$220,000 Panels (MC 2 )  Metal panels = $960,000  Architectural precast panels = $2,200,000 Proposal adds $1.5 million or 8.6% of initial cost

Third Avenue – The Aurora Michelle L. Mentzer – Structural Emphasis Conclusions Trusses add architectural interest and allow use of a heavier cladding system No substantial interruptions to interior layout $1.5 million cost increase 1.5 month schedule increase

Third Avenue – The Aurora Michelle L. Mentzer – Structural Emphasis Conclusions Recommendation Revenue from architectural enhancements will not likely offset added costs and schedule delays Use original metal panel cladding system

Acknowledgements DeSimone Consulting Engineers Penn State AE Faculty AE Class of 2003 My Family

Third Avenue – The Aurora Michelle L. Mentzer – Structural Emphasis Questions