VISUAL REALITY Massive Proposal Face Area Increase of 4,217 Sq.Ft. Industrial building increase by 12,480 square footage.

Slides:



Advertisements
Similar presentations
1 Broadcaster Relocation Fund Workshop Expanded Presentation June 25, 2012 Presented by: Jay Adrick, Vice President Broadcast Technology.
Advertisements

CONSTRUCTION BLUEPRINT READING
Alternative Sites Dan Wilkinson Electrical Engineer President - Cody Park HOA.
Volume of Rectangular Prisms
Thursday Update SN (Journal Check Next Week!)
Industrial Skills Area: Descriptions, Calculations & Industrial Applications.
 Write down objective and homework in agenda  Lay out homework (Graphing Picture)  Homework(Area Review)
Industrial Skills Area: Descriptions, Calculations & Industrial Applications.
11.3 Perimeter and Area of Similar Figures. Two rectangles are similar. One has width 4 in. and length 6 in. The other has width of 6 in. and length of.
Tower Regulation for Beginners Tim Ellam VE6SH Ham Radio University 2007 April 10, 2007.
Area: Parallelograms, Triangles, and Trapezoids Written By Mrs. Ballard Tweaked By KLS.
KMA 4113 Log Periodic Antenna for 49 Mhz to 1.3 Ghz
Web: Smokefree.ne.gov Phone: Indoor/Outdoor Areas Indoor area defined: “an area enclosed by a floor, a ceiling,
Objective Calculate the amount of materials needed for a construction project.
An easy to remember approximation … but more precisely, the apparent conductivity measured at the surface by the conductivity meter is a composite response.
Applications of Right Triangles
Capstone Team -Andre Nylund -Chris Grewell -Craig Lechtenberg -Fadel Al Jutail -Matt Melius -Mufeed Yacoub Team Advisor -Dr. Raul Bayoán Cal.
WHAT’S NEW ? AL HISLOP Electrical Engineer CARE July 1, 2003.
CPA A Text Amendment to Comprehensive Plan Policy to Increase the Floor Area Ratio from.35 to 1.0 in a portion of the SpringHills Activity.
2. Use Problem Solving Strategies & Models p Use Problem Solving Strategies & Models p. 24.
Lecture 8: INSTRUMENT LANDING SYSTEM (ILS)
Board Footage What is board footage How to Calculate it Example of calculating project costs with board footage.
Strategies from university resource centers. Reading strategies for difficult material.
The Crummer Bluff Mansions
5 ft 3ft 5ft 3ft Always write your answer with the unit of measurement.
Single Family Districts Working with staff, we ultimately settled on two districts.
Restricted Working Document – Interim Report Chamber Sign Task Force Fayetteville City Sign Review April 4,
MIC..... Architect ( Member ) Dr.Swe Swe Aye U Sun Oo U Khin Maung Maung Daw Htoo Htoo Ngwe Daw Hlaing Maw Oo.
Plan Cost Effective Construction and Drawings
4650 Alhambra Circle Building Site Separation. Request: The applicant is requesting consideration of a building site separation in accordance with Section.
Single Family Districts Working with staff, we ultimately settled on two districts.
How Does GPS Work ?. The Global Positioning System 24+ satellites 20,200 km altitude 55 degrees inclination 12 hour orbital period 5 ground control stations.
The Planning & Zoning Commission and Zoning Board of Adjustment Joint Workshop May 24, 2010 May 24, :00 P.M. 6:00 P.M.
Community Input Meeting #4 July 8 & 9, Agenda City Staff & Project Team Why we are here Project overview Summary of previous community meetings.
Place Value Identifying place value of a number is important.
Planning Electrical Circuits Original by Ryan Talton Modified by Georgia Agriculture Education Curriculum Office –June 2004.
Queen Anne Academic Center Prince George’s Community College 301 Largo Road Largo, Maryland By: Austin Heidelbaugh.
Chapter 11.3 Notes: Perimeter and Area of Similar Figures
Community Antenna TV System:
Planning Electrical Circuits
Jefferson County RZ Universal Storage at Columbine Car Care Center Official Development Plan Presenter: Alan Tiefenbach Good morning Commissioners.
Signing Plan Design - At Grade Intersections TEM Chapter 6-8
1.4 Introduction to Perimeter, and Area in the coordinate plane.
Blueprint Reading and Care
CFT Gateway Center ( E. Foothill Blvd
50 minutes, 5 questions, 5 pages, 50 marks total
Site Grading Site Grading Civil Engineering and Architecture
Santa Cruz avenue sidewalks Project
AS/RS (Automated Storage/Retrieval System)
Jefferson County RZ To amend the existing Planned Development (PD) zone district to allow for mini-warehouse storage. Case Name: Tri-Star Office.
Showroom 2- Frontage view
Setting up a PageMaker Document
Com3 2Q1617 Antenna Design Key design requirements
COLUMNS The foundation of design Sally Manke
Planning Electrical Circuits
Contour Lines Sbmitted By: Pramit Sharma R.B.S E.T.C Bichpuri Agra.
Chapter 6. Visual Aids for Denoting Obstacles
You may get your assigned calculator
Request for an After-the-Fact Major Variance from the Tar-Pamlico Riparian Area Protection Rules    Ernest Floyd Foster Foster Seafood 70 Captain Tom’s.
ABC PE 2  B. What are the cost objects?  
ARIZONA WATER COMPANY East Sedona Water Storage Facility
Air Rifle Range Layout Firing Line Range Officer Station
HERO UNIT Training Module
April 24, Study Group 1 A Regulatory Framework for Use of TV Channels by Part 15 Devices John Notor, Cadence Design Systems, Inc.
Leverett Fire Department – January 22, 2019
How do I actually complete one?
W6AYC Tower Project 50 foot crank-up
Section 8: SIGNS.
Brookhaven Planning Commission
WEST HALF OF LOT B CONCESSION 1 MARY C. JOYCE-SMITH, MCIP RPP
Presentation transcript:

VISUAL REALITY Massive Proposal Face Area Increase of 4,217 Sq.Ft. Industrial building increase by 12,480 square footage

2 Scenic Areas Should Be Protected “Because of its especially important visual qualities, development through the Central Mountains area should be designed to complement the landscape, not degrade it. Protection of visually sensitive areas is a priority because they are critical to the composition and unique character of the foothills landscape.” Central Mountains Community Plan at 17.

3 Scenic Areas Should Be Protected “Lookout Mountain and Mount Morrison are recognized as part of the Lariat Loop Mountain Gateway Colorado Heritage Area. As such these sites must be protected.” Letter from Colorado Legislators Ex. 2

4 TOWER FACE AREA INCREASE OF 4,217 Sq.Ft.! Face Area of tower & allowed antennas Proposed towers: 17,817 sq.ft –Main tower: 17,607 –Auxiliary tower: 210 Nonconforming towers removed: 13,600 sq.ft. LCG calculations submitted to Jeffco (5/14/03) used inconsistent calculation methods Tower width & antenna width of removed towers Tower width only of proposed towers

5 Massive New Tower

6 Width of Proposed Tower with Antennas Almost 30 feet –10 ft. wide tower “The width of any face of the Tower shall not exceed 10 ft measured horizontally between the centers of its outside vertical supports.” Structure Limitations 5 Transmission Tower a.iii 5/14/03 –10ft antennas on each side “Antennas mounted to the tower may not extend more than 10 ft. perpendicularly from the closest tower face.” 5a.iv 5/14/03 ODP Written Restrictions-Current Red Marked Print

7 730 feet high & 27.3 feet wide “Dashed area indicates allowable antenna locations for future reconfiguration if required-see written restrictions” “Concept Tower Section & Details” 5/14/03 Red marked Print page 3 of 4 Extra Heavy Guy Wires required-special fabrication

8 Permanent Increased Industrial Mass on Mountain Backdrop Tower Face Area: 4,217 sq. ft gain –Now 13,600 sq.ft –Proposed 17,817 sq.ft. Buildings: 12,480 gain –Now 8,520 sq.ft. –Proposed 21,000 sq. ft

9 The Proposed Buildings Are Larger Than Necessary for These Towers Proposal assumes a need of 2,500 sq. ft. for each of 8 transmitters Review of space requirements for local high-power UHF transmitters shows that 1,000 sq. ft. per station is sufficient –Channel 50 (2.5 MW) currently in a 900 square foot building. –Channel 15 (1 MW) DTV to be installed in 900 square feet now available on Mt. Morrison. –Channel 59 (5 MW) currently shares 2000 square feet with two other TV stations and numerous low power tenants Even if 2,500 sq. ft were needed, this would only be a temporary need