HallA/SBS – Front Tracker PARAMETERDESIGN VALUE Microstrip Silicon Detector Number of tiles/plane and size2 Number of planes2 Size of the single

Slides:



Advertisements
Similar presentations
H1 SILICON DETECTORS PRESENT STATUS By Wolfgang Lange, DESY Zeuthen.
Advertisements

Present Status of GEM Detector Development for Position Counter 1.Introduction 2.GEM 3.Readout Board 4.Fabrication Test 5.Large GEM 6.Readout Electronics.
GEM Detectors for AnDY Nilanga Liyanage University of Virginia 1 Outline GEM chamber concept Large area GEM chamber projects Proposed GEM configuration.
Muon Tracker Overview The PHENIX Muon Arms detect vector mesons decaying into muon pairs, allow the study of the Drell-Yan process, and provide muon detection.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
Nilanga Liyanage University of Virginia UVa GEM Team Dr. Kondo Gnanvo, Dr. Vladimir Nelyubin, Kiadtisak Saenboonruang, Chao Gu, Xinzhan Bai, Jie Liu, Seth.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
INFN GEM Front Tracker 2012 Oct 18 / SBS Coll. / JLabE. Cisbani1 V. Bellini, M. Capogni, E. Cisbani, S. Colilli, F. Giuliani, M. Gricia, F. Librizzi, M.
1 SBS Spectrometer / GEP5 Conf.. 2 Tracking Requirements Requirements Tracking Technology DriftMPGDSilicon High Rate: MHz/cm 2 (Front Tracker)
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
GEM Electronic System Status New releases of electronic boards: ◦ MPD v 4.0 ◦ Backplane 5 slot short (for UVa design) ◦ APV Front-End with Panasonic connector.
2012 IEEE Nuclear Science Symposium Anaheim, California S. Colafranceschi (CERN) and M. Hohlmann (Florida Institute of Technology) (for the CMS GEM Collaboration)
Sept. 24, Status of GEM DHCAL Jae Yu For GEM-TGEM/DHCAL Group Sept. 24, 2010 CALICE Collaboration Meeting Univ. Hassan II, Casablanca Introduction.
12/Dec/2012SBS-Meeting1 of 24 Status of the Front Tracker GEM and INFN Electronics 2013 – Feb – 20 SBS Weekly Meeting GEM Assembling SRS – INFN Electronics.
SPHENIX GEM Tracker R&D at BNL Craig Woody BNL sPHENIX Design Study Meeting September 7, 2011.
SBS Coll. Meeting - Front Tracker GEM
SuperB igbite Spectrometer in Hall A Background: photon ( MHz/cm 2 ) charged ( kHz/cm 2 ) 1 Large luminosity Moderate acceptance Forward.
25/05/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.
VC Feb 2010Slide 1 EMR Construction Status o General Design o Electronics o Cosmics test Jean-Sebastien Graulich, Geneva.
GEM chambers for SoLID Nilanga Liyanage University of Virginia
1 Tracking system based on GEM chambers Evaristo Cisbani Italian National Institute of Health and INFN Rome – Sanità Group PAVI – 09 / September.
Neutron Structure Functions and a Radial Time Projection Chamber The Structure of the Neutron The BoNuS Experiment at CLAS A New Proton Recoil Detector.
25/05/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.
SiD Concept – R&D Needs Andy White U. Texas at Arlington SiD Concept Meeting LCWS06 Bangalore, India March 11, 2006.
Installation and operation of the LHCb Silicon Tracker detector Daniel Esperante (Universidade de Santiago de Compostela) on behalf of the Silicon Tracker.
The Bigbite second GEM tracker. SBS GEM Trackers Front Tracker Geometry x6 18 modules In Italy  50 cm x 40 cm Modules are assembled to form larger chambers.
GEM chambers for SoLID Nilanga Liyanage University of Virginia.
GEM chambers for SoLID Nilanga Liyanage University of Virginia.
Super-Belle Vertexing Talk at Super B Factory Workshop Jan T. Tsuboyama (KEK) Super B factory Vertex group Please visit
Malte Hildebrandt, PSIMEG - Review Meeting / 1   e  Drift Chambers Charge Division Test Chamber Testsetup for Cosmics Chamber Construction.
Design and development of micro-strip stacked module prototypes for tracking at S-LHC Motivations Tracking detectors at future hadron colliders will operate.
Update on SBS Back Tracker UVa K. Gnanvo, N. Liyanage, V Nelyubin, K. Saenboonruang, Seth Saher, Nikolai Pillip (visiting from Univ. Tel Aviv, Israel)
GEM R&D Update Kondo Gnanvo. Outline  GEM R&D and assembly facilities at UVa  Cosmic test results  Update on the 40 × 50 cm 2 GEM prototype  Plans.
Performance of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger,
JLab 22/Jan/2010 SBS - Review E. Cisbani / SBS Trackers 1 Concepts and Status of the GEM trackers Evaristo Cisbani / INFN-Rome Sanità Group SBS - Review.
GEM Trackers for Super BigBite Spectrometer (SBS) in Hall JLab The Super Big Bite Spectrometer (SBS) is one of the major new equipment in hall A in.
M. Bianco On behalf of the ATLAS Collaboration
Studies of the possibility to use of a Gas Pixel Detector (GPD) as a fast track trigger device George Bashindzhagyan (Speaker,
Front GEM Chambers Design concepts –Foils –Mechanics Electronics and DAQ Performance Current activity and plan Evaristo Cisbani / INFN-Rome Sanità group.
Vina Punjabi Norfolk State University Hall A Collaboration Meeting June 10-11, 2010 GEp-V Experiment to Measure G Ep /G Mp.
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC January 17, 2003TOTEM plenary meeting -Marco Bozzo1 CSC detectors for T1.
Jefferson Laboratory Hall A SuperBigBite Spectrometer Data Acquisition System Alexandre Camsonne APS DNP 2013 October 24 th 2013 Hall A Jefferson Laboratory.
Calibration of the gain and measurement of the noise for the apv25 electronics K. Gnanvo, N. Liyanage, C.Gu, K. Saenboonruang From INFN Italy: E. Cisbani,
Test of the GEM Front Tracker for the SBS Spectrometer at Jefferson Lab F. Mammoliti, V. Bellini, M. Capogni, E. Cisbani, E. Jensen, P. Musico, F. Noto,
LHCb Vertex Detector and Beetle Chip
The DAMPE STK G. Ambrosi INFN Perugia. The DAMPE Detector Mass: 1480 Kg Power: 600 W Data: 16 Gbyte/day Liftime: 5 years 2.
09/10/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.
Abstract Beam Test of a Large-area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System V. Bhopatkar, M. Hohlmann, M. Phipps, J. Twigger,
The 12 GeV equipment Hall D – Hall D – GLUEx detector for photoproduction experiments Hall B – Large acceptance detector CLAS12 for high luminosity measurements.
Front Tracker: main technical solutions 40x50 cm 2 module Front Tracker Chamber: 40x150 cm 2  Use COMPASS approach: 3xGEM, 2D readout - one significant.
July 7, 2008SLAC Annual Program ReviewPage 1 Silicon Tracking / Silicon Readout R&D Richard Partridge SLAC / Brown.
Beam Test of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger, A.
CGEM-IT project and beam test program G. Felici for the FE-LNF-TO team Partially supported by the Italian Ministry of Foreign Affairs under the Program.
Review of Micromegas Tracking Detectors for CLAS12 – May 7, 2009 Reviewers: Madhu Dixit, Mac Mestayer Presentations covered the following topics: –detector.
TPC R3 B R3B – TPC Philippe Legou Krakow, February nd
Electronics for GEM R&D at the University of Virginia
Experimental Method: 2 independent detectors on both sides of IP
CLAS12 – RICH RICH - TECHNICAL PARAMETERS PARAMETER DESIGN VALUE
PANDA Muon Group Meeting, Protvino 7 June 2011 G
Application of VATAGP7 ASICs in the Silicon detectors for the central tracker (forward part) S. Khabarov, A. Makankin, N. Zamiatin, ,
Silicon Pixel Detector for the PHENIX experiment at the BNL RHIC
MAGIX Detectors Overview
Production and test of the LHCf microstrip silicon system
Status of the Front Tracker GEM
Design and Status of the SBS Front tracker
Concepts and Status of the GEM trackers
GEANT Simulations and Track Reconstruction
Physics program in Hall A for the CEBAF 12 GeV era
The CMS Tracking Readout and Front End Driver Testing
Experimental Method: 2 independent detectors on both sides of IP
Presentation transcript:

HallA/SBS – Front Tracker PARAMETERDESIGN VALUE Microstrip Silicon Detector Number of tiles/plane and size2 Number of planes2 Size of the single Number of microstrips / strip GEM Detector GEM modules/plane and size3 – 40x50 cm2 Number of planes6 Size of the single chamber40x150 cm2 Number of x/y strips and pitch mm Expected Performance Coverage of transverse area (3 m from target) 40x120 cm2 Hit spatial resolution< 100 um Sustained event acquisition rate20 kevents/s Detector - TECHNICAL PARAMETERS the corresponding particle momenta (with the help of the bending magnet), origin at target (assuming the beam direction). Together with the Polarimeter Trackers information, the reconstructed tracks will also provide the deflection angles of the protons in the Polarimeter and therefore permit the measurement of the scattered proton polarization. The FT in its full configuration includes 2 small planes of microstrip silicon detectors (uSiD) and 6 planes of Gaseous Electron Multiplier chambers (GEM). due righe su doves si trovano le uSiD (vicino al bersaglio) e come sono fatte The Front Tracker (FT) is the tracker of the primary charged particles in the SBS spectrometer. Its modular design permits flexible configuration and optimized use in different high luminosity experimental configurations and conditions. The FT shall permit the reconstruction of the trajectories of the primary charged particles (those coming from the target), through the 3D positions of the localized ionization (hits) produced in the active volume of its chambers. The reconstructed trajectories (or tracks) will be used to measure: Silicon Detector Image The GEM chambers sits at about 300 cm from the target; each chamber is made of independent GEM modules assembled as shown in figure and supported by a robust “service” frame. Electronics, cabling, gas pipes, and corresponding patch panels are fixed and supported by the service frame.

Contact: E. Cisbani GEM Detector lead +39 G. M. Urciuoli SiD Detector lead +39 C. Sutera GEM Detector Assembly M. Jones SBS Project Manager C. Keppel Hall A leader ) Detector Details indicazione in piu’ sui Each GEM module is made of 3 GEM foils (in single mask technique) separated by 2 mm. A drift foil is at 3 mm from the first GEM foil and a kapton readout foil is placed after the third GEM at 2 mm. The GEM and Drift foils are glued on thin Permaglas (also known as Durastone) frames (8 mm wide), while the readout foil is glued on a honeycomb plane which represents the main mechanical support of the module. Thee GEM foils are taken at the 2 mm distance by 5 tiny Permaglas “spacers” (0.3 mm wide). The readout foil has a double layer of x and y strips, with 0.4 mm pitch for a total of 1024 strips on x and 1280 strips on y. Two thin (12 um) mylar windows close the gas volume of the GEM module; one mylar window is glued before the drift, the other after the honeycomb plane, at 3 mm from it. Readout electronics The about 100 k strips are readout by radiation tolerant front-end cards based on the APV25 chip. The cards are grouped (4 or 5), connected and supported by passive boards (Backplanes or BCK). Up to 16 cards (4 backplanes) can be connected to one VME module (MPD) which manages the front-end cards, provides the ADCs to convert the APV25 multiplexed analog signals into digital information and performs a preliminary process of the converted data, such as pedestal subtraction, common noise removal and zero suppression (sparse readout). Each front end card hosts one APV25 and it is able to read 128 channels. The APV25 has essentially a preamp+shaper stage followed by 192 cells analog pipeline which permit 3.4 us trigger latency (40 MHz clock). Signals are sampled at 40 MHz. The front end cards and backplanes are radiation tolerant. The backplane is a PCB for signal routing, which can connect up to 5 cards. It hosts two radiation tolerant voltage regulators which provide the power to the cards. The backplane + front end cards are powered by a single voltage level of V. The electronics designed by INFN has been adopted for the readout of the GEM in the Olympus experiment and the SBS back-tracker. Construction Strategy and Project Leadership –Project is lead and funded by INFN. –The assembling of the GEM modules takes place in the clean room of INFN-Catania; testing and chamber integration is mainly performed in Rome. Design and preliminary testing of the electronics performed by INFN-Genova. –Bounding and assembling of the SiD is performed in the IFN Clean Room in Rome …. Project Status Main design of the FT completed by end of 2013 Procurement of most of the FT components completed by end of 2014 First FT GEM chamber will be delivered at JLab Spring/2015. Delivery of GEM chamber will continue till end of First SiD