Superconducting IR Magnets CHEN, Fusan May 11, 2007.

Slides:



Advertisements
Similar presentations
. TYPICAL SUPERCONDUCTING MAGNET TEST SEQUENCE. PREPARATORY TESTS AT ROOM TEMPERATURE Lyre Test: Simulate Effect of Thermal Contraction in Cold condition.
Advertisements

Mass Flow Controller. Function Delivers user specified flow rate of gas. Flow rate is mass flow rate (i.e. number of molecules per sec Mol/sec), not volume.
3.1 Ideal Diodes Forward bias (on) Reverse bias (off)
Spectrometer Solenoid Update Steve Virostek - LBNL MICE VC 150 August 23, 2012.
Power Supply System John Joseph LBNL Spectrometer Solenoid Test Plan Review Feb 17 th 2012.
Power System Fundamentals
Coupling Coil Test Facility Update Ruben Carcagno Fermilab September 20, 2012.
The 23 rd MICE Collaboration Meeting -1- ICST/HIT Jan.13 to 17, Harbin/China Large Prototype Coil Test and Plan Fengyu Xu Institute of Cryogenics.
1 Superconducting Magnets for the MICE Channel Michael A. Green Oxford University Physics Department Oxford OX1-3RH, UK.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM24 at RAL June 1, 2009.
California Friendly ® Landscape Training Irrigation System Troubleshooting The Metropolitan Water District of Southern California and the Family of Southern.
Overview of Phobos Magnet Designed by Harald Enge Built by Danfysik Technical summary: –“Double dipole” design –15.5 cm air gap –Max. 2 Tesla field –378.
Test plan for the MICE SS cryostat and magnet Tapio Niinikoski LBNL Spectrometer Solenoid Workshop May 10, 2011.
MElec-Ch1 - 1 Chapter 1 Properties of Electricity Properties of Electricity.
Electrical Electricity Fuses Relays Solenoids Electrical Testing
TE-MPE –TM, 16/05/2013, Mateusz Bednarek, TE/MPE-EE ELQA testing during and beyond LS1.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
7.1.3 Student Book © 2005 Propane Education & Research CouncilPage Applying a Systems Approach to Gas Appliance Troubleshooting Troubleshooting.
EE1008- ELECTRICAL AND ELECTRONICS MEASUREMENTS AND INSTRUMENTATION
LQS01 Test Preparation and Test Plan LARP Collaboration Meeting 12 LBNL - April 8-10, 2009.
HL-LHC/LARP, QXF Test Facility Workshop– R. Carcagno QXF Test Requirements Ruben Carcagno BNL Workshop December 17, 2013.
HD target.
MICE CC Test Status Ruben Carcagno 11/06/13 1. Cooldown Coil Temperature (calculated average in each of 8 coil segments) SC Transition (voltages across.
Spectrometer Solenoids MICO 214 Steve Virostek LBNL February 6, 2013.
LARP CM15 Magnet Testing Working Group SLAC, November 2 nd 2010.
PLC Based sequential batch process CONTROL system
HC Review, May 2005 Hardware Commissioning Review Hardware Commissioning Review Quality Assurance and Documentation of Results Félix Rodríguez Mateos,
Spectrometer Solenoids MICO 197 Steve Virostek LBNL August 15, 2012.
CM1 Thermal Cycle CM1 Warmup –1/4/12 (Wed.) to 1/6/12 (Fri.) (~50 hours) –Verified turbo interlock system works CM1 Cooldown –Began 1/9/12 (Monday) –At.
Zian Zhu Magnet parameters Coil/Cryostat/Support design Magnetic field analysis Cryogenics Iron yoke structure Mechanical Integration Superconducting Magnet.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
4th BEPCII IMAC Meeting April , 2006 Status of BEPCII Storage Rings Ma Li April 26, 2006.
5th BEPCII IMAC Meeting May , 2007 Progress of BEPCII Storage Ring Construction Ma Li May 10, 2007.
AT-MEL-PM, R. Denz, CERN, CH-1211 Geneva 23 1 QPS system and its risks  Principal risks  General remarks  Quench heater circuits  Quench detection.
MICE Power Supply System John Joseph LBNL Spectrometer Solenoid Controls & Monitoring Review Dec 11 th 2012.
MPP Meeting Sandor Feher Inner Triplet Powering Should include the IR quads and the DFBX especially the power leads. DFBX commissioning doc was.
AIDA Traci commissioning LHCb – CO 2 cooling meeting 18 March 2015 Kamil Wojdyla, Lukasz Banasik, Nicola Spadavecchia, Tomasz Kucharski, Piotr Dziurdzia,
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
[R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC] HWC Workshop ( ) Consolidation and major changes that have impact on the powering circuits.
Cryogenic Summary - K. C. Wu Testing D2L102 in MAGCOOLJune, 02 Difference between D2L102 and D2L101 Operating Summary Cooldown to 100 K and 6 K Test Condition.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
1 W.Ootani ICEPP, University of Tokyo MEG experiment review meeting Feb , PSI W.Ootani ICEPP, University of Tokyo MEG experiment review meeting.
Electrical Testers Basic test equipment used in today’s shops may include an analog type meter, a VAT (Volt-Amp-Tester), DMM (Digital Multimeter),
CHAPTER 17: ELECTRICITY ELECTRIC CHARGE AND FORCE CHAPTER 17: ELECTRICITY.
Ruben Carcagno, Sandor Feher, George Velev (team leader) MQXFS1 status meeting Summary of the MQXFS1 Investigation.
XVII SuperB Workshop and Kick Off Meeting - La Biodola (Isola d'Elba) Italy May 28 th June 2 nd 2011 P.Fabbricatore Sezione di Genova Reuse of Babar sc.
Fermilab’s TRAC Summer Experience Joshua Louis Naperville District 203.
2015 Operations Stay Treat CHL2 4K Cold Box Modifications SC1 2K Cold Box CC4 Failure Helium and LN2 Losses Contamination Operations Stay Treat.
Logo area HL LHC IT STRING M. Bajko CERN TE-TM and QXF Review.
LQS01a Test Results LARP Collaboration Meeting 14 Fermilab - April 26-28, 2010 Guram Chlachidze.
Superconducting Cryogen Free Splittable Quadrupole for Linear Accelerators Progress Report V. Kashikhin for the FNAL Superconducting Magnet Team (presented.
MICE CC TEST, IN PROGRESS M. Tartaglia For the FNAL/LBNL Test Team 9/27/13.
Electromechanical Relays Mechatronics ECE 5320 Assignment #1 Paul Smart.
MICE Spectrometer Solenoids Step IV running
S A Griffiths CM42 June 2015 Electrical & Control.
Electrical Configuration and System Protection
SIS 100 Vacuum chamber Recooler String system Components
Brooks Expert Support Tool (BEST) Software
D1 and D2 powering and protection
Powering the LHC Magnets
Introduction to W7-X Coil Testing at CEA – Saclay, France
Machine Protection Xu Hongliang.
Ohm’s law.
Cryogenics – The Basics
Cryogenics – The Basics
Cryogenics – The Basics
Fluid Power System Electrical Control
Presentation transcript:

Superconducting IR Magnets CHEN, Fusan May 11, 2007

2/18 Outline Progress of the superconducting magnets and relevant systems. –Power supplies and QPS were testified to be workable. –Electronic test was done to the system. –The magnets were cooled down to superconducting temperature. –The whole system was assembled together. The first commissioning of the magnets. –All coils were powered to 10~20% operating current. –Quench protection system was proved to be reliable. –Many problems were revealed with the valve boxes. Schedule of the second commissioning and field measurement. –The valve boxes are rebuilt and the whole system is reassembled. –The second commissioning is in process. –Magnetic field measurement will be started after commissioning.

3/18 Progress of the PS and QPS Power supplies met the requirements. –After months of tuning work, all power supplies were workable. Power supply control system fulfilled the required functions. Quench protection assembly reacted fast and correctly. –Reaction of the system was tested with dummy load. Quench detection system was assembled. –Both hardware and software were ready.

4/18 Progress of the SC magnets Electronic test before cooling. –The environment was not ideal. Temperature: 25~28ºC Humidity: 95%~100% –Problems of the valve box. The insulator failed in the hipot test at ~220VDC when the humidity was higher than 95%. The temperature sensors were electrically connected to the current leads. The hipot performance was concerned with the vacuum of the valve box.

5/18 Progress of the SC magnets Monitoring the magnets during cooling. –To monitor the transformation from normal to superconducting of the coils, we powered the coils with low current (40mA) and monitored the voltage drops across the coils.

6/18 Progress of the SC magnets Electronic test after cool-down. –Measured the resistance of gas cooled leads. –Hipot tests were repeated with all coils. The grounding resistances of all coils were far less than requirement (20Mohm).

7/18 The first commissioning More study on the hipot problem with BNL experts, George Ganetis and Wing Louie. –The grounding resistance of coils ranges from 2 to 8000 ohms. The resistance decreases when the valve box gets cold. –The resistance is non-linear and does not start to have current flowing until the voltage is greater then 1 Volt. –In all circuits the short is at or near the gas cooled lead. But the exact location of the short can not be found. Possible causes of hipot failure. –All the electrical insulators used in the current leads have a creep path that is too small. –The G-10 insulators used on the top of the valve boxes can collect water.

8/18 Result of grounding resistance test Valve Box CircuitAC Ground Resistance DC Ground Resistance Shorts Locations Current Tested Comments SCQ- A AS50335 AS1-IN, AS2- 3 AS1-OUT 300Pre-cooled Leads, Bus Quench High Ground Current SCQ SCQ-IN SCQ-OUT 250Pre-cooled Leads, Bus Quench SCB SCB-IN SCB-OUT 10Low Current Shut-off SKQ SKQ-OUT 6.6Low Current Shut-off VDC VDC-IN VDC-OUT 5.1Low Current Shut-off SCQ- B AS126NA AS1-IN, AS1- 2 AS1-OUT 250SC bus went resistive SCQ SCQ-IN SCQ-OUT 150SC bus went resistive SCB533625SCB-IN40High Current Shut-off SKQ537NA 40High Current Shut-off VDC710NA 40High Current Shut-off * This table quotes from George’s report

9/18 The first commissioning New problems of valve boxes –The current leads could not be cooled down. The cold ends reached 20K with the flux controllers at max. Reached 6K with the bypass valves at max. AS, SCQ and SCB coils could not be powered more than 20% operating current, otherwise quenched. –The sensors could not indicate the temperature of the most critical points. –The inlet and outlet leads could not be cooled equally because they used common controller

10/18 The first commissioning Some typical data and the diagnosis The signals monitored during the commissioning

11/18 Data of SCQ Inlet Vt 146A 162A 58A Outlet Vt Inlet Vs Outlet Vs The SC bus quenches, but the normal region does not expand The SC bus cannot recover after opening the bypass valve The SC bus recoveres after decreasing the current with the bypass valve opened Keeping the bypass valve open, start the second ramping cycle The SC bus does not quench at 162A Vt almost equals to Vc and Vs equals to zero for both inlet and outlet With the flow controller max, start the first ramping cycle

12/18 Data of AS 297A 9A 49A 98A 148A 197A 245A Inlet Vt Outlet Vt Inlet Vs Outlet Vs The Vt difference between the inlet and outlet shows the imbalance of the helium flow The inlet SC bus quench causes the jump of voltage signals while current increases to ~260A The normal region does not expand at 297A It is important to analyze why the outlet does not quench even the Vt higher

13/18 146A 165A 175A 185A 195A 205A The normal regions do not expand under 200A The normal regions expand rapidly after 200A and the quench protection system is triggered. Inlet Vt Outlet Vt Learn more from SCQ

14/18 The second commissioning The valve boxes are rebuilt and installed. The quench detection circuit is set up and tested. The warm temperature electronic test is performed. –The insulation of some temperature sensors on the current leads is not satisfying. The power supplies are improved. The ps control system is updated. The interlock between systems is linked. The cryogenic pipes are connected.  Now, the temperature reaches 60K.

15/18 The second commissioning Next steps: (schedule is tight.) –Restore the quench protection software. (1 day) –Power the coils to 10~20% current. (5~6 days) Tuning the parameters of quench detection system. Check the ps and ps control system. Check the quench protection assembly. Configure the parameters of leads flux controller. –Power the coils to 50% current. (2 days) –Power the coils to 110% current. (2 days) Tuning the power supplies. Quench training if necessary. –The same powering procedure for the sync-rad mode. (4 days)

16/18 Schedule of field measurement Joint field measurement. (37 days) –Instruments alignment, assembly, de-assembly, replacement (5 days). –Longitudinal field measurement with salamander. Solenoid magnet off (1 day) & on (3 days). –Excitation curve measurement with stretch-line. Solenoid magnet off (7 days) & on (7 days). –Rotating coil measurement (long & short coil). Solenoid magnet off (4 days) & on (10 days).

17/18 Schedule of field measurement Individual field measurement. (33 days) –Instruments alignment, assembly, de-assembly, replacement (5 days). –Excitation curve measurement with stretch-line (8 days for one magnet, totally 16 days). –Rotating coil measurement (12 days). Long coil and short coil are used at the same time with different magnet. –Longitudinal field measurement with salamander (2 days).

18/18 Additional topic The force and torque of SC magnet coils. The special type magnets in IR work well. –Septum bending magnet: ISPB. –Dual aperture quadrupole: Q1a, Q1b. –Narrow quadrupole: Q2, Q3. Fx [kN]Fy [kN]Fz [kN] Mx [kN · m]My [kN · m] AS10.5 HDC (Iop=50A) ± 3.9 z=770mm z=1170mm 1.48 VDC (Iop=24A) ± 3.9 z=1020mm z=1400mm 1.49