Network and Transfer Metrics WG Meeting Shawn McKee, Marian Babik perfSONAR Operations Sub-group 22 nd October 2014.

Slides:



Advertisements
Similar presentations
Operations Coordination Team Maria Girone, CERN IT-ES Kick-off meeting 24 th September 2012.
Advertisements

CSE101 Lab 3 Lecture Productive Team Work and Meeting CSE 101 Yinong Chen 1.
INFSO-RI Enabling Grids for E-sciencE Update on LCG/EGEE Security Policy and Procedures David Kelsey, CCLRC/RAL, UK
Integrating Network and Transfer Metrics to Optimize Transfer Efficiency and Experiment Workflows Shawn McKee, Marian Babik for the WLCG Network and Transfer.
Jan 2010 Current OSG Efforts and Status, Grid Deployment Board, Jan 12 th 2010 OSG has weekly Operations and Production Meetings including US ATLAS and.
PubMed Search Options (Basic Course: Module 6). Table of Contents  History  Advanced Search  Accessing full text articles from HINARI/PubMed  Failure.
News from the HEPiX IPv6 Working Group David Kelsey (STFC-RAL) HEPiX, Oxford 24 Mar 2015.
PerfSONAR in ATLAS/WLCG Shawn McKee, Marian Babik ATLAS Jamboree / Network Section 3 rd December 2014.
Hands-On Microsoft Windows Server 2008 Chapter 8 Managing Windows Server 2008 Network Services.
Electronic EDI e-EDI. The EDI has been in use since 1999 using a paper-based system and computerized spreadsheets to collect and manage EDI data. Over.
Agenda Network Infrastructures LCG Architecture Management
HEPiX IPv6 Working Group David Kelsey (STFC-RAL, UK) 4 May 2011 HEPiX, GSI, Darmstadt david.kelsey at stfc.ac.uk.
Experiment Support CERN IT Department CH-1211 Geneva 23 Switzerland t DBES WLCG operations: communication channels Andrea Sciabà WLCG operations.
Integration Program Update Rob Gardner US ATLAS Tier 3 Workshop OSG All LIGO.
HEPiX IPv6 Working Group David Kelsey (STFC-RAL) 1 July 2011 UK HEP Sysman meeting.
PubMed/History, Advanced Search and Review (module 4.3)
Network and Transfer WG Metrics Area Meeting Shawn McKee, Marian Babik Network and Transfer Metrics Kick-off Meeting 26 h November 2014.
News from the HEPiX IPv6 Working Group David Kelsey (STFC-RAL) WLCG GDB, CERN 8 July 2015.
News from the HEPiX IPv6 Working Group David Kelsey (STFC-RAL) GridPP35, Liverpool 11 Sep 2015.
The production deployment of IPv6 on WLCG David Kelsey (STFC-RAL) CHEP2015, OIST, Okinawa 16 Apr 2015.
GGUS summary ( 4 weeks ) VOUserTeamAlarmTotal ALICE ATLAS CMS LHCb Totals 1.
The HEPiX IPv6 Working Group David Kelsey (STFC-RAL) HEPiX, Ann Arbor MI 30 Oct 2013.
The HEPiX IPv6 Working Group David Kelsey EGI TF, Prague 18 Sep 2012.
Network and Transfer Metrics WG Meeting Shawn McKee, Marian Babik Network and Transfer Metrics WG Meeting 8 th April 2015.
Security Policy Update LCG GDB Prague, 4 Apr 2007 David Kelsey CCLRC/RAL
Edmodo Training A Guide to Getting Started. 2 Free social learning network for teachers, students, schools and districts Safe and easy way to connect.
NUOL Internet Application Services Midterm presentation 22 nd March, 2004.
Workflows II: Collect feedback for a file How to collect feedback Collecting feedback for a file can be challenging. However, if you save a file to a document.
Network and Transfer Metrics WG Meeting Shawn McKee, Marian Babik Network and Transfer Metrics WG Meeting 18 h March 2015.
LCG CCRC’08 Status WLCG Management Board November 27 th 2007
WLCG Network and Transfer Metrics WG After One Year Shawn McKee, Marian Babik GDB 4 th November
Handling ALARMs for Critical Services Maria Girone, IT-ES Maite Barroso IT-PES, Maria Dimou, IT-ES WLCG MB, 19 February 2013.
HEPiX IPv6 Working Group David Kelsey GDB, CERN 11 Jan 2012.
PanDA Status Report Kaushik De Univ. of Texas at Arlington ANSE Meeting, Nashville May 13, 2014.
CCRC’08 Monthly Update ~~~ WLCG Grid Deployment Board, 14 th May 2008 Are we having fun yet?
Network and Transfer WG perfSONAR operations Shawn McKee, Marian Babik Network and Transfer Metrics WG Meeting 28 h January 2015.
Update on Network and Transfer Metrics WG Shawn McKee, Marian Babik GDB 8 th October 2014.
WLCG Technical Evolution Group: Operations and Tools Maria Girone & Jeff Templon Kick-off meeting, 24 th October 2011.
The Challenge Posting Process Using the Loft Platform.
Data Transfer Service Challenge Infrastructure Ian Bird GDB 12 th January 2005.
The ATLAS Computing Model and USATLAS Tier-2/Tier-3 Meeting Shawn McKee University of Michigan Joint Techs, FNAL July 16 th, 2007.
DDM FAX Dashboard status and future Luca Magnoni IT/SDC 2 nd June 2014.
Report from GSSD Storage Workshop Flavia Donno CERN WLCG GDB 4 July 2007.
WLCG and IPv6 David Kelsey (STFC-RAL) LHCOPN/LHCONE, Rome 28 Apr 2014.
CMS: T1 Disk/Tape separation Nicolò Magini, CERN IT/SDC Oliver Gutsche, FNAL November 11 th 2013.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks LHCOPN Operational model: Roles and functions.
ATLAS Distributed Computing ATLAS session WLCG pre-CHEP Workshop New York May 19-20, 2012 Alexei Klimentov Stephane Jezequel Ikuo Ueda For ATLAS Distributed.
Monitoring the Readiness and Utilization of the Distributed CMS Computing Facilities XVIII International Conference on Computing in High Energy and Nuclear.
The HEPiX IPv6 Working Group David Kelsey HEPiX, Prague 26 April 2012.
HEPiX IPv6 Working Group David Kelsey david DOT kelsey AT stfc DOT ac DOT uk (STFC-RAL) HEPiX, Vancouver 26 Oct 2011.
News from the HEPiX IPv6 Working Group David Kelsey (STFC-RAL) HEPIX, BNL 13 Oct 2015.
The HEPiX IPv6 Working Group David Kelsey (STFC-RAL) EGI OMB 19 Dec 2013.
Copyright © 2010 Pearson Education, Inc. or its affiliate(s). All rights reserved.1 | Assessment & Information 1 Online Testing Administrator Training.
WLCG Information System Status Maria Alandes Pradillo, CERN CERN IT Department, Support for Distributed Computing Group GDB 9 th September 2015.
WLCG Operations Coordination report Maria Dimou Andrea Sciabà IT/SDC On behalf of the WLCG Operations Coordination team GDB 12 th November 2014.
Campana (CERN-IT/SDC), McKee (Michigan) 16 October 2013 Deployment of a WLCG network monitoring infrastructure based on the perfSONAR-PS technology.
15-Jun-04D.P.Kelsey, LCG-GDB-Security1 LCG/GDB Security Update (Report from the LCG Security Group) CERN 15 June 2004 David Kelsey CCLRC/RAL, UK
HEPiX IPv6 Working Group David Kelsey (STFC-RAL) GridPP33 Ambleside 22 Aug 2014.
Operations Coordination Team Maria Girone, CERN IT-ES GDB, 11 July 2012.
Security Policy Update WLCG GDB CERN, 11 June 2008 David Kelsey STFC/RAL
PerfSONAR operations meeting 3 rd October Agenda Propose changes to the current operations of perfSONAR Discuss current and future deployment model.
WLCG IPv6 deployment strategy
Shawn McKee, Marian Babik for the
perfSONAR-PS Deployment: Status/Plans
Update from the HEPiX IPv6 WG
David Kelsey CCLRC/RAL, UK
Alerting/Notifications (MadAlert)
WLCG and support for IPv6-only CPU
Batch Setup.
IPv6 update Duncan Rand Imperial College London
Presentation transcript:

Network and Transfer Metrics WG Meeting Shawn McKee, Marian Babik perfSONAR Operations Sub-group 22 nd October 2014

See Indico meeting page Review actions from last meeting and discuss progress so far Documentation and testing of the perfSONAR 3.4 WLCG/OSG instructions (install/update, firewall, mesh configuration) IPv6 dual-stack configuration Discuss integration of Tier-3 sites CHEP2015 submission AOB and next meeting 2 Agenda Network Monitoring and Metrics WG

Last report at GDB October 8 th – See 3 rd Oct: perfSONAR operations – Minutes at utes.html utes.html Main action items status: – JIRA project ( – Security mailing list (created) – New GGUS SU request in place…Nov 5 operational – New docs in draft form (later in presentation) – Infrastructure monitoring – reports, migration to 3.4 – Still need monitoring setup to use DN instead of PW – WLCG mesh configuration ‘migrated’ to OSG and v3.4 ( Network Monitoring and Metrics WG3 Recent Meetings Review

4 Draft Documentation for 3.4 Network Monitoring and Metrics WG We have created a set of documentation to guide the 3.4 upgrade/reinstall process – See entation/DeployperfSONAR entation/DeployperfSONAR We need feedback on the contents. – The troubleshooting and Experiment/API sections are not yet fleshed out Let’s have a tour of what is there now…

We will need at least two volunteers to test-out the instructions – Do they work? – Are they clear? – What is missing? – Anything need correcting? It is very important to make sure we provide the right set of instructions to sites Volunteers? Shawn if you decide you are willing to try out the instructions 5 Testing Volunteers Network Monitoring and Metrics WG

perfSONAR is viewed as an excellent way to begin exploring IPv6 by the experiments We are strongly recommending sites that support IPv6 configure their perfSONAR instances in “dual-stack” mode…adding IPv6 addresses – Each DNS name should have both an ‘A’ (IPv4) and ‘AAAA’ (IPv6) record – Reverse DNS should be configured for both – We have already configured all WLCG meshes to use ‘ipv4_only’ – Once we have a critical mass of IPv6 addresses in a mesh we can add another ipv6_only mesh – Note tests can specify IP type: age-reg-tests-add-ip-type age-reg-tests-add-ip-type 6 Dual Stack Information (IPv6) Network Monitoring and Metrics WG

We have begun getting requests from Tier-3 sites to join the various Tier-1/Tier-2 meshes – This won’t scale Tier-3 perfSONAR instances would benefit from a limited set of tests with sites that they normally interact with – A specific Tier-2 they work closely with – Other Tier-3s they work with – Their campus and regional network perfSONARs How should we support Tier-3’s? – Do we provide Tier-3 meshes? – Do we give them the tools to create their own meshes – Just use manually configured tests? – Other ideas? Network Monitoring and Metrics WG7 Supporting Tier-3 Instances

The CHEP 2015 abstract was approved by both CERN IT and SDC Title: Integrating network and transfer metrics to optimize transfer efficiency and experiment workflows Author(s): S. McKee, M. Babik, Members of the Network and Metrics WG (S. Campana, T. Wildish, J. Closier, C. Grigoras, I. Vukotic, M. Salichos, Kaushik De, V. Garonne, J.A.D. Cruz, A. Forti, C. Walker, D. Rand, A. de Salvo, E. Mazzoni, I. Gable, F. Chollet, H. Chen, U. Tigerstedt, G. Duckeck, A. Petzold, F. Lopez, J. Felix, J. Shade, M. O'Connor, V. Kotlyar, J. Zurawski) Abstract: The Worldwide LHC Computing Grid relies on the network as a critical part of its infrastructure and therefore needs to guarantee effective network usage and prompt detection and resolution of any network issues, including connection failures, congestion, traffic routing, etc. The WLCG Network and Transfer Metrics project aims to integrate and combine all network-related monitoring data collected by the WLCG infrastructure. This includes FTS monitoring information, monitoring data from the XRootD federation, as well as results of the perfSONAR tests. The main challenge consists of further integrating and analyzing this information so that it can be turned into actionable insight for optimization of data transfers and workload management systems of the LHC experiments. The presentation will include technical description of the WLCG network monitoring infrastructure as well as results of the analysis of the collected data. It will also highlight how results of this analysis can be used in order to improve efficiency of the WLCG computing activities. Comments or suggestions? Plan is to submit later this week. Network Monitoring and Metrics WG8 CHEP 2015 Abstract

With 3.4 we migrated the mesh URLs to OSG OSG Operations (Soichi) has developed a mesh- configuration GUI – Current OSG URLs redirect to CERN/AFS ones – We will need to reproduce the existing meshes in OSG. Each Cloud/VO responsible will need to do this. – We can cut-over transparently when ready Future mesh URL will look like this: – – Example: sum01.aglt2.org sum01.aglt2.org – This will allow automatically finding each instances meshes Network Monitoring and Metrics WG9 Mesh Configuration Items

AOB including additional discussion and questions? We need to schedule our next meeting. It should be at least a week after we send out the 3.4 upgrade/install instructions. – We will circulate a Doodle poll link shortly via – Remember to review draft docs and provide feedback Twiki – Metrics Metrics Contact – Network Monitoring and Metrics WG10 AOB and Next Meeting