Self triggered readout of GEM in CBM J. Saini VECC, Kolkata.

Slides:



Advertisements
Similar presentations
Status of test beam data analysis … with emphasis on resistive coating studies Progress and questions 1Meeting at CEA Saclay, 25 Jan 2010Jörg Wotschack,
Advertisements

Sci-Fi tracker for IT replacement 1 Lausanne 9. December 2010.
The MAD chip: 4 channel preamplifier + discriminator.
E. Atkin, E. Malankin, V. Shumikhin NRNU MEPhI, Moscow 1.
Specific requirements for analog electronics of a high counting rate TRD Vasile Catanescu NIHAM - Bucharest CBM 10th Collaboration Meeting Sept 25 – 28,
Bulk Micromegas Our Micromegas detectors are fabricated using the Bulk technology The fabrication consists in the lamination of a steel woven mesh and.
Front-end electronics for Time Projection Chamber I.Konorov Outlook:  TPC requirements  TPC readout options  Options for TPC FE chips  Prototype TPC.
Multichannel readout system of inner tracker for NICA-MPD Rogov Victor AFI, JINR, Dubna Afi.jinr.ru.
N-XYTER Hybrid Developments Christian J. Schmidt et al., GSI Darmstadt JINR, Dubna, Oct. 15 th 2008.
Using the EUDET pixel telescope for resolution studies on silicon strip sensors with fine pitch Thomas Bergauer for the SiLC R&D collaboration 21. May.
Large Area, High Speed Photo-detectors Readout Jean-Francois Genat + On behalf and with the help of Herve Grabas +, Samuel Meehan +, Eric Oberla +, Fukun.
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
Requirements to RICH FEE Serguei Sadovsky IHEP, Protvino CBM meeting GSI, 10 March 2005.
The PEPPo e - & e + polarization measurements E. Fanchini On behalf of the PEPPo collaboration POSIPOL 2012 Zeuthen 4-6 September E. Fanchini -Posipol.
Performance test of STS demonstrators Anton Lymanets 15 th CBM collaboration meeting, April 12 th, 2010.
Chamber R&D for CBM Muon Tracker Anand Kumar Dubey VECC, Kolkata.
Preliminary LumiCAL FEE Specification Presented by Alexander Solin NC PHEP FCAL collaboration meeting, February 12-13, 2006, Krakow (INP PAS),
J.M. Heuser — CBM Silicon Tracker 1 Johann M. Heuser, GSI Darmstadt CBM Collaboration Meeting JINR Dubna, 15 October 2008 CBMCBM Review of the first in-beam.
GEM detector development at VECC Anand Dubey. 2-GEM detector tested with source symmetric mode of biasing scheme, (i.e. same voltage across both the GEMS)
Detector R&D for Muon Chamber Anand K. Dubey For VECC group.
Fully depleted MAPS: Pegasus and MIMOSA 33 Maciej Kachel, Wojciech Duliński PICSEL group, IPHC Strasbourg 1 For low energy X-ray applications.
Progress on STS CSA chip development E. Atkin Department of Electronics, MEPhI A.Voronin SINP, MSU.
Development of the Readout ASIC for Muon Chambers E. Atkin, I. Bulbalkov, A. Voronin, V. Ivanov, P. Ivanov, E. Malankin, D. Normanov, V. Samsonov, V. Shumikhin,
March 9, 2005 HBD CDR Review 1 HBD Electronics Preamp/cable driver on the detector. –Specification –Schematics –Test result Rest of the electronics chain.
Results from first beam tests for the development of a RICH detector for CBM J. Eschke 1*, C. Höhne 1 for the CBM collaboration 1 GSI, Darmstadt, Germany.
Calibration of the gain and measurement of the noise for the apv25 electronics K. Gnanvo, N. Liyanage, C.Gu, K. Saenboonruang From INFN Italy: E. Cisbani,
1 SiPM studies: Highlighting current equipment and immediate plans Lee BLM Quasar working group.
Status of the n-XYTER testing Knut Solvag, Gerd Modzel, Christian Schmidt, Markus Höhl, Andrea Brogna, Ullrich Trunk, Hans-Kristian Soltveit CBM.
LC Power Distribution & Pulsing Workshop, May 2011 Super-ALTRO Demonstrator Test Results LC Power Distribution & Pulsing Workshop, May nd November.
Readout Architecture for MuCh Introduction of MuCh Layout of Much ( proposed several schemes) Read ASIC’s Key features Basic Readout chain ROC Block Diagram.
NA62 straw readout Characterization and qualification of the frontend electronics Detector and interface to frontend Small readout system Plans Expected.
1 CDC Readout - upgrade for Higher Luminosity - Y.Sakai (KEK) 29-Oct-2002 TRG/DAQ Review of Status/Plan (based on materials from S.Uno/M.Tanaka)
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
Investigation of crosstalk in the readout structure of the Beamcal K.Afanaciev.
1 19 th January 2009 M. Mager - L. Musa Charge Readout Chip Development & System Level Considerations.
RD51 GEM Telescope: results from June 2010 test beam and work in progress Matteo Alfonsi on behalf of CERN GDD group and Siena/PISA INFN group.
CBM-TOF-FEE Jochen Frühauf, GSI Picosecond-TDC-Meeting.
1 9 December 2002A.P.Kashchuk (LNF/INFN), Frascati) New approach to CPC design.
CERN PH MIC group P. Jarron 07 November 06 GIGATRACKER Meeting Gigatracker Front end based on ultra fast NINO circuit P. Jarron, G. Anelli, F. Anghinolfi,
CBM 12 th Meeting, October 14-18, 2008, Dubna Present status of the first version of NIHAM TRD-FEE analogic CHIP Vasile Catanescu and Mihai Petrovici NIHAM.
25 juin 2010DPallin sLHC_Tile meeting1 Tilecal VFE developments at Clermont-Ferrand June 2010 Status G Bohner, J Lecoq, X Soumpholphakdy F Vazeille, D.
1 Micromegas for sampling calorimetry Chronology & people  Initiated by LAPP LC-group in 2006 (C. Adloff, M. Chefdeville, Y. Karyotakis, I. Koletsou)
ADC values Number of hits Silicon detectors1196  6.2 × 6.2 cm  4.2 × 6.2 cm  2.2 × 6.2 cm 2 52 sectors/modules896 ladders~100 r/o channels1.835.
Overview of TPC Front-end electronics I.Konorov Outline:  TPC prototype development  Readout scheme of the final TPC detector and further developments.
QA Tests Tests for each sensor Tests for each strip Tests for structures Process stability tests Irradiation tests Bonding & Module assembly Si detectors1272.
29/05/09A. Salamon – TDAQ WG - CERN1 LKr calorimeter L0 trigger V. Bonaiuto, L. Cesaroni, A. Fucci, A. Salamon, G. Salina, F. Sargeni.
Understanding of SKIROC performance T. Frisson (LAL) On behalf of the SiW ECAL team Special thanks to the electronic and DAQ experts: Stéphane Callier,
The design of fast analog channels for the readout of strip detectors in the inner layers of the SuperB SVT 1 INFN Sezione di Pavia I Pavia, Italy.
Budker INP V.Aulchenko1,2, L.Shekhtman1,2, V.Zhulanov1,2
PreShower Characterisations
DCH FEE STATUS Level 1 Triggered Data Flow FEE Implementation &
Jinfan Chang Experimental Physics Center , IHEP Feb 18 , 2011
A General Purpose Charge Readout Chip for TPC Applications
Calorimeter Mu2e Development electronics Front-end Review
Results achieved so far to improve the RPC rate capability
Saikat Biswas, A. Abuhoza, U. Frankenfeld, C. Garabatos,
Application of VATAGP7 ASICs in the Silicon detectors for the central tracker (forward part) S. Khabarov, A. Makankin, N. Zamiatin, ,
Overview of the project
DCH FEE 28 chs DCH prototype FEE &
A Low Power Readout ASIC for Time Projection Chambers in 65nm CMOS
VELO readout On detector electronics Off detector electronics to DAQ
LHCb calorimeter main features
Status of n-XYTER read-out chain at GSI
BESIII EMC electronics
Status of the CARIOCA project
Pre-installation Tests of the LHCb Muon Chambers
AMICSA, June 2018 Leuven, Belgium
CBM-MUCH-RPC Electronics
Status of MUCH Electronics
Presentation transcript:

Self triggered readout of GEM in CBM J. Saini VECC, Kolkata

CBM-MUCH Environment Interaction rates of the primary particle is 10MHz First station with the present detector PCB layout, occupancy per channel is as high as 2% (i.e. hit rate 200KHz/channel) in innermost region. To acquire the data with such a high rate, triggered electronics is no more useful. The electronics should be fast enough to avoid pileup due to high rate. Radiation hardness is another big criterion to be considered, but is not discussed now.

Occupancy plot prepared with the help of Partha Pratim Bhaduri For MUCH Station-1

Occupancy plot prepared with the help of Partha Pratim Bhaduri Total BW of a Sector : 8.5 Gbps Station-1 : 16 Sectors Total BW for Stn-1 : 16 x 8.5 X 3= 408 Gbps Actual BW required ~ 1.5 x 408 ~ 612 Gbps FEB number wise bandwidth requirements

Proposed readout architecture for GEM detector based first two MUCH stations

Present nXYTER based readout chain used for prototype GEM chamber tests ROC FEB PCB(Chamber)

Electronics used for the prototype testing of GEM based MUCH detector Architecture of nXYTER More insight of nXYTER ASIC

Self Triggered Electronics integration with GEM detector Self-triggered electronics is more prone to noise, hence a much more careful grounding scheme was developed. Introduction of ground plane on detector readout PCB HV grounding isolation with the detector ground to make the detector ground less noisy

Earlier design with no ground plane with two layer design Later design with adapted ground plane with four layer design This ground plane was introduced for some different purpose but it worked very good for noise performance

Low intensity incident beam results with self triggered nXYTER ASIC and GEM detector

Fe55 source test results with collimator in front

Run# 111 HV=2700, DeltaV= 300.8V Run#112 HV=2800, DeltaV=311V Run#114 (HV=3000V, DeltaV=334V) Run#116 (HV= 3100V, 345) Dead pad 12 CERN Beamtest Nov-2012 (Low intensity runs)

High intensity study of nXYTER with GEM detector

Problem faced in the test beam In CERN test beam Nov-2012, we got good efficiency with the detector and nXYTER electronics but hits are centered for low intensity run and hits are not centered for high intensity runs. Looking carefully, we saw that hits which are at the edges of the detector looks like the effect of cross talk but at the same time we didn’t saw hit in the center cell where principle hits are taking place. ADC with the low intensity run shows saturated pulses but with the high intensity run we saw drop in ADC.

CERN Beamtest Nov-2012 (High intensity runs) 30KHZ 150KHZ

Tests done in VECC to diagnose this problem We made a step pulse as shown in next slide using an arbitrary pulse generator, to simulate detector pulse. Step is chosen to avoid discharge of the pulse and we can analyze consecutive detector pulse effect on the electronics. Next slides shows the setup information used for debugging the problem.

Full test setup for the test is shown below FEE baord ROC board Attenuator Scope to test Analog channel Arbitrary waveform generator DAQ to configure FEE board and ROC and acquire data to analyze Power supply for FEE and ROC 17

What is Vbfb used in next slides..?? Vbfb

Frequency=500Khz Vbfb=25, Charge input = 15fc/step Screen shot from Scope for the nXYTER test channel DAQ output 19

Frequency=500Khz Vbfb=90, Charge input = 15fc/step Screen shot from Scope for the Nxyter test channel DAQ output 20

Fe55 source test at VECC without collimator to see the saturation effect with respect to Vbfb Fig.1 DAQ 2D plot with Fe55 at Vbfb=6 Fig.2 DAQ 2D plot with Fe55 Vbfb=6 Fig.3 DAQ 2D plot with Fe55 at Vbfb=55 Fig.4 DAQ 2D plot with Fe55 Vbfb=55 21

Reproduction of high frequency effect seen at CERN SPS tests. 2D plot in linear scale logarithmic scale with Mini X-ray frequency (350KHz), VECC chamber at low Vbfb=30 Vbfb=150 22

Study of crosstalk effect with Vbfb parameter done at GSI detector lab 23

Small illustrative section of GSI GEM chamber PCB FEE# 1 FEE# 2 24

HV3100V, X-ray setting 15KV/5mA, frequency of 5KHz(avg) and Vbfb 50, with GSI GEM chamber. We can see the center cell is receiving all the hits while crosstalk cell rarely getting any hits. 2D plot of the data Crosstalk cell ADC plot of the data Center cell ADC plot of the data 25

HV3100V, X-ray setting 15KV/200mA, frequency of 350KHz(avg) and Vbfb 50, with GSI GEM chamber. We can see the center cell is not receiving any hit while crosstalk cell is getting more and more hits. 2D plot of the data Crosstalk cell ADC plot of the data Center cell ADC plot of the data 26

HV3100V, X-ray settings 15KV/200mA, frequency of 350KHz(avg) and Vbfb 150, with GSI GEM chamber. We can see the center cell is receiving all the hits after changing Vbfb, while crosstalk cell rarely getting any hits 2D plot of the data Crosstalk cell ADC plot of the data Center cell ADC plot of the data 27

HV3300V, X-ray settings 15KV/5mA, frequency of 5KHz(avg) and Vbfb 50, with GSI GEM chamber. As compare to slide 14, we can see now the center cell as well as crosstalk cell are receiving the due to higher gain of chamber. 2D plot of the data Crosstalk cell ADC plot of the data Center cell ADC plot of the data 28

HV3300V, X-ray settings 15KV/100mA, frequency of 100KHz(avg) and Vbfb 50, with GSI GEM chamber. We can see the center cell is rarely receiving hits, while crosstalk cell rarely maximum hits 2D plot of the data Crosstalk cell ADC plot of the data Center cell ADC plot of the data 29

HV3300V, X-ray settings 15KV/100mA, frequency of 100KHz(avg) and Vbfb 150, with GSI GEM chamber. We can see the center cell receiving all the hits, but crosstalk cell is still receiving hits with lower ADC value peak as compare Vbfb setting of 50. 2D plot of the data Crosstalk cell ADC plot of the data Center cell ADC plot of the data 30

At low frequency At high frequency 31 ∆t1∆t2 Here ∆t1 > ∆t2

We further see the minimal Vbfb setting change with increase in charge input. Figure below shows the minimum Vbfb required with the varying frequency and with two different setting of charge input 32

New ASIC development for CBM- MUCH GEM based detector STS group of CBM with collaboration with AGH Krakow is designing a new chip. This ASIC will have the similar front end architecture like nXYTER. This is built with the in build 32 channel ADC. This new ASIC is readout with the CBM-net backend designed by the collaboration. To meet the requirement of the GEM based MUCH detector, this ASIC will be made with dual gain having mode 1x and 4x with 1x equals to 8.4mV/fc.

Basic architecture of the new development

parametervalue number of channels test channels depending on the test results of new STSXYTER input pad pitch 116 um staggered in two rows input signal polarity negative accepted input leakage current 10 nA input capacitance (detector + cable) 30 pF 30 pF input capacitance 1000e gain8.4mv/fC Dynamic range fC ADC channel 1.5fC input clock frequency 250 MHz timing resolution ~10 ns power dissipation per channel: < 10 mW operating temperature range Delta(T)< 40 degree C technologyUMC 180 nm Maximum hit rate/ channel2 MHz Shaping time constant40ns Spark protectionyes (HBM) ADC32 channel Parameters OF MUCH ASIC 35

Present status 1 st version of STS-XYTER is already on table and tested with existing DAQ and preliminary tests were done with this ASIC. 2 nd version of STS-XYTER with dual gain version to be used as a MUCH-XYTER is under design and submission is expected in Jan-2015

Thanks