EuCARD is co-funded by the European Commission within the Framework Programme 7 under Grant Agreement no 227579. Reach of NC and SC Technologies, 50 …

Slides:



Advertisements
Similar presentations
COOLING TUBE ACCELERATING STRUCTURE MANIFOLD COUPLER VACUUM INTERFACE FLANGE RF INTERFACE FLANGE TUNING STUD ENGINEERING DESIGN AND FABRICATION OF X-BAND.
Advertisements

IWLC2010Walter Wuensch19 October 2010 Progress on CLIC rf structures.
Breakdown Rate Dependence on Gradient and Pulse Heating in Single Cell Cavities and TD18 Faya Wang, Chris Nantista and Chris Adolphsen May 1, 2010.
CERN-KEK X-band collaboration 3 Dec T. Higo on behalf of X-band group of KEK.
The Continuing Role of SRF for AARD: Issues, Challenges and Benefits SRF performance has been rising every decade SRF installations for HEP (and other.
Report from KEK High gradient study results from Nextef (+ other related activities) LCWS2011, Granada Sep. 27, 2011 T. Higo.
18/6/2007 M.Taborelli, TS-MME Structure fabrication techniques and possibilities M.Taborelli Disk structures Quadrant structures ….most of it inspired.
CARE07, 29 Oct Alexej Grudiev, New CLIC parameters. The new CLIC parameters Alexej Grudiev.
ABSTRACT A damped detuned structure (DDS) for the main linacs of CLIC is being studied as an alternative design to the present baseline heavily damped.
Working Group 1: Microwave Acceleration Summary 10 July 2009.
ABSTRACT The main accelerating structures for the CLIC are designed to operate at 100 MV/m accelerating gradient. The accelerating frequency has been optimised.
Design of Standing-Wave Accelerator Structure
R&D For Accelerating Structures H. Padamsee. TESLA Niobium, one meter length, rf = 1.3 GHz Copper, 53 cm, rf = 11.4 GHz.
ABSTRACT The main accelerating structures for the CLIC are designed to operate at 100 MV/m accelerating gradient. The accelerating frequency has been optimised.
Thin Films for Superconducting Cavities HZB. Outline Introduction to Superconducting Cavities The Quadrupole Resonator Commissioning Outlook 2.
W. Wuensch, rf development meeting Considerations on running normal conducting cavities cold.
CLIC Drive Beam Linac Rolf Wegner. Outline Introduction: CLIC Drive Beam Concept Drive Beam Modules (modulator, klystron, accelerating structure) Optimisation.
HIGH RF POWER TESTING FOR THE CLIC PETS International Workshop on Linear Colliders 20 th October 2010 Alessandro Cappelletti for the CLIC team with.
5 th CLIC X-band collaboration meetingWalter Wuensch16 May 2011 CLIC rf structure program.
Status of X-band program at RadiaBeam
Accelerating structure test results and what’s next Walter Wuensch CTF3 collaboration meeting
Rong-Li Geng Jefferson Lab High Efficiency High Gradient Cavities - Toward Cutting Down ILC Dynamic Heat Load by Factor of Four R.L. Geng, ALCW2015,
Accelerator R&D status in cooperation with CERN and KEK 1.BSM, BHM (T. Mitsuhashi) 2. Crab Cavity (Y. Morita) 3. X-band Acc. Structure (T. Higo) 10 th.
International Workshop on Linear Colliders 2010 Design and fabrication update on PSI/Trieste X-band phase- space rotator structure Dmitry Gudkov 21-OCT-2010.
Study of MgB 2 Thin Films on Nb by Pulse Laser Deposition S.Mitsunobu, S.Inagaki, H.Nakanishi, M.Wake and M.Fukutomi* KEK,NIMR*
Acceleration gradient limitations in room temperature and superconducting acceleration structures Nikolay Solyak Fermilab.
Statistical analysis of RF conditioning and breakdowns Jorge GINER NAVARRO CLIC Workshop /01/2015 J. Giner Navarro - CLIC WS20151.
An Overview of the CLIC Testing Program W. Wuensch CLIC ACE
EuCARD Task 10.4 Sergio Calatroni. Sub-task New and improved techniques for the production of Nb sputtered Quarter Wave (QW) cavities (CERN, INFN-LNL)
Overview of the CLIC RF Structure Development Program W. Wuensch Second Collaboration Meeting on X-band Structures KEK,
Structure of the task 12.2 Claire Antoine Eucard2 WP12 DESY
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
Overview of CLIC main linac accelerating structure design 21/10/2010 A.Grudiev (CERN)
CLIC Workshop – CERN, October / 17 DC breakdown experiments for CLIC CERN, TS-MME Antoine Descoeudres, Trond Ramsvik, Sergio Calatroni, Mauro Taborelli.
High Q R&D at JLab G. Ciovati, P. Dhakal, R. Geng, P. Kneisel, G. Myneni TTC Topical Meeting on CW SRF Cornell Univ., June 12 th -14 th, 2013.
RF breakdown in multilayer coatings: a possibility to break the Nb monopoly Alex Gurevich National High Magnetic Field Laboratory, Florida State University.
Recent High-gradient test result at KEK Linear Collider Workshop 2012 Arlington, Texas (WebEx) 25 October, 2012 Toshi Higo and X-band group of KEK.
Rongli Geng March 4, th LCC ILC Cavity Group Meeting
常伝導技術での LC の可能性 LC feasibility consideration with normal conducting technology 第5回「機構の研究推進について」の意見交 換会 (ILC の推進について ) 平成 24 年 2 月 13 日 加速器・肥後寿泰.
Summary of progress towards CLIC goals and next steps for structure testing 6 th X-band collaboration workshop, April 18 th- 20 th 2012 Steffen Döbert,
KEK workshopWalter Wuensch18 April 2012 Status and objectives of the CLIC X-band and high- gradient activity.
The CLIC accelerating structure development program Walter Wuensch CARE05 23 November 2005.
CLIC Accelerating Structure R&D Introduction W. Wuensch X-band workshop
5/7/2007 TS_CLIC_AB M.Taborelli, TS-MME High precision machining and metrology for structures: achievements and open questions M.Taborelli.
10/2007 M.Taborelli, TS-MME M.Taborelli Structure fabrication: dimensional tolerances Contributions of : G.Arnau-Izquierdo, A.Cherif, D.Glaude, R.Leuxe,
Progress of X-Band Accelerating Structures LINAC10, Tsukuba 17 Sep T. Higo (KEK)
Update on S0 Work in the Americas Region Mark Champion 17 June 2008.
Walter WuenschIARC CERN High-gradient accelerating structures for proton acceleration Linear collider development applied to cancer therapy.
TD18 High Power Test Results Faya Wang Chris Adolphsen May 3, 2010.
W. Wuensch CLIC project meeting High-power rf structure testing.
CLIC09 WG4 RF Structure1 Engineering Perspectives on Quadrants (2) CLIC09 Workshop KEK Y.Higashi.
Status of high gradient experiments at Nextef Kazue Yokoyama, Toshiyasu Higo, Yasuo Higashi, Shuji Matsumoto, Shigeki Fukuda Accelerator Laboratory, KEK.
Nextef results & status International Workshop on Breakdown Science and High Gradient Technology KEK, Japan 18 April 2012 Toshi Higo.
High-gradient rf constraints W. Wuensch X-band workshop
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement High Efficiency Work.
ALCPG2011, 3/19- 23, SRF Group Institute of Heavy Ion Physics, Peking University ALCPG /3/19-23, Eugene, Oregon, USA RF superconducting Cavity.
RF programme Review for the ESGARD Roadmap to EUCARD2 Peter McIntosh (STFC) Stephane Chel (CEA) Wolf-Dietrich Moeller (DESY)
Accelerating structure prototypes for 2011 (proposal) A.Grudiev 6/07/11.
High Power Crab Cavity Testing Ben Woolley HG2016 Argonne National Lab. 8 th June 2016.
Test Accelerating Structures Designs, Objectives and Critical Issues
Status of the CLIC main beam injectors
Activities of Cavity Fabrication Facility at KEK
High Q via N infusion R&D at Jefferson Lab
Review of rf structure test results
Testing Infrastructure, Program and Milestones
Tolerances: Origins, Requirements, Status and Feasibility
Recent high-gradient testing results from the CLIC XBoxes
Measurements, ideas, curiosities
Test RF gun cavity Takuya Natsui.
Presentation transcript:

EuCARD is co-funded by the European Commission within the Framework Programme 7 under Grant Agreement no Reach of NC and SC Technologies, 50 … 100 … 200 MV/m? Erk JENSEN, CERN June 2013 EuCARD’13

Disclaimer I was asked to give this presentation… …because I’m not an expert! … so don’t expect too much, I’ll try and stay basic. The work is from others, the conclusions are mine EuCARD'13, CERN, 10-Jun-2013Reach of NC and SC Technologies? 2

KEK Press Release Oct EuCARD'13, CERN, 10-Jun-2013Reach of NC and SC Technologies?

SC: The present world record? 4 EuCARD'13, CERN, 10-Jun-2013Reach of NC and SC Technologies?

ILC 9-cell cavity 5 EuCARD'13, CERN, 10-Jun-2013Reach of NC and SC Technologies? ILC Newsline, Nov-2012 ILC RDR: 31.5 MV/m

ILC reliable cavity production EuCARD'13, CERN, 10-Jun-2013Reach of NC and SC Technologies? 6

SC: Advances in technology 7 EuCARD'13, CERN, 10-Jun-2013Reach of NC and SC Technologies? Preparing for EP (inserting cathode) Clean room assembly (JLAB) Photos: Rongli Geng C. Antoine: CAS SC 2013

Other superconductors? EuCARD'13, CERN, 10-Jun-2013Reach of NC and SC Technologies? 8 Material Pb Nb NbN NbTiN Nb 3 Sn MgB YBCO Gurevich, 2007, C. Antoine: CAS SC 2013

Multilayers (Gurevich, 2006) EuCARD'13, CERN, 10-Jun-2013Reach of NC and SC Technologies? 9 cavity Nb I-S-I-S- outside C. Antoine: CAS SC 2013 How to delay vortex penetration? Image from Gurevich’s SRF2007 presentation

Multilayers – 1 st RF tests, 3.9 GHz 10 EuCARD'13, CERN, 10-Jun-2013Reach of NC and SC Technologies? Accelerator cavities' operating range 3.88 GHz => R BCS ~ 9 x R (1.3 GHz) C. Antoine: CAS SC 2013

Conclusion SC EuCARD'13, CERN, 10-Jun-2013Reach of NC and SC Technologies? 11

NC structures “classical” limit 12 EuCARD'13, CERN, 10-Jun-2013Reach of NC and SC Technologies? f in GHz, Ec in MV/m Normal conducting, on Cu These limits are now known to be wrong – better models exist

NC – state of the art, EuCARD'13, CERN, 10-Jun-2013Reach of NC and SC Technologies?

… but: too many sparks … but: too many sparks 14 EuCARD'13, CERN, 10-Jun-2013Reach of NC and SC Technologies? half pulse length double pulse length nominal pulse length … this is quite a hard limit:

… quite a hard limit! 15 EuCARD'13, CERN, 10-Jun-2013Reach of NC and SC Technologies? half pulse length double pulse length nominal pulse length The rapid increase of the breakdown rate indicates some drastic changes near the surface!

CLIC accelerating structures  Target 100 MV/m accelerating gradient  This target is reached – at the correct BDR and with correct pulse length! EuCARD'13, CERN, 10-Jun-2013Reach of NC and SC Technologies? 16 W. Wuensch: 7 th LC School, 2012

Achieved accelerating gradients 17 EuCARD'13, CERN, 10-Jun-2013Reach of NC and SC Technologies? W. Wuensch: 7 th LC School, 2012

What limits the acc. gradient? EuCARD'13, CERN, 10-Jun-2013Reach of NC and SC Technologies? 18 W. Wuensch: 7 th LC School, 2012

This allows optimization EuCARD'13, CERN, 10-Jun-2013Reach of NC and SC Technologies? 19 W. Wuensch: 7 th LC School, 2012

Overall CLIC optimization 20 EuCARD'13, CERN, 10-Jun-2013Reach of NC and SC Technologies? High-power RF optimum aperture: /λ = 0.1…0.12 Why X-band ? Crossing gives optimum frequency FoM =L bx /N · η BD RF From beam dynamics: optimum aperture = 2.6 mm A. Grudiev, Structure Optimization

Materials/heat treatments 21 EuCARD'13, CERN, 10-Jun-2013Reach of NC and SC Technologies? TD18#3 at SLAC TD18#2 at KEK Disk stacking

Evolution of high precision machining 22 EuCARD'13, CERN, 10-Jun-2013Reach of NC and SC Technologies? Up to the 1980’s1980’s ’s2000’s ’s Larger machines Multiple axis ( X/Y/Z and C) Future ? Intelligent machines ? Robotisation ? Pallet machining? Robotisation ? First machines at research institutes and universities Start of industrialization Optical recording contact lenses Single point diamond turning Up to the 1990’s1990’s ’s2010’sFuture ? Ultra precision diamond milling (lagging more than a decade behind on turning) Limited to fly cutting mirror optics Laser scanner mirrors First proto type machines Micro fluidics Accelerator parts Milling as add-on on lathes Lens arrays Intra ocular lenses

High precision machining, surface finish 23 EuCARD'13, CERN, 10-Jun-2013Reach of NC and SC Technologies? Metrology mark

CLIC Power needs 24 EuCARD'13, CERN, 10-Jun-2013Reach of NC and SC Technologies? CLIC Nominal, loaded CLIC Nominal, unloaded

Beam Loading – allows efficiency! 25 EuCARD'13, CERN, 10-Jun-2013Reach of NC and SC Technologies? full beam loading – optimum efficiencychoice for CLIC main beam eta acceleration

Conclusion NC  Tremendous progress has been made in material science, fabrication and joining techniques with NC accelerating structures.  CLIC – the state of the art!  The goal of 100 MV/m loaded gradient, with correct pulse length and BDR, has been demonstrated  In individual cells, 150 MV/m are regularly reached.  The breakdown rate is a very steep function of the field – an indication that something drastic happens near the metal surface when operating close to the limit  The latter needs deeper study to find mitigation eventually! EuCARD'13, CERN, 10-Jun-2013Reach of NC and SC Technologies? 26

Conclusion EuCARD'13, CERN, 10-Jun-2013Reach of NC and SC Technologies? 27