MEA Machine and Experiment Assembly 1 Norbert Meyners, MEA Engineering Forum at CERN 12.Okt. 2006 Thoughts about LDC Hall and Assembly (Work is not finished.

Slides:



Advertisements
Similar presentations
19th – 20th of September 2007Cryogenic Expert Meeting at GSI, Jan Patrick Meier1/11 Cryogenic Experts Meeting at GSI, 2007 The SIS 100 Cryogenic Jumper.
Advertisements

Replies by N.Meyners (in green) 27 August 2007ILC Questions M. Breidenbach1 ILC Detector Strategy Questions Some of us have been wondering about the fundamental.
Assembly Hall in Hybrid-A’ and ILD 2014/9/6 Yasuhiro Sugimoto 1.
Global Design Effort Goals and Introduction Andrei Seryi, SLAC, September 17, 2007.
1 IR Hall for GLD Oct Y. Sugimoto KEK. 2 Underground hall HybridPure CMS IR hall area (WxL)25x55 Beam height8.6 Crane max hook height20.5 Largest.
Global Design Effort Detector concept # Plenary introductory talk IRENG07 Name September 17, 2007.
Preliminary studies for Muon shield modification to accommodate LCLS II Alev Ibrahimov December, 2010 BSY.
DH in Hybrid-A and ILD 2014/9/5 Yasuhiro Sugimoto 1.
Experimental hall in Japanese mountain site Y. Sugimoto ILD MDI/Integration 1.
Construction and Installation of the CLIC Experimental Area
Status of ILC Barry Barish Caltech / GDE 17-Aug-07.
1 FD Support and Pacman for GLDc 27 Aug Yasuhiro Sugimoto KEK.
1 GLD Surface Assembly Y. Sugimoto KEK
TGC Big wheel Sector assembly plan Tatsuo Kawamoto ATLAS workshop 2005.
Pixel Support Tube Requirements and Interfaces M.Olcese PST CDR: CERN Oct. 17th 2001.
1 Alternative assembly option of ILD Y.Sugimoto 2010/10/18 ILD Integration
Experimental hall in Japanese mountain site Y. Sugimoto 1.
October 13, 2006 Global Design Effort 1 International Linear Collider Machine Detector Interface Materials for discussion at Engineering Forum: experiences.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
WP2 Superbeam Work Breakdown Structure Version 2 Chris Densham (after Marco Zito version 1 )
Thanks to Andrei for slides October 26, 一般報告 Hitoshi Yamamoto, Oct 26, 2006.
September 18, 2007H. J. Krebs1 SiD Collaboration One Piece End Door Design Concept plus Forward Equipment Interfaces H. James Krebs SLAC September 18,
Si D in 14mrad/14mrad/z=0 ILC T. Markiewicz/SLAC SiD Advisory Group 14 August 2006.
1 GLD and GLDc Sep. 12, 2007 Y. Sugimoto KEK. 2 Compact GLD Option Motivation –GLD and LDC will write a common LoI –The detector design should have common.
10/2010 IWLC2010 Global Design Effort 1 Brief Overview of Interaction Region Conventional Facilities in RDR Times Presenter Tom Lackowski.
Civil Engineering and Services - drawings for CDR - CDR chapter J.Osborne and M.Gastal for CES WG 1.
The ILC IR John Amann ILC Mechanical Engineering 09/12/06.
A. Hervé - 17 Oct CLIC-Workshop CLIC Workshop: 17 Oct. 07 Interaction Region Engineering at ILC Push-Pull Option A. Hervé/CERN.
A. Hervé - 17 Sept ILC-IRENG IRENG07 Workshop: 17 Sept. 07 Various Possibilities for disposition of Experimental Area A. Hervé/CERN.
MEA Machine and Experiment Assembly Norbert Meyners, MEA 17. Sept. 2007ILC IRENG07; SLAC1 LDC Engineering Design (Status)
GLD experimental hall and detector assembly Y.Sugimoto KEK 27 Sep
March 22, –  Design Concept & Hall Layout  Access Tunnel  Top heading Tunnel  Displacement of detector hall by push-pull operation.
Philip Burrows MDI Panel Meeting 15/08/06 Philip Burrows John Adams Institute Oxford University SiD and IR/MDI Issues.
ILD and SiD in Japanese site (from discussions in SiD/ILD E/D Interface Working Meeting) Yasuhiro Sugimoto, Marco Oriunno 2011/12/15 SiD
Experimental hall in Japanese mountain site 2011/11/30 Yasuhiro CFS Webex meeting 1.
KEK, 04/28/061 Safety Plan Assumptions Break out of fire in the Beam Tunnel is negligible Cables in the Service Tunnel is main fire load They are combustible.
Layout and conventional facility N.Terunuma KEK. Conventional facility 1 Layout of beam line should be fixed until end of June We have to start.
SECONDARY BEAM HANDLING AND INFRASTRUCTURE DESIGN STATUS BRUNO FERAL (CERN/EN) DIAMANTO SMARGIANAKI (CERN/EN) Project Leader: I.Efthymiopoulos (Cern/EN)
MEA Machine and Experiment Assembly Norbert Meyners, MEA 12. July 2007ILC IRENG07 WG-A1 LDC Engineering Design (Status) Introduction General Design Detector.
1 Building Design Progress Dan Wilcox March 2012.
Philip Burrows SiD Monthly Phone Meeting, 4/10/071 IR Issues from IRENG07 Philip Burrows John Adams Institute Oxford University.
Rad. Shield 2 Feb. 06D.LACARRERE1 IP8 POINT 8 – RADIATION SHIELD – UX85 Introduction  History (in brief)  Conceptual Design  Why installation shifted.
Octobre LAL Orsay Report from the IRENG07 workshop at SLAC W. Lohmann, DESY from Septembre 17 – 21, ~ 100 participants - plenary and parallel sessions.
What’s new at LAL-LLR ( MDI issues) M.Jore, C.Clerc Visit at CMS Forward detectors meeting at LLR Vacuum in Beam pipe, first LAL results.
1 Update of detector hall in mountain regions Y.Sugimoto in Granada.
Experimental Hall in Mountain Regions
CLIC Handling Engineering Update
Updated Design of Detector Hall
Detector Utility/Service Cavern
Yasuhiro Sugimoto 2012/2/1 ILD integration meeting
Experimental hall design in Japanese site
Interaction Region Alternative Layouts
INSTALLATION SEQUENCE
FCC Civil Engineering update
Arc magnet designs Attilio Milanese 13 Oct. 2016
Hybrid Access Optional Study
HPS Motherboard Electronic Design
Detector hall in mountain regions
Pierre-Alexandre Thonet
CLIC Civil Engineering Update
Dump Transport from Dump Hall to XSE (updated Version)
Yingshun Zhu Accelerator Center, Magnet Group
ILD-0 overall dimensions C.Clerc ILD meeting, Seoul 17/02/09
Detector hall in mountain regions
Extract from today’s talk given to DCB
RDR Baseline Layouts for Interaction Region
Final Design CGEM Workshop HIEP, 14/03/2017 M. Melchiorri - INFN FE.
8-10 April 2014 CFS-ADI Joint Meeting
Neutron guide Shielding Concept
ISO view of pipe w/ individual EC detector installed
Presentation transcript:

MEA Machine and Experiment Assembly 1 Norbert Meyners, MEA Engineering Forum at CERN 12.Okt Thoughts about LDC Hall and Assembly (Work is not finished yet. Sorry for confusing pictures) General LDC/TESLA detector assumption Moveable Shielding Questions: Hall Width Underground Hall Size Beam Position  Question: Separating Shielding Wall  Question: Shielding Block Material Garage Position  Question: Electronic Location  Question: Shaft Position Question: Orientation Surface to Underground Hall Surface Assembly

MEA Machine and Experiment Assembly 2 Norbert Meyners, MEA Engineering Forum at CERN 12.Okt General 2000t parts are not easy to handle! CMS needs 1day to close one yoke ring! (Goal: ½ day) Do not forget: Escape routes Scaffolds, Lifts (scissor or cherry pickers) Cables and other supply lines (to the detector and at the walls) Supports I assumed 3m space arround the open detector!

MEA Machine and Experiment Assembly 3 Norbert Meyners, MEA Engineering Forum at CERN 12.Okt LDC/TESLA detector assumptions Reasonable fast access to the inner detector Access to the vertex detector without breaking the machine vaccum Picture from “Mechanical Concept of the TESLA Detector” (LC-DET )

MEA Machine and Experiment Assembly 4 Norbert Meyners, MEA Engineering Forum at CERN 12.Okt LDC fully open (Beam Pipe Exchange)

MEA Machine and Experiment Assembly 5 Norbert Meyners, MEA Engineering Forum at CERN 12.Okt Q: Hall Width ? Not rectangular shape! 25m seemed to be okay!

MEA Machine and Experiment Assembly 6 Norbert Meyners, MEA Engineering Forum at CERN 12.Okt Detector in Beam Position Q: Shielding Wall ? Shielding Wall 3,5m separating the detector hall Gap at the top Why is it necessary? Do we have access to the hall with the beam on or not? Do we have two categories of worker: * radition worker * non radiation worker? (Only 2m for the machine, but could be changes!)

MEA Machine and Experiment Assembly 7 Norbert Meyners, MEA Engineering Forum at CERN 12.Okt Moveable Shielding Shielding Portals are impossible with the thicknesses (≥3m) demanded at the moment.  C-shape movable shielding (or C-I-shape) and move transverse At TESLA at thickness of the shielding of 2m was required. The gap between the detector and the fixed shielding was closed with a huge portal.

MEA Machine and Experiment Assembly 8 Norbert Meyners, MEA Engineering Forum at CERN 12.Okt Detector in Beam Position Q: Shielding Wall ? No Shielding Wall But 5.5m Shielding (Mistake: 3+3.5=6.5)  Shielding Material (?) Heavy Concrete (3.7t/m³) insteed of Normal (2.35t/m³) saves 20% thickness at HERA (~90º to the beam) 6.5m*0.8=5.2m (Only 2m for the machine, but could be changes!)

MEA Machine and Experiment Assembly 9 Norbert Meyners, MEA Engineering Forum at CERN 12.Okt Detector in Beam Position Shielding modifed (Similar picture) 4m for Machine C- and I-Shape Overlaps at the Gaps  E-Trailer smaller

MEA Machine and Experiment Assembly 10 Norbert Meyners, MEA Engineering Forum at CERN 12.Okt Detector in Garage Position (It was a surprise for me!) Q: E-Trailer ? It is in way! Alternativies: Split it Electronic Cavern At the yoke Q: Allowed cable length? (Detector to Electronic) Q: Necessary space for electronic? Q: Cable route for the inner detectors? (Along the support tube?)

MEA Machine and Experiment Assembly 11 Norbert Meyners, MEA Engineering Forum at CERN 12.Okt Detector in Garage Position Q: Shaft Position ? NO!

MEA Machine and Experiment Assembly 12 Norbert Meyners, MEA Engineering Forum at CERN 12.Okt Detector in Garage Position Q: Shaft Position ? Move it around!

MEA Machine and Experiment Assembly 13 Norbert Meyners, MEA Engineering Forum at CERN 12.Okt Detector in Garage Position Q: Shaft Position ? Best position with E-Trailer! (?)

MEA Machine and Experiment Assembly 14 Norbert Meyners, MEA Engineering Forum at CERN 12.Okt Detector in Garage Position Q: Shaft Position ? Nearly best position without trailer! (?)  5-10m more length

MEA Machine and Experiment Assembly 15 Norbert Meyners, MEA Engineering Forum at CERN 12.Okt Detector in Garage Position Q: Shaft Position ? Best shaft position without trailer! (?) Only trailer problem left Q: But how the stair case and the elevator in the shaft?  Turn rectangle and all detector rings (?) Q: Second shaft? Safety

MEA Machine and Experiment Assembly 16 Norbert Meyners, MEA Engineering Forum at CERN 12.Okt Surface Assembly It would be possible! (Attention: HERE Surface Hall 90º to Underground Hall) (In case of a shallow hall I would stick to the TESLA concept)

MEA Machine and Experiment Assembly 17 Norbert Meyners, MEA Engineering Forum at CERN 12.Okt Summary Garage Position incorporated Underground Hall size: 55m x 25m; Shaft at the endOKAY Surface Assembly CMS style OKAY GLD style (I have not fully understood)Possible Open Questions: Where Electronic and Auxiliary Caverns? (Size?) Radiation Shielding Separation Wall: No (or Yes?) Tickness? Surface Hall Orientation? ………..

MEA Machine and Experiment Assembly 18 Norbert Meyners, MEA Engineering Forum at CERN 12.Okt Detector in Beam Position Shielding modifed 4m for Machine Overlaps at the Gaps  E-Trailer smaller