September Interface Kickoff Sunflower Project Statewide Management and Reporting Tool Update September 02, 2009.

Slides:



Advertisements
Similar presentations
Performing Test Best Practices By Gabriel Rodriguez.
Advertisements

Automated Software Testing: Test Execution and Review Amritha Muralidharan (axm16u)
Software Quality Assurance Plan
Kansas SMART (Statewide Management, Accounting, and Reporting Tool) Workflow for General Ledger.
November 17, 2009 Sunflower Project Monthly Conversion Meeting – November.
Test Long and Prosper presented by Janet Gray July 26, 2005.
Sponsored by the U.S. Department of Defense © 2002 by Carnegie Mellon University July 2002 Pittsburgh, PA Lecture 6: Team Planning.
Summer IAVA1 NATIONAL INFORMATION ASSURANCE TRAINING STANDARD FOR SYSTEM ADMINISTRATORS (SA) Minimum.
Clarity Educational Community Clarity Educational Community Integration Interface Strategies and Methods.
Testing - an Overview September 10, What is it, Why do it? Testing is a set of activities aimed at validating that an attribute or capability.
Software Testing Prasad G.
July Interface Monthly Meeting Sunflower Project Statewide Management and Reporting Tool Update July 14, 2009.
Project Execution & Termination Life Cycle Execution Presented by: Basker George.
CALPADS UAT EOY Kick-off Meeting
Washington Health Benefit Exchange C ARRIER T ESTING O VERVIEW & 834 DRAFT C OMPANION G UIDE R EVIEW February 27, :00-3:00 PM.
Student UID & PowerSchool Enrollment. House Keeping Use the Chat feature to ask questions –Preface questions with the subject Webinar recording will be.
Data Exchange Standards in support of transaction processes 08 November 2004 Bonn, Germany Peggy Quarles Perrin Quarles Associates, Inc.
MyFloridaMarketPlace Roundtable August 20, 2003 MyFloridaMarketPlace.
International Business and Technology Consultants AMS confidential & proprietary SPS Help Desk Presentation Army User’s Conference June 2002.
PHASE 4 SYSTEMS IMPLEMENTATION Application Development SYSTEMS ANALYSIS & DESIGN.
ABSTRACT Zirous Inc. is a growing company and they need a new way to track who their employees working on various different projects. To solve the issue.
State of Kansas INF50 Excel Voucher Upload Statewide Management, Accounting and Reporting Tool The following Desk Aid instructs users on overall functionality.
PROJECT COST REDISTRIBUTION Project Manager and PCR Coordinators training material.
RUP Implementation and Testing
Software Inspection A basic tool for defect removal A basic tool for defect removal Urgent need for QA and removal can be supported by inspection Urgent.
1 EIR Accessibility Web Scanning Program Jeff Kline, Statewide Accessibility Coordinator Texas Department of Information Resources October, 2012.
State of Kansas INF50 Excel Voucher Upload Statewide Management, Accounting and Reporting Tool The following Desk Aid instructs users on overall functionality.
1 Budget Journals Presented by Lisa Becker. 2 What are Budget Journals?  Budget Journals are entered into SMART to record an agency’s budget into a particular.
1.  Describe an overall framework for project integration management ◦ RelatIion to the other project management knowledge areas and the project life.
Essential 3 - SSID Enrollment Course Introduction v1.0, September 3, 2013 SSID ENROLLMENT Course Introduction Essential 3.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Greta Robertson Kathy Hoffman /11/2011 SCEIS Finance Automated Interfaces.
Incident Management PCCYFS June 27, 2007 Incident Management for the Office of Children, Youth and Families.
Sunflower Project Data Conversion Workshop May 5, 2009.
Enhancements to FasTrak PR Project Update Retail Market Subcommittee November 8, 2006 Adam Martinez Mgr, Market Operations DPO.
December 17, 2009 Sunflower Project Monthly Conversion Meeting – December.
ENCOMPASS Voucher Build Process
U.S. General Services Administration FTS2001 Transition Baseline Inventory Tool Adam Lesser GSA Networx Transition Team (Booz Allen Hamilton) October 25,
© Mahindra Satyam 2009 Configuration Management QMS Training.
Sunflower Project Interfaces March 25, Copyright © 2009 Accenture All Rights Reserved. Welcome.
PearsonAccess April 14, PearsonAccess – Agenda Order Tracking Additional Orders Student Data Upload (SDU) files New Student Wizard Online Testing.
October 21, 2009 Sunflower Project Monthly Conversion Meeting – October.
Essential 3 - SSID Enrollment Course Introduction v3.0, August 7, 2012 SSID ENROLLMENT Course Introduction Essential 3.
November Interface Monthly Meeting Sunflower Project Statewide Management and Reporting Tool Update November 10, 2009.
Small Agency Meeting June 24, 2008 Sunflower Project Statewide Financial Management System.
December Interface Monthly Meeting Sunflower Project Statewide Management, Accounting, and Reporting Tool Update December 10, 2009.
Project Management Methodology
July 22, 2009 Sunflower Project Monthly Conversion Meeting – July.
March 24, 2010 Sunflower Project Monthly Conversion Meeting – March.
1 Agency Implementation Guide Walkthrough Session Maintaining Interface / COA Profiles & Reports September 28, 2009.
June 14, 2010 Sunflower Project Monthly Conversion Meeting – June.
August 26, 2009 Sunflower Project Monthly Conversion Meeting – August.
MyFloridaMarketPlace MyFloridaMarketPlace User Meeting May 3, 2007.
September Interface Monthly Meeting Sunflower Project Statewide Management and Reporting Tool Update September 8, 2009.
February Interface Monthly Meeting Sunflower Project Statewide Management, Accounting, and Reporting Tool Update February 10, 2010.
State of Connecticut Accounts Payable Ongoing Voucher Interface.
Sunflower Project Asset Management Conversion Workshop June 18, 2009.
Mahindra Satyam Confidential Quality Management System Software Defect Prevention.
Interactions & Automations
January Interface Monthly Meeting Sunflower Project Statewide Management, Accounting, and Reporting Tool Update January 12, 2010.
EDS 1 Early Delivery Systems EDS 1 Update for Workshop Jonathan Pulcini - Project Manager August 17, 2007.
State of Connecticut Billing Interface PeopleSoft 8.9.
TMP3413 Software Engineering Lab Lab 01: TSPi Tool Support.
MyFloridaMarketPlace CRB Meeting MFMP 2.0 Upgrade Status February 01, 2007.
Financial System Upgrade Agency Change Champion Deployment Session March 16 th, 2006.
Architecture Review 10/11/2004
Description of Revision
IT and Development support services
Welcome Traceability Software Integrators
{Project Name} Organizational Chart, Roles and Responsibilities
Presentation transcript:

September Interface Kickoff Sunflower Project Statewide Management and Reporting Tool Update September 02, 2009

2 Overview of Interface Test Overview: The objective of Interface Test is to verify that correct data is passed between Agency systems and SMART All new Agency SMART interfaces and spreadsheet uploads will be tested Interfaces are logically grouped into stages for testing Data conversion activities are excluded from Interface Test The DISC mainframe will be used as a conduit between Agency systems and SMART A primary contact on the Interface Team will be identified for each interface

3 Project Update Interface Facts: The file naming standard is: XX.TOSMRT.AP02.XXXX.DYYMMDD.THHMMSS.in XX.FMSMRT.AP02.DYYMMDD.THHMMSS.out DA.GBSMRT.GL15.DYYMMDD.THHMMSS.out Date/Time will be used in the file naming standard as the file numbering solution Transmittal sheets will not be required except for interfaces requiring manual effort

4 Roles and Responsibilities Development Team are Responsible for: Completing interface builds on schedule for interface testing Researching and resolving assigned defects Coordinating with DISC to establish mainframe file numbering and archiving procedures Maintaining defect status and resolution in Phire Working with assigned tester to troubleshoot defects Unit testing defect fixes Coordinating with the Database Administrator to migrate defect fixes to interface environment once they have been resolved

5 Roles and Responsibilities Finance Team are Responsible for: Completing Functional Designs Providing support for interface team members Providing support for development team members Providing configuration values, creating configuration insert scripts, and manually configuring the Interface Test environment as needed Assisting with the resolution of functional issues Processing change request forms Determining the necessity of a change request Providing support for the spreadsheet uploads

6 Roles and Responsibilities The Interface Team is Responsible for: Developing test scripts and conditions Executing test scripts in SMART Validating the expected results of an interface test Providing outbound error files to the DISC mainframe Logging System Investigation Requests (SIRs) for errors SIR Tracking Coordinating the schedule of SMART processes Providing agencies with configuration values required for testing Validating that Entry and Exit Criteria are met

7 Interface Test Strategy SIR Tracking: The interface team will log and track SIRs in Phire SIRs will be assigned to the Development, Tech Arc, Security, and Finance teams The team leads will be responsible for assigning team members to resolve the defects Team leads can reassign SIRs to the appropriate team as needed The technical team will work with the finance team to resolve functional issues Request for code migrations must be logged in Phire Approval must be given by the development leads for code migrations Approval to close the SIR must be given by the interface team SIRs will be reviewed in the weekly interface test status meeting

8 Interface Test Strategy Agency Error Notification: SMART will provide system generated error files to the Agencies via the DISC Mainframe Error files will contain the invalid data and a description of the error Error files will have the same file name as the inbound file, including the date/time stamp, except the file extension will be.err Error files will not be produced for outbound SMART interfaces Message logs containing statistical information will also be provided to Agencies via the DISC Mainframe Message logs will have the same file name as the inbound file, including the date/time stamp, except the file extension will be.log Agencies will actively check the DISC Mainframe for error files

9 Interface Test Strategy Interface Test Filenames: All test files will have a “T” before the file direction Inbound files will have the following format: XX.TTOSMRT.AP02.XXXX.DYYMMDD.HHMMSS.in Outbound files will have the following format: XX.TFMSMRT.AP01.DYYMMDD.HHMMSS.out The filename for error files will be the same as the related interface but with a ‘.err’ suffix The filename for message log files will be the same as the related interface but with ‘.log’

10 Interface Test Strategy Test Structure: The test stage structure is based on the time dependencies and logical grouping of interfaces within SMART Interface Test will consist of 6 successive stages Agencies are required to complete testing in the order of the test stages An Agency will only participate in stages which test interfaces used by that Agency Spreadsheet uploads will be tested in Cycle 6

11 Interface Test Strategy Test Structure: Stage 1 – Outbound Configuration Interfaces (9/1/09 – 10/12/09): o Confirms that the outbound interface files are successfully processed in Agency systems o Provides SMART chartfield and vendor values to agencies for use in future testing stages o The initial download for INF01 – Vendor Outbound and INF15 – Chartfield Extract will occur on the first day of the testing period o Incremental updates (for INF01 only) will then be performed to provide deltas to the agencies o The outbound interface files in Stage 1 will not be segregated by agency

12 Interface Test Strategy Test Structure: Stage 2 – Inbound Interfaces (10/5/09 – 11/18/09): o Confirms that the inbound interface files load successfully, without errors o Provides transactions which will be used for stage 3 testing o Confirms that agencies can properly process SMART data received in Stage 1 Stage 3 – Outbound Interfaces/Return Processing (10/26/09 – 11/25/09): o Confirms that the outbound interface files are successfully processed in Agency systems o Processes transactions used in stage 2 and returns the transactions to agencies where applicable

13 Interface Test Strategy Test Structure: Stage 4 – Inbound Error Processing (11/30/09 – 1/15/10): o Confirms that the inbound interfaces detect errors in files sent from Agency systems o Uses SMART Commitment Control functionality to detect budget checking errors as appropriate Stage 5 – Additional Inbound Interfaces (11/15/09 – 1/15/10): o Confirms that the inbound interface files are successfully processed in SMART o Tests interfaces used by a very small group of agencies with special needs. Stage 5 (cont) – SHARP Interfaces (11/15/09 – 1/15/10): o Confirms that the SHARP inbound interface files are successfully processed in SMART

14 Interface Test Strategy Test Structure: Stage 6 - Agency-Defined Testing, Spreadsheet Uploads, Regression Testing, and Direct Connect Testing (1/15/09 – 3/15/09): o Validates Agency-defined conditions for inbound or outbound testing o Allows Agencies to perform regression test as needed o Validates the Direct Connect integration between SMART and vendor websites o Agencies will not be involved in Direct Connect testing o Confirms that the Spreadsheet Upload interfaces are processed successfully in SMART

15 Key Dates Activity/MilestoneStart dateFinish Date Agency performs connectivity testing7/15/098/31/09 Agency attends Interfacing Testing workshop (Task ID 227)8/18/09 Stage 1: SMART Outbound Configuration Interfaces – Agency receives outbound files 9/1/0910/12/09 Stage 2: SMART Inbound Interfaces – Agency provides inbound files 10/5/0911/18/09 Stage 3: SMART Outbound Interfaces (Return Processing) – Agency receives outbound files 10/26/0911/25/09 Stage 4: Error Processing (Inbound) – Agency provides inbound files 11/30/091/15/10 Stage 5: Additional Inbound Interface Test – Agency provides inbound files 11/30/091/15/10 Stage 6: Agency-Use Interface Test using Agency conditions; spreadsheet upload testing; and regression testing (as needed) – Agency receives and provides files as needed 1/15/103/15/10 Completion of Interface TestN/A3/15/10