4-1 Chapter 4 Budgeting the Project. 4-2 Introduction 4 Budgets are plans for allocating organizational resources to project activities. –forecasting.

Slides:



Advertisements
Similar presentations
Project Management 6e..
Advertisements

Copyright by John Wiley and Sons, 2006
Cost Estimation and Budgeting
Systems Analysis and Design 9th Edition
Where does Failure Mode and Effects Analysis (FMEA) come from?  Developed by the Aerospace industry in the1960s  Spread to the Automotive industry 
Chapter 7: Managing Risk
Project Cost Management Estimation Budget Cost Control
Estimating Project Times and Costs
Project Management: A Managerial Approach
Project Management: A Managerial Approach
By: Ashwin Vignesh Madhu
Time and Cost Estimation
MEM 612 Project Management
Lucas Phillips Anurag Nanajipuram FAILURE MODE AND EFFECT ANALYSIS.
Estimating Project Times and Costs CHAPTER FIVE Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Introduction to Cost management
Part II Project Planning © 2012 John Wiley & Sons Inc.
Budgeting and Cost Estimation
Copyright 2012 John Wiley & Sons, Inc. Chapter 7 Budgeting: Estimating Costs and Risks.
Chapter 4 Budgeting the Project
Project Risk and Cost Management. IS the future certain? The future is uncertain, but it is certain that there are two questions will be asked about our.
Review network diagram Forward/backward pass Critical path/activities Float Funding a project Costs estimates Type of costs Financial reports 7-1.
Cost Estimation and Budgeting. Cost management Data collection & cost estimation Cost accounting Cost controll Copyright © 2010 Pearson Education, Inc.
Analyze Opportunity Part 1
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
CS-411W VIII – Budgeting, Costing, and Pricing. Definitions Cost - the value of inputs that have been used to produce something. Inputs are typically.
1 Project Budgeting. 2 Control or Feedback Involves Monitoring/Assessing Output to Determine Necessity of Making Changes in Input or Transformation of.
1 Project Risk Management Project Risk Management Dr. Said Abu Jalala.
Copyright 2012 John Wiley & Sons, Inc. Chapter 7 Budgeting: Estimating Costs and Risks.
Chapter 12 Project Risk Management
Management & Development of Complex Projects Course Code MS Project Management Perform Qualitative Risk Analysis Lecture # 25.
Prepared by Scott M. Shafer, Updated by William E. Matthews and Thomas G. Roberts, William Patterson University Copyright 2007 John Wiley & Sons, Inc.4-1.
Cost Estimation and Budgeting Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall Chapter 8 Learning Objectives After completing.
In Chapter 4: Budgeting the Project Budgeting: the process of forecasting what resources the project will require. Cost estimating process: evaluating.
Chapter 7 Budgeting: Estimating Costs and Risks © 2012 John Wiley & Sons Inc.
Estimating Project Times and Costs CHAPTER FIVE PowerPoint Presentation by Charlie Cook Copyright © 2014 McGraw-Hill Education. All Rights Reserved.
RCM Tools Histogram Pareto Chart Cause and Effect Diagram FMEA.
© 2006 John Wiley and Sons, Inc. Project Management: A Managerial Approach Chapter 7 – Budgeting and Cost Estimation.
Managerial Accounting: An Introduction To Concepts, Methods, And Uses
© 2006 John Wiley and Sons, Inc. Project Management: A Managerial Approach Chapter 7 – Budgeting and Cost Estimation.
Estimating Project Times and Costs CHAPTER FIVE Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Estimating Project Time and Cost
Copyright 2013 John Wiley & Sons, Inc. Chapter 3 Monitoring and Controlling the Transformation System.
MEM 612 Project Management
Project Management in Practice, Fourth Edition
Chapter 7: Project Cost Management
1 Project Management C53PM Session 4 Russell Taylor Staff Work-base – 1 st Floor
Failure Mode & Effect Analysis FMEA Lecture 11. What is FMEA? Failure mode and effect analysis is an Advanced Quality Planning tool that: examines potential.
Copyright 2012 John Wiley & Sons, Inc. Part II Project Planning.
Chapter 7 Project Management and Event Implementation
Copyright 2015 John Wiley & Sons, Inc. Project Planning Part II.
ON “SOFTWARE ENGINEERING” SUBJECT TOPIC “RISK ANALYSIS AND MANAGEMENT” MASTER OF COMPUTER APPLICATION (5th Semester) Presented by: ANOOP GANGWAR SRMSCET,
Budgeting An important Project Management Tool. What is a budget? A Plan A Limit A Schedule A Reality Check An Allocation.
Copyright 2015 John Wiley & Sons, Inc. Chapter 7 Budgeting: Estimating Costs and Risks.
Failure Modes and Effects Analysis. 2 Failure Modes and Effects Analysis (FMEA) ● Purpose – Systematically, prospectively, identify ways in which a process.
Part II Project Planning.
Budgeting and Cost Estimation
Project Management BBA & MBA
Project Management: A Managerial Approach 4/e
Chapter 4 Budgeting the Project.
Budgeting: Estimating Costs and Risks
Copyright 2012 John Wiley & Sons, Inc. Chapter 7 Budgeting: Estimating Costs and Risks.
Part II Project Planning © 2012 John Wiley & Sons Inc.
Budgeting: Estimating Costs and Risks
The Certified Quality Process Handbook Chapter 22: Preventive Action
Project Management: A Managerial Approach
PowerPoint presentation
Failure Mode and Effect Analysis
Financial Management Budget = financial plan used to forecast needs, allocate resources, and track progress set goals and objectives record what is accomplished.
Presentation transcript:

4-1 Chapter 4 Budgeting the Project

4-2 Introduction 4 Budgets are plans for allocating organizational resources to project activities. –forecasting required resources, quantities needed, when needed, and costs 4 Budgets help tie project to overall organizational objectives. 4 Budgets can be used as tool by upper management to monitor and guide projects.

4-3 METHODS OF BUDGETING

4-4 Top-Down Budgeting 4 Based on collective judgements and experiences of top and middle managers. 4 Overall project cost estimated by estimating costs of major tasks 4 Advantages –accuracy of estimating overall budget –errors in funding small tasks need not be individually identified

4-5 Bottom-Up Budgeting 4 WBS or action plan identifies elemental tasks 4 Those responsible for executing these tasks estimate resource requirements 4 Advantage –more accurate in the detailed tasks 4 Disadvantage –risk of overlooking tasks

4-6 COST ESTIMATING

4-7 Work Element Costing 4 Determine resource requirements and then costs for each task –fixed costs (e.g., materials) –labor time –labor rate –equipment time –equipment rate –overhead –GS&A

4-8 The Impact of Budget Cuts Figure 4-1 Two project life cycles

4-9 Activity Versus Program Budgeting 4 Activity oriented budgets are based on historical data accumulated through an activity-based accounting system. –expenses assigned to basic budget lines 4 With program budgets, each project has its own budget. –expenses by task and time period are shown

4-10 IMPROVING COST ESTIMATES

4-11 Learning Curves where T n = the time required to complete the n th unit T 1 = the time required to complete the first unit r = log(learning rate)/log(2)

4-12 Tracking Signals 4 Used to determine if there is a systematic bias in cost or other estimates

4-13 Other Factors 4 Changes in Resource Prices –increase all estimates by same percentage –estimate rate of price change individually for inputs that have significant impact on costs 4 Waste and Spoilage 4 Team Member Turnover 4 “Mythical Man-Month” 4 Organization Climate

4-14 BUDGET UNCERTAINTY AND RISK MANAGEMENT

4-15 Figure 4-4 Estimate of Project Cost: Estimate Made at Project Start

4-16 Three Basic Causes for Change in Projects 4 Errors made by cost estimator about how to achieve tasks. 4 New knowledge about the nature of the performance goal or setting. 4 A mandate.

4-17 Risk Management 4 Risk Management Planning 4 Risk Identification 4 Qualitative Risk Analysis 4 Risk Response Planning 4 Risk Monitoring and Control

4-18 Failure Mode and Effect Analysis (FMEA) 4 List ways project might fail 4 Evaluate severity (S) of each failure 4 Estimate likelihood (L) of each failure occurring 4 Estimate ability to detect each failure (D) 4 Calculate Risk Priority Number (RPN) 4 Sort potential failures by their RPNs