Study of High Intensity Multi-Bunch  -ray Generation by Compton Scattering ATF TB 28/May/2006 presented by Tsunehiko OMORI (KEK) on behalf.

Slides:



Advertisements
Similar presentations
Friday 28 th April Review of the aims and recommendations from the workshop L. Rinolfi.
Advertisements

Overview of 300 Hz Conventional e + Source for ILC Truly Conventional Collaboration ANL, IHEP, Hiroshima U, U of Tokyo, KEK, DESY, U of Hamburg NIM A672.
~1m undulator IP Pol. e + source based on Compton scattering with FEL & 4 mirror cavity Low energy electron beam Gamma-ray FEL photon beam LCWS2014 in.
A_RD_01 Applications of a high finesse Fabry Perot Cavity for the ILC ► Introduction ► Status of the cavity R&D – at ATF – at LAL/Orsay French Labs. :
Compton Experiment at the ATF Update since TILC09 Positron Workshop Durham 28-October-2009 Junji Urakawa instead of T.Takahashi KEK for collaborators.
Applications of a high finesse Fabry Perot Cavity for the ILC ► Introduction ► Status of the cavity R&D – at ATF – at LAL/Orsay Japanese Labs. : KEK, ATF.
Status of g ray generation at KEK-ATF ► Introduction ► Status of the cavity R&D ► Out Look French Labs. : LAL (Orsay) in Collaboration with CELIA (Laser.
Baseline Configuration - Highlights Barry Barish ILCSC 9-Feb-06.
Status of Undulator-based Positron Source Baseline Design Leo Jenner, but based largely on a talk given by Jim Clarke to Positron DESY-Zeuthen,
Beam loading compensation 300Hz positron generation (Hardware Upgrade ??? Due to present Budget problem) LCWS2013 at Tokyo Uni., Nov KEK, Junji.
Demonstration of the Beam loading compensation (Preparation status for ILC beam loading compensation experiments at ATF injector in this September) (PoP.
Conventional Source for ILC (300Hz Linac scheme and the cost) Junji Urakawa, KEK LCWS2012 Contents : 0. Short review of 300Hz conventional positron source.
Status of g ray generation at KEK-ATF ► Introduction ► Status of the cavity R&D ► Out Look French Labs. : LAL (Orsay) in Collaboration with CELIA (Laser.
Plan for the summer Nobuhiro Terunuma, KEK ATF day: ATF Collaboration Meeting European Linear Collider Workshop ECFA LC2013, May 28,
Status of R&D of Optical Cvities at KEK-ATF ►Introduction ►Status of the cavity R&D ►Out Look KEK, Hiroshima University LAL (Orsay) in Collaboration withCELIA.
Update of R&D Optical Cvities at KEK-ATF ►Introduction ►Status of the cavity R&D ►Recent activities ►Out Look KEK, Hiroshima University LAL (Orsay) in.
Status of R&D of Optical Cvities at KEK-ATF ►Introduction ►Status of the cavity R&D ►Out Look KEK, Hiroshima University LAL (Orsay) in Collaboration withCELIA.
Linac e+ source for ILC, CLIC, SuperB, … Vitaly Yakimenko, Igor Pogorelsky November 17, 2008 BNL.
Feedback R&D for Optical Cavity Ryuta TANAKA (Hiroshima univ.) 19 th Feb 2013 SAPPHiRE DAY.
T.Takahashi Hiroshima γγ state of the art and research plan, what system tests can be done at ATF2, ESA T.Takahashi Hiroshima Univ. March GDE BDS/ACFA.
1 st October Linear Collider workshop The CLIC/ILC common work plan progress J. Clarke and L. Rinolfi.
Status of the optical cavity R&D at ATF IWLC2010 Geneva 20-October-2010 T.Takahashi Hiroshima University for collaborators.
Compton/Linac based Polarized Positrons Source V. Yakimenko BNL IWLC2010, Geneva, October 18-22, 2010.
Compton based Polarized Positrons Source for ILC V. Yakimenko Brookhaven National Laboratory September 12, 2006 RuPAC 2006, Novosibirsk.
11/18/2008 Global Design Effort 1 Summary for Gamma-Gamma Mayda M. Velasco Northwestern University November 20, 2008 LCWS08 -- UIC, Chicago.
Status and Plan of Compton  -ray Generation at KEK-ATF Japanese Labs. : KEK, ATF group, Hiroshima University Tsunehiko OMORI (KEK) for 13 February 2014.
WG3a Sources Summary Jim Clarke on behalf of John Sheppard, Masao Kuriki, Philippe Piot and all the contributors to WG3a.
1 FJPPL optical cavity Compton collaboration Optical Stacking Cavity for ILC Compton e + source 15/May/2008 Junji Urakawa (KEK)
Compton Experiment at ATF LCWS10 28-March-2010 T. Takahashi (Hiroshima) / T. Omori (KEK) for collaborators.
Ideas for e+ source and e+ polarization 29-May-2013 ECFA LC Workshop at DESY T. Omori.
Compton Experiment at ATF Tohru Takahashi Hiroshima University for Collaborators (particularly Omori san for slides)
15 th October CLIC workshop The CLIC/ILC common issues for the sources Jim Clarke and Louis Rinolfi.
PULSE LASER WIRE Laser pulse storage in an optical cavity as a beam monitor & an X-ray source Kaori Takezawa Kyoto Univ. 2nd Mini-Workshop on Nano Project.
Summary of Gamma-Gamma session Tohru Takahashi Hiroshima University Mar LCWS10/ILC10.
Laser Compton Polarized e + e + Source for ILC CavityComptonMeeting 26/Jul/2005 Tsunehiko OMORI (KEK)
Laser Based Polarized e + e + Source for ILC 8th ACFA Daegu 11-14/Jul/2005 Tsunehiko OMORI (KEK)
T.Takahashi Hiroshima Optical Cavity R&D for Photon Colliders T.Takahashi Hiroshima Univ. 26 May 2008 NanoBeam 2008.
T.Takahashi Hiroshima Optical Cavity R&D around KEK-ATF T.Takahashi Hiroshima Univ. Nov LCWS08 at Chicago.
Compton Experiment at ATF Compton Meeting at LAL Orsey 2-Dec-2008 Tsunehiko OMORI (KEK) with many thanks to Compton collaborators.
A.Variola LCWS Bejing ERL Compton Scheme Status of the Orsay activity.
1 Scope of PosiPol2008 WS LC related positron source issues (ILC and CLIC) General Capture Section Targets Polarized Particle Physics Laser Applications.
ATF2: Summary of Scheduling Strategy Session Grahame Blair Feedback and Feedforward systems Fast Kicker for ILC bunch train structure Laser-wire Shintake.
T.Takahashi Hiroshima Photon Collider testbed at ATF2 ~a possible plan~ T.Takahashi Hiroshima Univ. May ATF2 meeting.
Ring / ERL Compton e + Source for ILC PosiPol 2008 International Conference Center Hiroshima 16-June-2008 Tsunehiko OMORI (KEK)
Status of the Compton Experiment at the ATF TILC09 18-April-2009 T.Takahashi Hiroshima University for collaborators.
Capture and Transport Simulations of Positrons in a Compton Scheme Positron Source A. VIVOLI*, A. VARIOLA (LAL / IN2P3-CNRS), R. CHEHAB (IPNL & LAL / IN2P3-CNRS)
Compton Experiment at ATF DR 2009 Summary and Plan ATF2 Project Meeting 15-Dec-2009 T. Omori (KEK) for collaborators.
CLIC polarized e+ source based on laser Compton scattering Frank Zimmermann CLIC Meeting, 16. December 2005 Thanks to Eugene Bulyak, Masao Kuriki, Klaus.
T.Takahashi Hiroshima /11/5 Tohru Takahashi Hiroshima University 高橋 徹 広島大学.
November 20, 2008 A. Brachmann Slide 1 Sources Session Summary LCWS 2008 A. Brachmann, J. Clarke.
E + Polarized e + generation at KEK-ATF Tsunehiko OMORI (KEK) POSIPOL 27/Apr/2006.
Laser-Undulator Compact X-ray source (LUCX) POSIPOL2006 Workshop at CERN 1/23 Experimental Plan of X-ray Generation using Optical Resonator using Optical.
Compton for ILC LCWS2012, UT at Arlington, USA T. Omori (KEK)
Conventional source developments (300Hz Linac scheme and the cost, Part-II) Junji Urakawa, KEK PosiPol-2012 at DESY Zeuthen Contents : 0. Short review.
1 Junji Urakawa (KEK, Japan) at PosiPol2012, Under development of Quantum Beam Technology Program(QBTP) supported by MEXT from to
Summary of WG 3 (Sources) First ILC KEK K. Floettmann
Laser electron beam x 30 Multi-Compton chamber system γ-ray cm Conceptual design in 2005 Snowmass X 5 at present Big progress During R&D.
Compton Gamma-ray Generation Experiment by Using an Optical Cavity in ATF POSIPOL 2007 Workshop at LAL Hirotaka Shimizu Hiroshima University.
Update of R&D Optical Cvities at KEK-ATF ►Introduction ►Status of the cavity R&D ►Recent activities ►Out Look KEK, Hiroshima University LAL (Orsay) in.
11/18/2008 Global Design Effort 1 Summary for Gamma-Gamma Mayda M. Velasco Northwestern University November 20, 2008 LCWS08 -- UIC, Chicago.
Status of Hiroshima-KEK Compton Experiment at ATF ► Introduction ► Status of the cavity R&D – for Two mirror cavity – for four mirror cavity KEK – Hiroshima.
Laser electron beam x 30 Multi-Compton chamber system γ-ray cm Conceptual design in 2005 Snowmass X 5 at present Good progress During R&D From Conventional.
Junji Urakawa (KEK) for ATF International Collaboration
Pol. positron generation scheme for ILC
Summary for the Sources working group
Multi banch generation Experiment at ATF
LAL meeting on e+ studies, Oct. 2010
Optical Stacking Cavity for ILC Compton e+ source
ATF project meeting, Feb KEK, Junji Urakawa Contents :
小型X線源の性能確認実験計画 高輝度・RF電子銃研究会 広島大学 高エネルギー加速器研究機構 浦川順治
Presentation transcript:

Study of High Intensity Multi-Bunch  -ray Generation by Compton Scattering ATF TB 28/May/2006 presented by Tsunehiko OMORI (KEK) on behalf of Cavity-Compton collaboration

Cavity-Compton Collaboration

Two ways to get pol. e + (1) Helical Undurator (2) Laser Compton e - beam E >150 GeV Undulator L > 150 m

Two ways to get pol. e + (1) Helical Undurator (2) Laser Compton e - beam E >150 GeV Undulator L > 150 m Our Proposal

Why Laser Compton ? ii) Independence Undulator-base e + : use e - main linac Problem on design, construction, commissioning, maintenance, Laser-base e + : independent Easier construction, operation, commissioning, maintenance iii) Low energy operation Undulator-base e + : need deccelation Laser-base e + : no problem i) Positron Polarization.

ILC requirements 2x10 10 e + /bunch (hard) 2800 bunches/train (hard) 5 Hz (we have time to store e + s) Strategy New: Design for cold LC (ILC) make positrons in 100 m sec. Electron storage ring, laser pulse stacking cavity : Re-use !!! positron stacking ring. Old: Design for warm LC make positrons at once. both electron & laser beams: throw away Basic Idea: K. Moenig P. Rainer T. Omori et al., NIM A500 (2003)

Conceptual Design for warm LC T. Omori et al., NIM A500 (2003) Ne + =1.2x10 10 /bunch Old design

Electron storage ring laser pulse stacking cavities positron stacking in main DR Re-use Concept to main linac Compton ring New design

Laser Pulse Stacking Cavity Input laser (YAGlaser) Energy 0.75 mJ / bunch nsec bunch spacing train length = 50  sec Cavity Enhancement Factor =1000 Laser pulse in cavity 750 mJ/bunch single bunch in a cavity Fabry-perot Resonator

Schematic View of Whole System

R/D items (1) Compton ring (2) Laser Pulse Stacking Cavity (Optical Cavity) (4) Laser (3) e + stacking in DR simulation study hardware R/D for bunch length modulation (optional / in future) experimental R/D We need cooporation with companeis. Progresses of lasers are very rapid.

R/D items (1) Compton ring (2) Laser Pulse Stacking Cavity (Optical Cavity) (4) Laser (3) e + stacking in DR simulation study hardware R/D for bunch length modulation (optional / in future) experimental R/D <- this proposal (Cavity-Compton collaboration) We need cooporation with companeis. Progresses of lasers are very rapid.

Laser Pulse Stacking Cavity is a key. a) One of the most uncertain parts of the current design. b) The efficiency of whole system highly depends on the cavity design. c) The reqirements to other parts highly depends on the cavity design. cavity design : enhancement factor, laser spot size, and collision angle Simulation alone is not effective in desiging cavity. We need experimental R/D.

Plan: Exprmntl R/D at ATF. Make a fist prototype single cavity Put it in ATF ring Hiroshima-LAL-IPN-CERN-Kyoto-Waseda-KEK L cav = 420 mm

Points of R/D Points for high enhancement factor Points for small spot remove/suppress vibration establish feed back technology 2  - L cav --> +0 all are common in pol. e + and laser wire good matching between laser and cavity parabola mirrors (option) Achieve both high enhancement & small spot (less stabile) & (less stabile)

Points of R/D (continued) Number of g-rays strongly depend of crossing angle This in NOT common in pol. e + and laser wire Achieve smaller crossing angle 10W, 357MHz crossing angle Counts/crossing --> Small crossing angle is preferable --> constraint in chamber design ATF e - bench length = 9 mm (rms) Ne = 1x10 10 /bunch

. Collision point is at between QM13R and QM14R (s = 40 m) Collision Point

DR North Straight Section by T. Okugi e - beam optics

alpha_x = m beta_x = m eta_x = 0 m alpha_y = m beta_y = m eta_y = 0 m s = 40 m (=s0) ( between QM13R and QM14R) eps_x = 1.0E-09 m eps_y = 0.5E-11 m Assume e- beam spot size sig_x (s0) = 78 um sig_y (s0) = 6 um Stay almost constant in S = +- 1 m Twiss Parameter e - beam optics and spot size

Mirror R (mm) rms laser spot size (micron) L R Laser stacking cavity with Two Spherical Mirrors Choice of R and spot size our choice for 1st prototype L = mm

Preparation and Schedule Sep/2005 X-ray generation cavity achieved Enh.~1000 But large spot size ~ 100  m Oct Install prototype cavity into ATF ring Nov-Dec test apparatuses using parasitic running Apr/2006 We started assemble of test cavity (Not compatible to install ATF) Aug Start fabrication of prototype cavity Sep Complete prototype cavity Jan/2007 First gamma-ray generation test

Expected Number of  -rays Number of  -rays/bunch Electron :Ne = 2x10 10 (single bunch operation) Laser : 10 W (28 nJ/bunch) Optical Cavity: Enhancement = 1000 N  =1300/bunch X-ing angle = 10 deg N  = 900/bunch X-ing angle = 15 deg Number of  -rays/second Electron :Ne =1x10 10 (multi-bunch and multi-train operation) Electron 20 bunches/train, 3 trains/ring Laser : 10 W (28 nJ/bunch) Optical Cavity: Enhancement = 1000 N  = 8.5x10 10 /sec X-ing angle = 10 deg N  = 5.7x10 10 /sec X-ing angle = 15 deg

2nd & 3rd Prototype Cavities? Longer cavity L cav = 840 mm, 2100 mm Cavity using parabolic mirrors Possible candidates (not decided yet)

Goal of the Project Results of prototype cavity(s) Design cavity of ILC Compton Ring(CR) Decide number of cavities, laser power, number of lasers used in CR. Design Compton Ring & other details.