Project Management - PERT/CPM What is project management? Consider building a house: Step A: Prepare site. (5 days) Step B: Build foundation. (8 days)

Slides:



Advertisements
Similar presentations
WBS: Lowest level OBS: Lowest level
Advertisements

464 Lecture 09 CPM Revision. Scheduling Techniques r The scheduling techniques are î To plan, schedule, budget and control the many activities associated.
Project Scheduling: PERT-CPM
Chapter 3 Project Management.
CPM, Crashing, Resource Leveling using MS Excel & MS Project
EGR Defining the Project Step 1:Define the project scope Step 2:Establishing project priorities Step 3:Create the work breakdown structure Step.
EGR Defining the Project Step 1:Define the project scope Step 2:Establishing project priorities Step 3:Create the work breakdown structure Step.
1 1 Slide © 2001 South-Western College Publishing/Thomson Learning Anderson Sweeney Williams Anderson Sweeney Williams Slides Prepared by JOHN LOUCKS QUANTITATIVE.
Operations Management Session 27: Project Management.
Contents College 4 §4.1, §4.2, §4.4, §4.6 Extra literature on resource constrained project scheduling (will be handed out)
1 Lecture by Junaid Arshad Department of Engineering Management Abridged and adapted by A. M. Al-Araki, sept WBS: Lowest level OBS: Lowest level.
Terminology Project: Combination of activities that have to be carried out in a certain order Activity: Anything that uses up time and resources CPM: „Critical.
Planning of Barus & Holley Addition IWG, AF, FG15 Install Furn. 280 Acquire Furn. REW55 Landscaping REW85 Int Walls & Gl. ES50 Fabricate Glass ES40 Roof,
PROJECT MANAGEMENT. Outline What is a “project”? Project Management Objectives and tradeoffs Planning and Control in Projects Scheduling Methods Constant-Time.
Project Scheduling Basic Approach. projectA project is a collection of tasks that must be completed in minimum time or at minimal cost. activitiesIt is.
Having Fun with Gantt PERT &.
1 1 Slide © 2004 Thomson/South-Western Chapter 12 Project Scheduling: PERT/CPM n Project Scheduling with Known Activity Times n Project Scheduling with.
1 1 Slide © 2000 South-Western College Publishing/ITP Slides Prepared by JOHN LOUCKS.
1 1 Slide © 2011 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole.
Project Scheduling Basic Approach. projectA project is a collection of tasks that must be completed in minimum time or at minimal cost. activitiesIt is.
1 1 Slide © 2009 South-Western, a part of Cengage Learning Slides by John Loucks St. Edward’s University.
PERT/CPM Models for Project Management
1 1 Slide © 2008 Thomson South-Western. All Rights Reserved Slides by JOHN LOUCKS St. Edward’s University.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Project Management OPIM 310-Lecture.
EMGT 501 HW #2 Answer. 020/3 X 3 05/601-1/62/3050/3 X 6 0-5/300-2/3-1/3180/3 (c).3/230with )3/80,0,0,3/50,3/20,0(*)*, ( solution Optimal   Z.
EMGT 501 HW #2 Solutions Chapter 6 - SELF TEST 21 Chapter 6 - SELF TEST 22.
Project Management. Introduction What – Project Management Where – Where the success or failure of a project will have major consequences for the company.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 6 Project Management To Accompany.
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 6 Project Management.
Planning of Barus & Holley Addition Procurement215 Site Preparation60 Pour Foundation31SP Erect Steel15P, PF Roof, Ext. Wall40ES Fabricate Glass50ES Int.
Project Management What is Project Management? Why do Project Management? Tracking project timing and cost. Managing project resources (people, materials,
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
Mark Kelly McKinnon Secondary College Gantt PERT Having Fun with &
Project Management What is Project Management?
Chapter 15 Construction Scheduling. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 17 Project Management Part.
1 Project Planning, Scheduling and Control Project – a set of partially ordered, interrelated activities that must be completed to achieve a goal.
Project Management Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
1 1 Project Scheduling PERT/CPM Networks. 2 2 Originated by H.L.Gantt in 1918 GANTT CHART Advantages - Gantt charts are quite commonly used. They provide.
1 1 © 2003 Thomson  /South-Western Slide Slides Prepared by JOHN S. LOUCKS St. Edward’s University.
1 1 Slide © 2005 Thomson/South-Western Chapter 10 Project Scheduling: PERT/CPM n Project Scheduling with Known Activity Times n Project Scheduling with.
8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 6 Project Management To Accompany.
EGR Project Management Planning Techniques Project manager responsible for developing project implementation plan. Duties includes: Defining.
Project Planning and Budgeting Recall the four stages Project Definition and Conceptualization Project Planning and Budgeting Project Execution and Control.
Chapter 12 Network Scheduling Techniques. Scheduling Techniques Gantt or bar charts Gantt or bar charts Milestone charts Milestone charts Line Balancing.
Project Planning with PERT and CPM Chapter 14
Lecture 61 Project planning tool Lecture 62 Objectives Understand the reasons why projects sometimes fail Describe the different scheduling tools, including.
CPM – Critical Path Method Can normal task times be reduced? Is there an increase in direct costs? Additional manpower Additional machines Overtime, etc…
Network Flow Problems Example of Network Flow problems:
Project Management Planning Techniques
Project Management Chapter 13 Sections 13.1, 13.2, and 13.3.
1 TCOM 5143 Lecture 11 Project Management. 2 What’s Project Management? Project management involves planning and scheduling the different activities of.
Scheduling and Budgeting Engineers Without Frontiers CEE 402.
Chapter 8 - Project Management1 Lecture 2 Today’s lecture covers the followings: 1.To study “project crashing” concept 2.LP formulation for project management.
1 Job Shop Scheduling. 2 Job shop environment: m machines, n jobs objective function Each job follows a predetermined route Routes are not necessarily.
IE 366 Chapter 6, Section 10 Project Planning and Scheduling.
Project Planning, Scheduling and Control Planning: –defines objectives, tasks and preceeding relationships; estimates time and resources Scheduling: –identifies.
Scheduling Scheduling : is the process of converting a project action plan into an operating time table. Why scheduling ? To answer the following questions:
UNIT II Scheduling Procedures & Techniques FLOAT
Project Management: PERT/CPM
Project Management (PERT/CPM) PREPARED BY CH. AVINASH
Activity networks – Example 1
Basic Project Scheduling
Project Scheduling Chapter 14.
Project Planning and Budgeting
PLANNING ENGINEERING AND PROJECT MANAGEMENT
Lecture 6: Time-Cost Trade-Offs
Slides Prepared by JOHN LOUCKS
Presentation transcript:

Project Management - PERT/CPM What is project management? Consider building a house: Step A: Prepare site. (5 days) Step B: Build foundation. (8 days) Step C: Frame walls and roof. (15 days) Step D: Rough in Plumbing (12 days) Step E: Rough in Electrical (10 days) Step F: HVAC Venting (8 days) Step G: Drywall (11 days) Step H: Finish Electrical (5 days) Step I: Finish Plumbing (4 days)Step M: Paint (5 days) Step J: Finish HVAC (2 days)Step N: Landscape (5 days) Step K: Install Kitchen (8 days) Step L: Install Baths (14 days)

Project Management - PERT/CPM Let each node represent a project event/milestone (node 1 is start of project, node 11 is end of project). Let each arc represent a project task/job. Each arc is identified by a job letter and duration. Note the dummy jobs indicating precedence that jobs H and I must complete before K or L begins. 2 A, B,8C,15 D,12 F,8 E,10 G,11 H,5 I,4 J,2 K,8 L,14 M,5 N,5 0 0

Project Management - PERT/CPM What questions might project managers be interested in? How long will the project take? Can I add manpower or tools to reduce the overall project length? To which tasks should I add manpower? What tasks are on the critical path? Is the project on schedule? When should materials and personnel be in place to begin a task? Other?…

Project Management - Examples University Convocation Center Windsor Engine Plant Other major construction projects Large defense contracts NASA projects (space shuttle) Maintenance planning of oil refineries, power plants, etc… other…

Project Management – Minimum Completion Time 2 A, C,4 D,2B,1 E,5 0 LP Solution:Let t i be the time of event i. Min Z = t 5 – t 1 s.t.t 2 – t 1 >= 3 t 3 – t 2 >= 0 t 3 – t 1 >= 1 t 4 – t 2 >= 4 t 4 – t 3 >= 2 t 5 – t 4 >= 5 t i >= 0 for all i

Project Management – Critical Path 2 A, C,4 D,2B,1 E,5 0 LP Solution:insert Lindo Solution here How do you find the critical path from the Lindo solution?

Project Management – Minimum Completion Time and Critical Path 2 A, C,4 D,2B,1 E,5 0 Solution by Network Analysis: Let earliest time of node j, U j, be the earliest time at which event j can occur. Set U 1 = 0 thenU 2 = U 1 + t 12 = = 3 U 3 = Max{U 1 + t 13, U 2 + t 23 } = Max{1,3} = 3 U 4 = Max{U 3 + t 34, U 2 + t 24 } = Max{5,7} = 7 U 5 = U 4 + t 45 = 12

Project Management – Minimum Completion Time and Critical Path 2 A, C,4 D,2B,1 E,5 0 Solution by Network Analysis: Let latest time of node j, V j, be the latest time at which event j can occur while still completing project by minimum the minimum completion time, U m. Set V 5 = U 5 = 12 thenV 4 = V 5 - t 45 = = 7 V 3 = V 4 - t 34 = 7 – 2 = 5 V 2 = Min{V 4 - t 24,V } = 3 V 1 = Min{V 2 - t 12,V 3 – t 13 } = 0

Project Management – Minimum Completion Time and Critical Path 2 A, C,4 D,2B,1 E,5 0 Solution by Network Analysis: To find the critical path, solve for slack time = V j - U j. All events with slack time equal to 0, and tasks connecting these events are on the critical path. V 5 - U 5 = 12 – 12 = 0 V 4 - U 4 = 7 – 7 = 0 V 3 - U 3 = 5 – 3 = 2 V 2 - U 2 = 3 – 3 = 0 V 1 - U 1 = 0 – 0 = 0 Critical Path: 1->2->4->5

CPM – Critical Path Method Can normal task times be reduced? Is there an increase in direct costs? Additional manpower Additional machines Overtime, etc… Can there be a reduction in indirect costs? Less overhead costs Less daily rental charges Bonus for early completion Avoid penalties for running late Avoid cost of late startup CPM addresses these cost trade-offs.

CPM – Critical Path Method Example: Overhead cost = $5/day

CPM – Critical Path Method Enumerative Approach: Reduce job H by 1 day: Total Cost improves by $5 - $4 = $1. Reduce job A by 2 days: Total cost improves by $10 - $8 = $2. Reduce job A by an additional day, and job B by a day? Total cost improves by $5 - $4 - $2 = -$1. Therefore do not take this action. Reduce job A by an additional day, and job C by a day? Total cost improves by $5 - $4 - $2 = -$1. Therefore do not take this action. Evaluate combinations of reducing path and by one day. D & E = $5 - $3 - $3 = -$1F & E = $5 - $5 - $3 = -$3 D & G = $5 - $3 - $1 = $1F & G = $5 - $5 - $1 = -$1 Therefore, reduce job D & G by 1 day: TC improves by $5 - $3 -$1 = $1. Overall improvement: $1 + $2 + $1 = $4.

CPM – Critical Path Method LP Approach: Let t ij – decision variable for time to complete task connecting events i and j. k ij – normal completion time of task connecting events i and j. l ij – minimum completion time of task connecting events i and j. C ij – incremental cost of reducing task connecting events i and j. Model I: Given project must be complete by some time T, which tasks should be reduced to minimize the total cost? Min s.t. for all jobs (i,j) for all i

CPM – Critical Path Method LP Approach: Model II: Given an additional budget of $B for “crashing” tasks, what minimum project completion time can be obtained while staying within your budget? Min s.t. for all jobs (i,j) for all i