Quality assurance of the QXF- Q2 Nb 3 Sn cable mass production C. Scheuerlein, 6 November 2014 HL-LHC/LARP International Review of the Superconducting.

Slides:



Advertisements
Similar presentations
May 9, 2012D. R. Dietderich, LARP CM-18 Cable Fabrication Plans and Experience D.R. Dietderich Lawrence Berkeley National Laboratory bnl - fnal- lbnl -
Advertisements

Outline: Goals for the cable development at CERN. Main parameters of the cable. Cable development work for a cable width of 15.1 mm and for a cable width.
Unit 19 Measurements of strain, stress, and coil mechanical properties
Nb3Sn Cable and Insulation for LARP High-Gradient Quadrupole Magnets
11 Oct , 2013 by Video LBNL Cable Experience for HiLumi HiLumi LARP/LHC Strand and Cable Internal Review Oct , 2013 by Video D.R. Dietderich,
DOE Review of LARP – February 17-18, 2014 QXF Conductor and Cable Arup K. Ghosh Feb
A novel model for Minimum Quench Energy calculation of impregnated Nb 3 Sn cables and verification on real conductors W.M. de Rapper, S. Le Naour and H.H.J.
Collaboration Mtg, St Charles, IL 10/5-6, 2005 A. Ghosh1 Conductor R&D Plan Arup K. Ghosh BNL.
MQXF RRP® Strand for Q1/Q3 A. K. Ghosh MQXF Conductor Review November 5-6, 2014 CERN.
Status of MQXF Conductor LARP Update
HL-LHC/LARP, QXF Test Facility Workshop– R. Carcagno QXF Test Requirements Ruben Carcagno BNL Workshop December 17, 2013.
AARD Sub-panel at Fermilab Feb , 2006 LARP Magnet R&D Program - S. Gourlay1 BNL -FNAL - LBNL - SLAC LARP Magnet R&D Program Steve Gourlay AARD Sub-Panel.
Design optimization of the protection heaters for the LARP high-field Nb 3 Sn quadrupoles M. Marchevsky, D. W. Cheng, H. Felice, G. Sabbi, Lawrence Berkeley.
RRP & PIT Deformation & RRR Comparison: M. Brown, C. Tarantini, W. Starch, W. Oates, P.J. Lee, D.C. Larbalestier ASC – NHMFL – FSU M2OrA – 05 06/30/15.
QXF Cable Status D.R. Dietderich Conductor Working Group Video Meeting, Sept. 17, 2014.
MQXF Cable for Q1/Q3 D.R. Dietderich MQXF Conductor Review November 5-6, 2014 CERN.
Plans and schedule for QXF Giorgio Ambrosio and Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013 The HiLumi LHC Design.
Title – xxxx 1 LARP & US-HiLumi Contribution to the Inner Triplet Quadrupoles G. Ambrosio Cost and Schedule Review CERN, March 9 th -11 th 2015.
Large Hadron Collider Accelerator Research Program Dimensional Changes of Nb 3 Sn Cables during Heat Treatment LBNL: Ian Pong Dan Dietderich.
MQXF support structure An extension of LARP experience Helene Felice MQXF Design Review December 10 th to 12 th, 2014 CERN.
15 Th November 2006 CARE06 1 Nb 3 Sn conductor development in Europe for high field accelerator magnets L. Oberli Thierry Boutboul, Christian Scheuerlein,
LARP Meeting April 2006LARP Magnet Program – D.R. Dietderich LARP Cable R&D D.R. Dietderich LBNL.
Department of Materials Science and Engineering Effects of Core Type, Placement, and Width, on ICR of Nb 3 Sn Rutherford Cables E. W. Collings, M. D. Sumption,
MQXF Q1/Q3 Conductor Procurement A. K. Ghosh MQXF Conductor Review November 5-6, 2014 CERN.
LARP Collaboration Meeting, April 26-28, 2006Gian Luca Sabbi HQ Design Study (WBS ) LARP Collaboration Meeting April 26-28, 2006 N. Andreev, E.
D.R. Dietderich Frascati, Italy Nov , 2012 RRP-NbSn Conductor for the LHC Upgrade Magnets RRP-Nb 3 Sn Conductor for the LHC Upgrade Magnets A. K.
Conductor Review Oct 16-17, 2013LARP Strand :Specs. Procurement, Measurement- A. Ghosh1 LARP Strand: Specifications, Procurement and Measurement Plans.
Arjan Verweij, AT-MAS, Workshop on test facilities and measurement equipment needed for the LHC exploitation, 12 April 2006 B163 - FRESCA.
LASA Medium-β Cavity Progress Update Paolo Michelato 2 nd ESS Collaboration Meeting - SRF Elliptical Cavities 15 th December 2015.
Hi-Lumi Conductor Procurement A.Ballarino, B. Bordini, L. Oberli HL-LHC/LARP International Review of Superconducting Cable for the HL-LHC Inner Triplets.
E. Todesco OUTPUT OF THE CABLE REVIEW E. Todesco and the QXF team CERN, Geneva Switzerland CERN, 10 th December 2014 QXF design review, CERN.
LARP Meeting, Oct. 6, 2005 D.R. Dietderich, LBNL1 LARP Cable R&D FY05 & FY-06 Plans D.R. Dietderich, LBNL Geneva, IL October 5-6, 2005 bnl – fnal – lbnl.
Outline: Strand R&D and strand procurement and inventory. Main parameters of the cable without a core. Results obtained during the cable development without.
HTS for Upgrades: overview of test requirements Amalia Ballarino, CERN Review of superconductors and magnet laboratories, A. Ballarino.
Stress review - CERN, Review on stress sensitivity Part I R. Flükiger B. Seeber Group of Applied Physics (GAP) University of Geneva 1.
HL-LHC/LARP Cable Review, CERN, Nov Lessons Learnt in LARP- A. Ghosh 1 Lessons Learnt from LARP experience Arup. K. Ghosh HL-LHC/LARP International.
HL-LHC QXF Conductor/Cable Internal Review. Thank You First of all, let me thank everybody for accepting an extended work time and have this meeting over.
HiLumi-LARP Annual Meeting November 2014 MQXF pre-series and series magnets fabrication plans Ruben Carcagno November 19,
29 th September 2009 EuCARD-WP7 HFM Conductor specification and procurement Luc OBERLI CERN, TE-MSC-SCD.
Long Quad (LQ) & High Gradient (HQ) Series Alexander Zlobin bnl - fnal- lbnl - slac US LHC Accelerator Research Program DOE LARP review Fermilab, June.
LARP Review, June 10, 2013Magnet Cost and Schedule – M. Kaducak 1 IR Quadrupole Cost and Schedule Marc Kaducak LARP Review June 10, 2013.
Discussion about the technical specification of the Nb-Ti strand and Rutherford cable for the MCBXF corrector magnets.
Logo area 11 T Wire: Procurement Strategy and QA/QC B. Bordini, A. Ballarino, M. Macchini Acknowledgments: thanks to E. Charifoullina for her contribution.
Cold mass procurement, status and plan, QA-QC H. Prin With contribution from S. Becle, O. Housiaux, R. Principe, J.-L. Rudeiros Fernandez, F. Savary 3.
Answers to the review committee G. Ambrosio, B.Bordini, P. Ferracin MQXF Conductor Review November 5-6, 2014 CERN.
Logo area HL LHC IT STRING M. Bajko CERN TE-TM and QXF Review.
LARP CM15, SLAC, 11/3/2010GianLuca SabbiSummary of MS Parallel Sessions Summary of Magnet Systems Parallel Sessions GianLuca Sabbi LARP Collaboration Meeting.
2 nd LARP / HiLumi Collaboration Mtg, May 9, 2012LHQ Goals and Status – G. Ambrosio 11 LHQ Goals and Status Giorgio Ambrosio Fermilab 2 nd LARP / HiLumi.
LARP Collaboration Meeting 15 Nov 1-3, 2010 Conductor Procurement and Qualification Arup K. Ghosh (BNL) bnl - fnal- lbnl - slac US LHC Accelerator Research.
DOE Review, 6/2/2011Answers to Committee Questions – Magnet Systems Answers to committee questions - magnets.
CERN QXF Conductor Procurement and Cable R&D A.Ballarino, B. Bordini and L. Oberli CERN, TE-MSC-SCD LARP Meeting, Napa, 9 April 2013.
MQXF Cable for Q1/Q3 D.R. Dietderich MQXF Conductor Review November 5-6, 2014 CERN.
Procurement of Nb 3 Sn strand, cable fabrication, and quality control for the U.S. Hi-Lumi LHC Accelerator Upgrade Project Lance Cooley, Fermilab L3 manager.
CERN Cabling Experience FRESCA 2, 11 T Dipole and MQXF A. Ballarino
OUTLINE Motivation Simulation plans Experimental setup Results
Lessons learnt from CERN experience
Some Design Considerations and R &D of CEPCB Dipole Magnet
MQXF cable with RRP wires for Q2
Cold mass design, assembly plans and QA/QC at CERN
Development of Nb3Sn (and Bi-2212) strands in preparation for the FCC
11 T cable development and procurement strategy at CERN
MQXF Goals & Plans G. Ambrosio MQXF Conductor Review
Development of High Current Nb3Sn Rutherford Cables for NED and LARP
CERN Conductor and Cable Development for the 11T Dipole
MQXF Short Models Status and Plans
MQXF cable with RRP wires for Q2
Status of the PANDA Solenoid Magnet Production in BINP
MQXF updates P. Ferracin October 9th, 2014.
Large aperture Q4 M. Segreti, J.M. Rifflet
Status of the PANDA Solenoid Magnet Production in BINP
Presentation transcript:

Quality assurance of the QXF- Q2 Nb 3 Sn cable mass production C. Scheuerlein, 6 November 2014 HL-LHC/LARP International Review of the Superconducting Cable for the HL-LHC Inner Triplets Quadrupoles (MQXF)

Outline Scope and organisation of the QXF Q2 Nb 3 Sn cable QA Quantities and schedule LHC Nb-Ti cable QA and holding points QXF-Q2 Nb 3 Sn cable QA and holding points QXF Q2 Nb 3 Sn cable homogeneity verification QC tests of the produced cable extremities Conclusion 06/11/2014QXF cable review, C. Scheuerlein2

Scope and organisation of the QXF-Q2 cable quality assurance (QA) QA is put in place when the cable development has been completed, and when the tooling and all cabling parameters have been defined and are frozen. The goal of the QA is to guarantee the uniformity of the entire QXF Q2 cable production, and to make sure that all cable unit lengths (ULs) that will be delivered to the magnet factory are conform with specifications. The QA team is independent from the cable production team. 06/11/2014QXF cable review, C. Scheuerlein3

QXF-Q2 cable quantities and schedule 10 UL for prototypes 45 UL for Q2 series production (32+13 spare) over a period of about 3 years (see Amalia’s presentation). The QA/QC procedures need to be ready before the start of the production of the prototype Q2 cables (in about one years time). For the organisation of the QC tests we also need to take into account other Nb 3 Sn cables to be produced and controlled, e.g. for the 11 T dipole cables. 06/11/2014QXF cable review, C. Scheuerlein4

QC tests and holding points during the production of the LHC Nb-Ti Rutherford cables All 7000 km (more than 11’000 Uls) of cable were produced outside CERN (at Alstom, Brugg Kabelwerke (with two cabling machines), New England Electric Wire (NEEW) and Furukawa Electric Co., Ltd. (FEC) A rigorous test protocol had been imposed on all companies. On-line cable dimensional measurements with CMM of all cables at production sites Re-measurement of dimensions of 5500 UL at CERN with three CMM lines Samples cut from cable extremities controlled at production sites and at CERN 2600 cable I c measurements at BNL and at CERN 5500 interstrand contact resistance measurements at CERN More than 30’000 RRR measurement of extracted strand samples at CERN, in addition to the RRR tests by the companies. Systematic cross checks of company test results with CERN test results. Material and data flow during the LHC conductor production at FEC and holding points. From S. Meguro, IEEE Trans. Appl. Supercond. 14(2), (2004) From D. Leroy, IEEE Trans. Appl. Supercond. 16(2), (2006) 06/11/2014QXF cable review, C. Scheuerlein5

Sequence of QXF-Q2 quality control steps and holding points There will be two holding points in the Q2 cable production. The first holding point is the cabling map approval, where the QA team verifies that all strands to be used have been approved, and that the approved tooling and production parameters will be used. The second holding point is the UL approval. After verification that all online measurements and all QC tests are conform, the QA team approves the cable ULs for delivery to the magnet factory. 06/11/2014QXF cable review, C. Scheuerlein6

Some differences between the Q2 Nb 3 Sn and the LHC Nb-Ti Rutherford cable mass productions relevant for the QA Importance of the diffusion barrier integrity after Nb 3 Sn cabling. Comparatively small mechanical stability of Nb 3 Sn cables. Important volume changes in Nb 3 Sn after cabling. Presence of a stainless steel core in the QXF cables (in the LHC cables the interstrand contact resistance was controlled by the oxidation of a Cu 3 Sn surface layer). Little experience with the QA of the mass production of Nb 3 Sn Rutherford cables. Comparatively small Q2 cable production rate. Q2 cable production is interrupted by the production of other cable types. Q2 cables are made with two Nb 3 Sn strand types (PIT and RRP) with different properties. 06/11/2014QXF cable review, C. Scheuerlein7

QA of a cabling run The QA of the cabling process must assure the cable homogeneity over the entire cable length of 710 m, so that the samples cut from the cable extremities are representative for the entire UL. For this purpose we will analyse: Production parameters Relative variations of the cable dimensions Cable edge deformation After the cable run, at least ten meter-long cable samples are cut at each extremity of all ULs for further QC tests. Long cabling runs consisting of several ULs are desirable for the cable homogeneity, as well as for the cabling efficiency. 06/11/2014QXF cable review, C. Scheuerlein8

Verifying the cable homogeneity Relative changes of cable dimensions are monitored online with the so-called Cable Measuring Machine (CMM). We plan to monitor the cable edge deformation by edge facet analyses, as suggested by LBNL. If feasible, a procedure for the online analysis of the cable edge deformation will be developed, with the definition of a maximum acceptable edge facet size, and a maximum edge facet size variation on both sides of RRP and PIT Q2 cables. Wherever possible cabling parameters shall be measured and recorded online and be used for statistical process control (SPC). Facets on the strands at the thin edge of two LARP Nb 3 Sn cables produced at LBNL. From D.R. Dietderich, et al., IEEE Trans. Appl. Supercond. 17(2), (2007) 06/11/2014QXF cable review, C. Scheuerlein9

Tests of entire cables During LHC Nb-Ti cable production 2600 cable I c measurements have been performed at BNL and at CERN. The preparation of Nb 3 Sn cable samples for I c measurements is delicate, and availability of test facilities is limited. The local RRR at the most deformed strand parts cannot be assessed by routine cable tests. Therefore, cable I c tests as a routine QC tool are not foreseen and the QC of the produced cables will be mainly based on tests of extracted strands. Some cable measurements should be performed at the beginning of the production. 06/11/2014QXF cable review, C. Scheuerlein10 From A. P. Verweij, A. K. Ghosh, IEEE Trans. Appl. Supercond. 17(2), (2007)

Routine QC tests of the samples cut from the cable extremities The number of QC tests to be performed depends on the number of ULs that can be produced in one cabling run. Long cabling runs could reduce the number of some QC tests. Cable dimensional measurements – at least one per UL → 55 ten-stack measurements Extracted strand I c measurements –3 to 5 strands per UL → about I c measurements Extracted strand RRR measurements - 10 strands per UL → about 550 RRR measurements Extracted strand local RRR measurements at the thin edge - 40 strands per UL → about 2200 local RRR measurements. Interstrand contact resistance R c measurements → to be defined (not foreseen as a routine QC test) Cable surface cleanliness → to be defined (not foreseen as a routine QC test) A mechanical cable stability QC test is not foreseen 06/11/2014QXF cable review, C. Scheuerlein11

Cross checks of cable QC test results For the LHC Nb-Ti strand and cable QA the firm QC results had been cross checked with the CERN QC results. Similarly, for the Nb 3 Sn strands the firms QC results can be compared with the CERN QC results. It should be helpful to exchange a limited number of cable samples with another laboratory, in order to have a cross check of our QC results: Dimensional measurements (ten stack and CMM) Edge facet measurements Local RRR at the thin edge of extracted strand 06/11/2014QXF cable review, C. Scheuerlein12

General and production procedures to be developed or finalised We will use the CERN Engineering and Equipment Data Management (EDMS) service for the distribution, control and approval of all procedures. General procedures include: Naming convention and data flow for the QXF-Q2 Nb 3 Sn cable production Cutting, storage and shipment of the QXF-Q2 Nb 3 Sn strands, cables and test samples Production procedures include Nb 3 Sn strand re-spooling for the QXF-Q2 cable production Alignment of the tooling for the QXF-Q2 Nb 3 Sn cable production Online control of the QXF-Q2 Nb 3 Sn cable production parameters 06/11/2014QXF cable review, C. Scheuerlein13

Cable QC procedures QC test procedures with acceptance threshold values must allow us to distinguish unambiguously between conform cables that can be used in a magnet, and non-conform cables that must not be used. The QC procedures that need to be developed or finalised include: Measurement of the QXF Q2 Nb 3 Sn cable edge facets Measurement of the QXF Q2 Nb 3 Sn cable dimensions with the Cabling Measurement Machine (CMM) The local RRR measurement at the thin edge of strands extracted from the QXF Q2 Nb 3 Sn cables Critical current measurement using strands extracted from the QXF Q2 Nb 3 Sn cables 06/11/2014QXF cable review, C. Scheuerlein14

Conclusion The homogeneity and conformance with specifications of each of the 55 Q2 cable UL will be assured by the combination of: quality control tests using samples cut from the cable extremities analysis of the production parameters, online measurement of the cable dimensions, and if feasible the online measurement of the cable edge deformation QC procedures and threshold values must allow the unambiguous distinction between non- conform cables, and conform ULs that can be used for the construction of the QXF-Q2 coils. The QC of the produced cables is mainly based on tests of extracted strands. Cable I c tests as a routine QC tool are not foreseen. The local RRR measurement at the thin cable edge will be the most important QC test. For the QA of the QXF-Q2 cables about 2200 local RRR measurements at the thin edge of extracted wires will be performed. In addition 550 integral RRR measurements and between I c measurements of extracted strands will be performed. A good information flow and collaboration are essential. 06/11/2014QXF cable review, C. Scheuerlein15

Thank you for your attention 06/11/2014QXF cable review, C. Scheuerlein16 lurvink.ch/galerie/natur/images/eisberg.jpg

Back-up slides 06/11/2014QXF cable review, C. Scheuerlein17

Cabling induced Cu resistance ratio changes For the QC of the LHC Nb-Ti strands and cables more than 30’000 RRR measurements have been performed at CERN. Results have been cross checked with the companies RRR results. More than 18’000 RRR measurements have been performed on strands extracted from cables. The cold work during cabling invariably degrades the Cu RRR. In contrast to the LHC Nb-Ti cables, where the RRR degradation is completely recovered during the final cable heat treatment, the cabling tools and parameters can strongly influence the RRR of heat treated Nb 3 Sn cables. 06/11/2014QXF cable review, C. Scheuerlein From Z. Charifoulline IEEE Trans. Appl. Supercond. 16(2), (2006)

Comparison of the mechanical properties of different wires used for cabling Comparison of the stress-strain curves of different Nb 3 Sn/Cu, Nb-Ti/Cu and Cu wires. From: R. Bjoerstad et al. CERN internal note, EDMS No , (2014) Nb 3 Sn BR Nb 3 Sn-RRP Nb 3 Sn-PIT Cu hard drawn Nb-Ti LHC 02 06/11/2014QXF cable review, C. Scheuerlein