The Towers at the City College of New York Robin Scaramastro - Structural Option - Advisor: Dr. Memari Senior Thesis Final Presentation – Spring 2007.

Slides:



Advertisements
Similar presentations
8621 Georgia Avenue Silver Spring, MD
Advertisements

Carl Hubben – Structural Option Ae senior thesis Office Building-G EASTERN UNITED STATES.
The Pennsylvania State University Architectural Engineering Structural Emphasis Advisor: Dr. Andres Lepage Steven Stein ROOSEVELT ISLAND SOUTHTOWN BUILDING.
Jeremiah Ergas AE 482 – 5 th Year Senior Thesis Structural Option April 15 th, 2008 Faculty Consultant: Dr. Ali Memari Northside Piers – Brooklyn, NY Structural.
A Medical Office Building For The Primary Health Network Daniel Goff I Structural Option Dr. Thomas Boothby l Faculty Advisor Sharon, Pennsylvania Source:
Penn State Hershey Medical Center Children’s Hospital Hershey, Pennsylvania Matthew Vandersall Structural Option AE Senior Thesis Dr. Richard Behr.
The University Sciences Building Northeast, USA Final Presentation Chris Dunlay Structural Option Dr. Boothby.
OVERLOOK TOWERS AT DULLES CORNER HERNDON, VIRGINIA Anthony Perrotta AE Senior Thesis – Structural Option.
University Health Building Thesis Final Presentation
Daniel Bellay Lancaster County Bible Church Structural Option Lancaster County Bible Church.
Courtesy of Holbert Apple Associates Georgia Avenue Building Introduction Statistics Gravity System Lateral System Problem Statement & Solution.
Samuel M. P. Jannotti Structural April 14, 2008 American Eagle Outfitters Quantum III: South Side Works.
LOCKWOOD PLACE BALTIMORE, MARYLAND Monica Steckroth- Structural Option.
360 State Street New Haven  CT  Structural | Sabrina Duk | T. Boothby.
George Read Hall The University of Delaware
UNC Imaging Research Building UNC Imaging Research Building Chapel Hill, NC Daniel R. Hesington, LEED AP l Structural Option AE Senior Thesis l Spring.
Rockville Metro Plaza II Rockville Pike John Vais | Structural Option PSU AE Senior Thesis 2014 Faculty Advisor – Dr. Hanagan Rockville, Maryland
Hershey Research Park Building One Jonathan Krepps Structural Option Senior Thesis 2013 Faculty Advisor: Dr. Hanagan.
Kenneth G. Langone Athletic and Recreation Center Kyle Oberdorf Structural Option Thesis April 2007.
All Hakuna Resort photos in courtesy of LMN Development LLC Young Jeon Structural Option Advisor: Heather Sustersic Hakuna Resort AE Senior Thesis 2015.
Nick Szakelyhidi Structural Option Office Building Washington, DC Nick Szakelyhidi Structural Option.
GARY NEWMAN STRUCTURES OPTION ADVISOR: DR. HANAGAN SENIOR THESIS PRESENTATION SPRING 2008.
First Baptist Church of Doylestown Senior Thesis Structural Emphasis James Chester Preliminary Phase II Design.
AMERICAN EAGLE OUTFITTERS Quantum II Corporate Headquarters Michael Sandretto Spring – 2007 Structural Option.
Southeast View of IRMC West View of IRMC. Presentation Outline Introduction Existing Structure Thesis Goals Structural Depth Lighting Breadth Conclusion.
BRYAN DARRIN SENIOR THESIS PRESENTATION MILLENNIUM HALL DREXEL CAMPUS PHILADELPHIA, PA.
Structural System Redesign Existing Conditions Proposal Gravity Design Lateral Design Cost Comparison Schedule Impact Conclusions.
The Odyssey Condominium Aaron Snyder Arlington, Virginia
SEAN BEVILLE STRUCTURAL OPTION ADVISOR: PROF. BOOTHBY APRIL 13, 2009 TEMECULA MEDICAL CENTER “STRUCTURAL SYSTEM OPTIMIZATION” THE DEPARTMENT OF ARCHITECTURAL.
Joe Sharkey Structural Option Christiana Hospital 2010 Project Newark, DE.
Gateway Plaza Wilmington, DE Elizabeth Hostutler Structural Option.
Caitlin Ferrell Structural Option Senior Thesis Presentation Spring 2006 The Erie Convention Center and Sheraton Hotel Erie, Pennsylvania Architectural.
Mathew Nirenberg AE Senior Thesis Structural Option.
1776 WILSON BOULEVARD ARLINGTON VIRGINIA Penn State University Senior Thesis 2012 Faculty Advisor: Thomas Boothby Joshua Urban Structural Option.
URS – ARENA DISTRICT OFFICE BUILDING DAVID LEE STRUCTURAL OPTION.
Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.
Dan Donecker BAE/MAE – Structural Option Senior Thesis Project 35 West 21 st Street New York, New York.
Howard County General Hospital Patient Tower Addition Columbia, MD Kelly M. Dooley Penn State Architectural Engineering Structural Option.
Welcome to Daniel Painter’s Architectural Engineering Senior Thesis Presentation of Two Freedom Square April 16, 2003 Pennsylvania State University.
Senior Thesis 2006 The Pennsylvania State University
Jonathan Goodroad Structural Option 2005 Thesis Penn State AE Delaware State University Administration and Student Services Building.
T IMOTHY H P ARK – S TRUCTURAL O PTION. Building Summary Current Systems Proposal Description Gravity Lateral Other Structural Factors Breadth Options.
Brad Oliver – Structural Option Advisor – Professor Memari.
Oklahoma University Children’s Medical Office Building Oklahoma City, Oklahoma AE Senior Thesis Final Report April 14, 2014 Jonathan Ebersole Structural.
Fordham Place Bronx, NY Aric Heffelfinger Structural Option Spring 2006.
Justin Purcell Structural Option Advisor: Dr. Hanagan.
151 First Side William J. Buchko introduction overview proposal structural depth acoustics breadth cm breadth conclusions 151 First Side Pittsburgh, PA.
Computer Associates International, Regional Office
Park Potomac Office Building “E” Kyle Wagner l Structural Option AE Senior Thesis l Spring 2010 Faculty Consultant l Prof. Kevin Parfitt.
 Building Background  Building Structural System  Problem Statement  Proposed Solution  Structural Investigations  Architectural Impact  Sustainability.
Eastern USA University Academic Center Alexander AltemoseIStructural Option.
SteelStacks Performing Arts Center Sarah Bednarcik | Structural BAE/MAE Faculty Advisors: Dr. Linda Hanagan & Dr. Ali Memari Spring Thesis 2013Bethlehem,
Brandon mckee ae senior thesis 2007 construction management penn state university ambridge area high school Ambridge Area High School ambridge, pennsylvania.
Chagrin Highlands Building One Beechwood, Ohio Branden J. Ellenberger - Structural Option Senior Thesis 2004.
Michael A. Troxell Structural Option Senior Thesis 2006 The College of Business Administration Northern Arizona University Flagstaff, Arizona.
Biobehavioral Health Building The Pennsylvania State University Daniel Bodde Structural Option Advisor – Heather Sustersic.
THE NORTHBROOK CORPORATE CENTER Redesign of the Lateral Load Resisting System.
Arlington Gateway Hotel 801 North Glebe Road Arlington, Virginia Michael Gray Penn State University AE Senior Thesis Presentation 2005.
William W. Wilkins Professional Building Columbus, Ohio Michelle Benoit Senior Thesis Presentation Spring 2007 Structural Option.
Hunter Woron Spring 2012 Structural Professor Parfitt.
Mountain State Blue Cross Blue Shield Headquarters
Pearl Condominiums Philadelphia, PA
Advisor: Professor M. Kevin Parfitt
Introduction James W. & Frances G. McGlothlin Medical Education Center
Acterna Headquarters John M Sekel, EIT Germantown, Maryland
Outline Introduction Structural Redesign Gravity System
Ryan Johnson - Structural Option
JAKE POLLACK NEW YORK POLICE ACADEMY STRUCTURAL OPTION
Rutgers University Law School Building Addition and Renovation Nathan E. Reynolds Advisor: M. Kevin Parfitt Structural Option The Pennsylvania State.
North Shore at Canton The Pennsylvania State University
Presentation transcript:

The Towers at the City College of New York Robin Scaramastro - Structural Option - Advisor: Dr. Memari Senior Thesis Final Presentation – Spring 2007

Presentation Overview Introduction Existing Structural System Problem Statement Proposed Solution Structural Depth - Gravity System - Lateral System - Foundations Mechanical Breadth - LEED Points Construction Breadth - Cost Impact - Schedule Impact Conclusion

Introduction Building Information: - 181,000 SF dormitory for CCNY students and faculty - 6, 8, and 10 stories - Located at 130 th St. and St. Nicholas Terrace, New York - Project Cost : $59 million Codes Used in Design: - The Building Code of the City of New York - ASCE UBC 97

Existing Structural System Structural Framing – Cast in place concrete

Existing Structural System Structural Framing 8” Flat-Plate Concrete Slab Gr 60 Reinforcement f’c = 5,000 psi

Existing Structural System Structural Framing Rectangular reinforced concrete columns 12” – 14” diameter round concrete columns f’c = 5000 psi

Existing Structural System Structural Framing 12” thick reinforced concrete shear walls Poured monolithically (3 floors) 2 curtains of Gr 60 reinforcement f’c = 4000 psi

Existing Structural System Foundations - Bearing pressure of 40,000 psf - Typical spread footings for columns and grade beams - Mat slabs used for shear walls

Problem Statement Large concrete columns in floor to ceiling corner windows

Problem Statement Irregular grid Significant impact on floorplan

Proposal -Apply a steel structure - cantilever building corners to eliminate columns in windows - create a regular grid system - reduce the number of columns - create less impact on floor plan

Structural Depth Building redesigned in steel

Structural Depth Gravity System

Structural Depth Gravity System - 2” Composite metal deck with 2 ½” concrete slab - W10 and W12 composite infill beams with shear studs - W14 – W21 girders -W10 gravity columns - Fireproofing provided by gypsum board

Structural Depth Typical Foundation - Spread footings like used in existing structure - less concrete needed for gravity column foundations

Structural Depth Lateral System

Structural Depth Lateral System - Braced frames implemented in stair cores

Structural Depth Lateral System - Braced frames implemented in stair cores - Moment frames with steel angle kickers used elsewhere - Placed to reduce eccentricity and torsional moment - Lateral columns W12 for added stiffness - Bracing provided by 2L6x6

Structural Depth Typical Connections Shear Connection - Single Angle

Structural Depth Typical Connections Moment Connection - Fully Restrained

Structural Depth Typical Connections Bracing Connection

Structural Depth Impact on Foundations - Reduction of dead load from self weight - Up to 46% less concrete needed for some spread footings

Mechanical Breadth - LEED Certification - 26 possible points can be earned - sustainable site - water efficiency - material selection - indoor air quality Investigated the existing building envelope - R-Value = Q = 2.42 BTU/hr (1sf wall area)

Mechanical Breadth - Proposed building envelope - R-Value = Q = 2.09 BTU/hr (1sf wall area) - Heat loss during winter months 14% less than the existing building envelope

Construction Breadth Concrete Construction Cost and Schedule - Duration = 140 days (28 weeks) - Cost = $5.4 million Source: ICE 2000 RS Means

Construction Breadth Steel Construction Cost and Schedule - Duration = 95 days (19 weeks) - Cost = $6.0 million Source: ICE 2000 RS Means Primavera

Conclusion - Recommend steel for the structure - corner columns are eliminated in floor-to-ceiling windows - positive impact on floor plan - slightly higher construction cost - 9 weeks are saved in construction duration - steel construction is common in NYC - less concrete needed for foundations - potential for LEED certification

THANKS!!! Acknowledgements Bruce McKee (Capstone Development) Marc Bowen & Mike Ergler (Greenman-Pedersen) Delia Nevola (Goshow Architects) Jackie Horowitz (Turner Construction) All AE Faculty All My Friends and Family Robert Chin (CCNY Photographer)

Conclusion QUESTIONS?? Photos courtesy Robert Chin