Participant Retention Plans MTN-003 Study-Specific Training.

Slides:



Advertisements
Similar presentations
1 MTN-003 Training Follow-up Visit Scheduling and Visit Coding SSP Sections and
Advertisements

ASPIRE Off-Site Visits. Rationale Why make an allowance for off-site visits in the protocol? Adherence & Retention Off-site visits Improving Clinic Flow.
HIV Counseling &Testing. Page 346 HIV and Risk Reduction (RR) Counseling Required at all scheduled visits Includes HIV Pre- and Post-test counseling.
Please write down the first 3 things that come to mind when someone says the word “homeless”
Multiple Indicator Cluster Surveys Survey Design Workshop
After Core Strategies SDPI DP Grantee Meeting March 10, 2006 Denver, CO.
Competitive Grant Program: Year 2 Meeting 2. SPECIAL DIABETES PROGRAM FOR INDIANS Competitive Grant Program: Year 2 Meeting 2 HH Data Coordinator Training.
Competitive Grant Program: Year 2 Meeting 3. SPECIAL DIABETES PROGRAM FOR INDIANS Competitive Grant Program: Year 2 Meeting 3 SPECIAL DIABETES PROGRAM.
Competitive Grant Program: Year 2 Meeting 3. SPECIAL DIABETES PROGRAM FOR INDIANS Competitive Grant Program: Year 2 Meeting 3 SPECIAL DIABETES PROGRAM.
Module 2: Basic analyses. Module 2: Learning Objectives  Identify approaches for setting targets  Understand common analyses that calculate program.
Moyock Middle School School Improvement Plan Results and Next Steps.
1 MTN 003 Data Management Considerations SSP Sections 14, 15 & 17.
Shelley Facente, Thomas Knoble, Omar Menendez, Teri Dowling San Francisco Department of Public Health, HIV Prevention Section Kevin Delaney Division of.
ASPIRE TRAINING Study Product Considerations & Accountability for Non-Pharmacy Staff.
New Jersey Family – Centered HIV Care Network  Lead Agency New Jersey Department of Health  Mission- provide comprehensive, culturally sensitive, coordinated.
Practice Management Training Webinar - Chapter 2 of 4 Ros Campbell Product Consultant.
MTN-016 Source Documentation, Resources, Additional Tips, and Reporting.
Assessment Policy. Reporting Student Data in AERIS All student data must be entered into AERIS by the 15 th and approved by the 22 nd of each month for.
Retention. Numbers that Matter 3476= total number of women enrolled at least 95% retention at each visit, at each study site 100% attention to data quality,
Home-Based Care Volunteers Results from A Study of Home- Based Care Volunteers in the SUCCESS Program: Zambia. Shannon Senefeld Catholic Relief Services.
Retention: Feedback to Sites and Feedback to Sites and Participant Tracking Database.
Quarterly Meeting PMHP Collaborative PIP April 4, 2012 PMHP Analysis of Improvement.
Implementation Update of PG&E’s LIEE Budget Application Presentation to the LIOB March 24, 2009 Burbank, CA Frances Thompson.
RESCUE: ACRIN 4701 Protocol Development & Regulatory Compliance (PDRC) Josephine Schloesser, ACRIN Monitor Chris Steward, ACRIN QC Auditor.
NFP CARE TEAM PATIENT ADVOCATE New Roles, New Possibilities.
TRACKING AND REPORTING PROGRESS AND CONTINUOUS IMPROVEMENT AmeriCorps Program Directors’ Kickoff: 2015 –
Welcome! Please join us via teleconference: Phone: Code:
Participant Accrual. Numbers that Matter 3476= total number of women enrolled at least 95% retention at each visit, at each study site 100% attention.
Engaging Student Affairs Professionals in Division-Wide Assessment Lisa Garcia-Hanson,University of Washington Tacoma Charlotte Tullos, Central Washington.
This is not Jeopardy!. Rectangle of Retention Public Health slide3 Likely Retention “Bennys” Slide 6 Role Play slide 9 Chicken or egg? Slide.
Option B+ Weekly SMS reporting; data Use to improve service delivery Zikulah Namukwaya, MD, MPH MU-JHU Care /Mulago Hospital AIDS 2014 – Stepping Up The.
Module 5: Data Collection. This training session contains information regarding: Audit Cycle Begins Audit Cycle Begins Questionnaire Administration Questionnaire.
Leadership Training Program Labor. Labor Team supports and assists management teams to: Understand and manage their labor budget. Identify labor hours.
Study Product Return Re-Supply and Re-Issue MTN-003 Study-Specific Training.
Improving Eligibility Documents November, Improving Data Collection The State Office of AIDS (OA) is now working with providers to improve the quality.
Monitoring visits and compliance with money laundering regulations.
Responsiveness to Instruction RtI Tier III. Before beginning Tier III Review Tier I & Tier II for … oClear beginning & ending dates oIntervention design.
Participant Accrual Plans MTN-003 Study-Specific Training.
MAP the Way to Success in Math: A Hybridization of Tutoring and SI Support Evin Deschamps Northern Arizona University Student Learning Centers.
Module 5: Monitoring Retention and Adherence to PMTCT and Planning the Way Forward.
**INSERT YOUR TITLE HERE**
MTN-016 TRAINING Infant HIV Testing Urvi M Parikh, Ph.D. University of Pittsburgh Pittsburgh, PA USA.
Reduce Waiting & No-Shows  Increase Admissions & Continuation Reduce Waiting & No-Shows  Increase Admissions & Continuation Lessons Learned.
Office of Human Research Protection Georgia Health Sciences University.
School Development Implementation and Monitoring “Building a Learning Community”
Overview Spectrum Health Systems Lincoln St OTP Reducing administrative discharges.
Regional Dental Consultants’ Meeting Presented by Emerson Robinson, DDS, MPH Region II and V Dental Consultant.
Updated Section 31a Information LITERACY, CAREER/COLLEGE READINESS, MTSS.
Creative Ways to Engage FSET Participants The Department of Economic Opportunity.
Leaders in Networking & Knowledge (LINK) II Gay Men’s Health Crisis (GMHC) Kathleen D. Gallagher, MPH Kalyani Sanchez.
Leaders in Networking & Knowledge (LINK) II Pedro Rodriguez, Jr. Recruitment Coordinator Nina Anderson Client Navigation Specialist.
Fast-Tracking Treatment to End AIDS ICASA Ambassador Deborah Birx, MD U.S. Global AIDS Coordinator November 30, 2015.
Introduction to the Road to Quality Process using the Missouri Afterschool Program Self- Assessment.
Youth CareerConnect (YCC) Participant Tracking System (PTS) Orientation and Training: Module #4—User-Defined Fields and Data Export Presented by: Evan.
Improving Client Engagement in Primary Health Care Services Jewish Guild For The Blind.
From Aggregate Indicators to Impacting Patients - Data Use to Inform Treatment and Improve Care Ian Wanyeki Track 1.0 Implementers Meeting Dar Es Salaam.
Susan M. Wolfe, Ph.D.. The Programs, Logic Model and Performance Measures.
MGT 311 Week 5 Learning Team Reflection Discuss various strategies to managing diversity. Describe the steps that can be taken as a manager to ensure that.
CMGT 410 Week 5 Learning Team Project Evaluation and Control Check this A+ tutorial guideline at
IMPAACT 2010 Protocol Specifications for Recruitment, Screening, and Enrollment No updates.
Planning for HOPE PUEVs and Study Exit Visits
Overview of Visit Scheduling and Types of Follow-up Visits SCHARP
MTN-025 Study Specific Training
Protocol References Section Title 6.2 Entry Visit 5.1
HOPE STUDY PRODUCT TRAINING PHASE 2
Protocol References Section Title 6.2 Entry Visit 5.1
Women, Peace and Security
Participant Retention
ACASI Questionnaire Schedule - Oral
Budget Update January 15, 2019.
Presentation transcript:

Participant Retention Plans MTN-003 Study-Specific Training

MTN-003 Retention Targets  MTN-003 retention target = 95% per year

MTN-003 Retention Definitions  During the study: Retention is based on whether participants complete scheduled visits within the visit windows Retained = completed visit within the window Not retained = did not complete visit within the window Retention can fluctuate over time / across visits Retention shortfalls at a given visit can be made up at later visits by ensuring participants return after missed visits

MTN-003 Retention Definitions  At the end of the study: Retention is based on whether participants complete HIV testing at their scheduled PUEV Although every effort must be made to complete each participant’s PUEV within the visit window, PUEVs will be allowed to take place at any time through the study end date at each site Participants who complete their PUEV before the study end date, and have HIV testing at that visit, will be considered retained at the end of the study Retention for the Termination Visit is important and will also be monitored.

MTN-003 Retention Targets  MTN-003 retention target = 95% per year  Why is 95% so important?  To ensure the accuracy of the study results by minimizing bias that can be caused by missing data

One Possible Study Result # HIV infections in active product group = 38 # HIV infections in control group = 58 With these results, product effectiveness would be calculated as 35%

With Loss to Follow-Up Now imagine 40 women in the active product group and 40 women in the control group are lost to follow-up (LFUP) As a worst case scenario, also imagine: - Half (20) of the LFUP women in the active group are HIV-positive (but this is not known to the study) - All (40) of the LFUP women in the control group are HIV-negative

With Loss to Follow-Up # HIV infections in active product group = 38 # HIV infections in control group = 58 With these results “true” product effectiveness would be 0% + 20 = 58

Site-Specific Retention Plans Some Operational Considerations Reference SSP Section 8

Site Specific Retention Plans  Site-specific retention goals  Methods for tracking actual versus targeted retention  Procedures for collecting and reviewing/updating locator information  Site-specific definition of “adequate” locator information  Visit reminder methods and timeframes  Methods and timeframes for identifying missed appointments

Site Specific Retention Plans  Planned retention methods, including what outreach/locator efforts are taken within 24 hours, 1-3 days, 1 week, 2 weeks, and 3-4 weeks after a missed visit  Methods for timely evaluation of the utility of retention methods  Ethical and human subjects considerations  Staff responsibilities for all of the above  QC/QA procedures related to the above

Operational Tips and Reminders  Designate a Retention Coordinator who is responsible for tracking retention rates and managing retention efforts over time  Hold weekly meetings among staff involved in retention to discuss current and ongoing strategies  Discuss retention issues and strategies at monthly study team meetings  Engage community representatives on retention issues and strategies throughout the study

What are your questions?