Regulation Energy Management Overview CPUC Energy Storage Workshop March 9, 2011.

Slides:



Advertisements
Similar presentations
PG&Es 2009 Participating Load Pilot. 2 Overview Regulatory Context Pilot Characteristics Lessons Next Steps.
Advertisements

Briefing on California ISO Dynamic Transfers Stakeholder Process For WECC Seams Issues Subcommittee Meeting May 4, 2010 Jim Price, Lead Engineering Specialist.
Standard Market Design (SMD) in New England Federal Energy Regulation Commission Conference on Standard Market Design January 22, 2002 David LaPlante Vice.
Overview of CAISO Stakeholder Process for FERC Order 764 Compliance Implementation of 15 minute scheduling and settlement Jim Price, CAISO Presentation.
03/11/2013 MARKETS COMMITTEE Aleks Mitreski MARKET DEVELOPMENT (413) Overview of Market Rule revisions.
Amendment 3/5 Workshop.
2013 Summer Overview Jeffrey S McDonald Power System Operator CUEA San Diego, CA June 6, 2013.
NPRR 532 Performance Measurement & Verification and Telemetry Requirements for Load Resources providing Non-Spin David Kee CPS Energy Energy Supply & Market.
PJM©2014www.pjm.com Winter 2014 Overview & Recent and Upcoming Market Rule Changes Adam Keech Director, Market Operations.
Highlights of the 2004 State of the Market Report New York Electricity Markets David B. Patton, Ph.D. Potomac Economics Independent Market Advisor May.
Demand Response in New York State Northwest Power and Conservation Council DR workshop February 24, 2006.
Energy Storage Definitions/Definitions ETWG 18 Feb 2013.
1 Presentation to the Wisconsin Industrial Energy Group (WIEG) T. Graham Edwards President & CEO August 9, 2007.
Loads Acting as a Resource Relationships with QSEs and LSEs
Electricity Markets Overview Lo-Cal seminar, 09/21/2010.
North American Electricity Markets APEX Paris, France October 15-16, 2007 Kenneth Laughlin, PJM.
Demand Response in MISO Markets NASUCA Panel on DR November 12, 2012.
ERCOT Public 1 AS Demand Curves for Real-Time Co-optimization of Energy & Ancillary Services.
Ludington Pumped Storage Plant and Wind Power Operational Considerations David Lapinski Consumers Energy Company June 16, 2009.
Floyd Trefny Director of Product Development Future of Demand Response In ERCOT A Presentation to the Workshop – September 15, 2006 Project Number
PacifiCorp Participation in the California ISO. 2 Full participation provides significant benefits beyond those of the Energy Imbalance Market EIM BenefitsFull.
STORAGE OVERVIEW 2010 Steve Isser, JD, PhD Vice President & General Counsel Good Company Associates.
Sai Moorty ERCOT Integration Options into ERCOT systems.
Demand Response in Midwest ISO Markets February 17, 2008.
Overview of the North American and Canadian Markets 2008 APEX Conference in Sydney, Australia October 13, 2008 Hung-po Chao Director, Market Strategy and.
RTWG Report to TAC August 5, 2010 Howard Daniels.
ETAAC Energy Sector Energy Storage Smart Grid July 12, 2007 San Francisco, CA.
1 New England Demand Response Resources: Present Observations and Future Challenges Henry Yoshimura Demand Resources Department ISO New England, Inc. Holyoke,
Storage Integration – Look Ahead SCED Issues for ETWG CAES Perspectives Brandon Whittle ETWG Storage Workshop.
Joe Polidoro, Sr. Engineer PJM Interconnection, LLC Grid of the Future: Integrating Load Response into the Markets.
California Independent System Operator Participating Generator (PG) Certification Process CDWR Generation Resource Development Workshop 3/29/01 Kyle Hoffman.
California Independent System Operator Participating Generator (PG) Certification Process CDWR Generation Resource Development Workshop 3/15/01 Kyle Hoffman.
Demand Response Workshop September 15, Definitions are important Demand response –“Changes in electricity usage by end-use customers from their.
Lead from the front Texas Nodal 1 Texas Nodal Load Frequency Control (LFC) EDS 3 Release 6 - Handbook EDS 3 Release 6 MP Planning.
PJM©2013www.pjm.com Economic DR participation in energy market ERCOT April 14, 2014 Pete Langbein.
Reliability Demand Response Product February 25, 2011
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
Photovoltaic and Storage Integration Workshop “Operational Issues” Kenneth Ragsdale October 15, 2012 ERCOT.
Congestion Management and Ramp Rate for Delivering Ancillary Services Resmi Surendran.
IWWG Annual Conference Wind Management at MISO July 22, 2011.
PJM©2013www.pjm.com Demand Side Working Group Loads in SCED Angelo Marcino Real-Time Market Operations – PJM April 14, 2014.
Emergency Demand Response Concept Overview and Examples Presented to: ERCOT December 3, 2004 Presented by: Neenan Associates.
Hawaii Energy Storage Seminar: Utility Regulation Service
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Nodal Verifiable Costs Process WMS Meeting May 15, 2007 Ino.
ISO New England State of the Markets Report May April 2002 Robert Ethier, Ph.D. Manager, Market Monitoring and Mitigation ISO New England June 26,
Floyd Trefny, P.E. Director of Wholesale Market Design Nodal Market Tools to Manage Wind Generation January 29, 2009 Presentation to the Renewables Technology.
1. Non-Dispatchable Resources and EIS Market Carrie Simpson May 30,
Revisions to the Information Confidentiality Catalogue Presentation to the Market Operations Standing Committee April 23, 2003.
©2003 PJM North American Markets Status APEx Seoul, Korea October 29-31, 2006 Kenneth W. Laughlin.
ERCOT Public 1 Overview of ERCOT Concept Paper on Real-Time Co-optimization of Energy & Ancillary Services & Multi-Interval Real-Time Market.
Programs/Products that ERCOT Does Not Presently Offer ERCOT Demand Side Working Group New DR Product Options Subgroup Jay Zarnikau Frontier Associates.
“Managing the Integration of Energy Storage Technologies” Kenneth Ragsdale ERCOT.
DSWG Update to WMS 2/9/2011. EILS Procurement Results from 1/31 Business Hours 1 HE 0900 through 1300, Monday thru Friday except ERCOT Holidays; 425 hours.
Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8,
Ancillary Services Methodology Changes Bill Blevins Manager, Operations Planning.
1/07/2014 QMWG – RUC and AS update QMWG – ERCOT Update ERCOT Market Analysis.
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
RA workshop presentation Karl Meeusen, Ph.D. Senior Advisor – Infrastructure Policy CPUC Resource Adequacy Workshop February 18, 2016.
Future Ancillary Services Cost Benefit Analysis Overview Julia Matevosyan February 1, 2016 FAS Workshop.
Energy Storage and Distributed Energy Storage (ESDER) Initiative California Independent System Operator CAISO – CPUC Energy Storage Workshop May 3, 2016.
Multi-Use Application Use Case #3: Optimized Pricing and Resource Allocation (OPRA) Project. May 3, 2016.
Settlement of Ancillary Service Infeasibility ERCOT QMWG April 15, 2016.
CAISO Market Design Initiatives Update Donald Tretheway Senior Market Design and Policy Specialist CPUC Storage Proceeding January 14, 2013.
Shaping Up The Duck Chart Independent Energy Producers Association Annual Meeting Mark Rothleder Vice President, Market Quality and Renewable Integration.
California Independent System Operator 1 Department of Market Analysis California Independent System Operator California ISO Creation Time: July,
“Look Ahead SCED” Sai Moorty ERCOT November 28, 2011.
Wind Management at MISO
Does the Charge (kW) or the Discharge (kWh) drive the Cost
Pay for Performance Regulation
Market Pricing Issues: Update
Presentation transcript:

Regulation Energy Management Overview CPUC Energy Storage Workshop March 9, 2011

Regulation energy management provides additional functionality to address limitations of storage resources. Limited energy resources unable to participate in day- ahead regulation market at full capacity w/o REM Barriers to entry still existed even with March 2010 ancillary services modifications to support non-generation resources Slide 2 Example: 20 MW / 5 MWh limited energy resource Green – prior requirement Yellow – regulation energy management 0 MW 20 MW 15 MW 10 MW 5 MW Minutes Regulation Up Approved by ISO Board February Implementation Spring 2012

Regulation energy management maintains resources state of charge to meet continuous energy requirement Utilize real time energy market for energy offset Regulation and energy settlement similar to conventional generation Regulation dispatch and energy offset keep state of charge near midpoint Additional information at e/27beb7931d800.html Slide 3

March 2010 ancillary services modifications to support non-generation resources Removed resource type restrictions and reduce minimum rated capacity to 500 kW from 1MW Reduced minimum continuous energy requirement from 2 hours to: –Day-Ahead Regulation Up/Down: 60 minutes –Real-Time Regulation Up/Down: 30 minutes –Spin and Non-Spin: 30 minutes Minimum continuous energy measured from the period that the resource reaches the awarded energy output –Measurement starts once resource reaches awarded energy, not end of 10 minute ramp requirement Page 4 Approved by FERC September 2010