12/26/2013-1/2/2014 1 PHENIX WEEKLY PLANNING Dec. 26, 2013 -Jan. 2, 2014 Don Lynch.

Slides:



Advertisements
Similar presentations
2/13/ PHENIX WEEKLY PLANNING Feb. 13, 2014 Don Lynch.
Advertisements

10/03/ PHENIX WEEKLY PLANNING Oct. 3, 2013 Don Lynch.
4/11/20131 PHENIX WEEKLY PLANNING 4/11/2013 Don Lynch.
2/6/ PHENIX WEEKLY PLANNING Feb. 6, 2014 Don Lynch.
12/12/ PHENIX WEEKLY PLANNING Dec. 12, 2013 Don Lynch.
8/22/ PHENIX WEEKLY PLANNING Aug. 22, 2013 Don Lynch.
1/12/20121 PHENIX WEEKLY PLANNING 1/12/2012 Don Lynch.
PHENIX WEEKLY PLANNING 1/4/2007 Don Lynch. 1/4/207 Weekly Planning Meeting 2.
9/26/ PHENIX WEEKLY PLANNING Sep. 26, 2013 Don Lynch.
1/30/ PHENIX WEEKLY PLANNING Jan. 30, 2014 Don Lynch.
9/6/20121 PHENIX WEEKLY PLANNING 9/6/2012 Don Lynch.
10/31/ PHENIX WEEKLY PLANNING Oct. 31, 2013 Don Lynch Happy Halloween!
2/9/20121 PHENIX WEEKLY PLANNING 2/9/2012 Don Lynch.
10/10/ PHENIX WEEKLY PLANNING Oct. 10, 2013 Don Lynch.
1 2/12/2009 PHENIX WEEKLY PLANNING 2/12/2009 Don Lynch.
6/6/ PHENIX WEEKLY PLANNING 6/6/2013 Don Lynch Note: No PHENIX planning meeting this week due to end of run party. Feel free to discuss safety and.
1 1/13/2011 PHENIX WEEKLY PLANNING 1/13/2011 Don Lynch No Meeting Today Due to snow shortened work week, today’s planning meeting has been cancelled. Slides.
6/27/ PHENIX WEEKLY PLANNING 6/27/2013 Don Lynch.
1/5/20121 PHENIX WEEKLY PLANNING 1/5/2012 Don Lynch.
5/9/ PHENIX WEEKLY PLANNING 5/9/2013 Don Lynch.
11/7/ PHENIX WEEKLY PLANNING Nov. 7, 2013 Don Lynch.
8/9/20121 PHENIX WEEKLY PLANNING 8/9/2012 Don Lynch.
PHENIX WEEKLY PLANNING 10/05/06 Don Lynch. 10/05/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown.
10/11/20121 PHENIX WEEKLY PLANNING 10/11/12 Don Lynch.
12/5/ PHENIX WEEKLY PLANNING Dec. 5, 2013 Don Lynch.
3/14/20131 PHENIX WEEKLY PLANNING 3/14/2013 Don Lynch.
12/29/20121 PHENIX WEEKLY PLANNING 12/29/2011 Don Lynch.
11/29/20121 PHENIX WEEKLY PLANNING 11/29/12 Don Lynch.
1/9/ PHENIX WEEKLY PLANNING Jan. 9, 2014 Don Lynch.
4/10/ PHENIX WEEKLY PLANNING April 10, 2014 Don Lynch.
11/15/20121 PHENIX WEEKLY PLANNING 11/15/12 Don Lynch.
PHENIX WEEKLY PLANNING 10/11/2007 Don Lynch. 10/11/2007 Weekly Planning Meeting2 Run 8 Prep Schedule ItemStartFinish MPC South InstallationDoneDone Elec.
1 PHENIX WEEKLY PLANNING December 3, 2015 Carter Biggs.
3/6/ PHENIX WEEKLY PLANNING March 6, 2014 Don Lynch.
10/18/20121 PHENIX WEEKLY PLANNING 10/18/12 Don Lynch.
5/1/ PHENIX WEEKLY PLANNING May 1, 2014 Don Lynch.
11/8/20121 PHENIX WEEKLY PLANNING 11/8/12 Don Lynch.
PHENIX WEEKLY PLANNING 2/2/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
PHENIX WEEKLY PLANNING 11/2/06 Don Lynch. 11/2/06 Weekly Planning Meeting 2 New Detectors TOF West HBD RXNP MPC North.
1/31/20131 PHENIX WEEKLY PLANNING 1/31/2013 Don Lynch.
PHENIX WEEKLY PLANNING 2/9/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
PHENIX WEEKLY PLANNING 9/14/06 Don Lynch. 9/14/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown '065/1/200612/8/2006.
9/27/20121 PHENIX WEEKLY PLANNING 9/27/2012 Don Lynch.
1 PHENIX WEEKLY PLANNING January 21, 2016 Carter Biggs.
PHENIX WEEKLY PLANNING 10/4/2007 Don Lynch. 10/4/2007 Weekly Planning Meeting 2007 PHENIX Shutdown October 2007: Finish MPC South Installation, replace.
2/14/20131 PHENIX WEEKLY PLANNING 2/14/2013 Don Lynch.
PHENIX WEEKLY PLANNING 12/7/06 Don Lynch. 12/7/06 Weekly Planning Meeting 2.
4/24/ PHENIX WEEKLY PLANNING April 24, 2014 Don Lynch.
1 12/30/2010 PHENIX WEEKLY PLANNING 12/30/2010 Don Lynch.
5/16/ PHENIX WEEKLY PLANNING 5/16/2013 Don Lynch.
3/20/ PHENIX WEEKLY PLANNING March 20, 2014 Don Lynch.
4/17/ PHENIX WEEKLY PLANNING April 17, 2014 Don Lynch.
12/6/20121 PHENIX WEEKLY PLANNING 12/6/12 Don Lynch.
1/26/20121 PHENIX WEEKLY PLANNING 1/26/2012 Don Lynch.
6/28/20121 PHENIX WEEKLY PLANNING 6/28/2012 Don Lynch.
5/8/ PHENIX WEEKLY PLANNING May 8, 2014 Don Lynch.
5/24/20121 PHENIX WEEKLY PLANNING 5/24/2012 Don Lynch.
7/12/20121 PHENIX WEEKLY PLANNING 7/12/2012 Don Lynch.
12/19/ PHENIX WEEKLY PLANNING Dec. 19, 2013 Don Lynch.
12/20/20121 PHENIX WEEKLY PLANNING 12/20/12 Don Lynch.
PHENIX WEEKLY PLANNING 10/26/06 Don Lynch. 10/20/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown.
5/30/20131 PHENIX WEEKLY PLANNING 5/30/2013 Don Lynch.
1 1/29/2009 PHENIX WEEKLY PLANNING 1/29/2009 Don Lynch.
3/7/20131 PHENIX WEEKLY PLANNING 3/7/2013 Don Lynch.
12/08/20111 PHENIX WEEKLY PLANNING 12/08/2011 Don Lynch.
2/27/ PHENIX WEEKLY PLANNING Feb. 27, 2014 Don Lynch.
12/6/20121 PHENIX WEEKLY PLANNING 12/13/12 Don Lynch.
9/5/ PHENIX WEEKLY PLANNING Sep. 5, 2013 Don Lynch.
1 11/25/2010 PHENIX WEEKLY PLANNING 11/25/2010 Don Lynch.
2/20/ PHENIX WEEKLY PLANNING Feb. 20, 2014 Don Lynch.
Presentation transcript:

12/26/2013-1/2/ PHENIX WEEKLY PLANNING Dec. 26, Jan. 2, 2014 Don Lynch

12/26/2013-1/2/ This Week Repair and evaluate VTX leaking fitting Finish EC hookup & prep for run Begin Pink Sheets DC West broken wire repairs Christmas Eve Holiday (1/2 day) Christmas Holiday Continue sPHENIX support HCal prototype assembly EMCal prototype assembly Tilting/rotating Support Structure assembly & test Future IR evolution modeling

12/26/2013-1/2/ Next Week Finish evaluation of VTX leaking fitting VTX/FVTX electronics commissioning Finish EC hookup & prep for run Continue Pink Sheets Finish DC West broken wire repairs New Year’s Day Holiday Prepare for MMS closing Continue sPHENIX support HCal prototype assembly EMCal prototype assembly Tilting/rotating Support Structure assembly & test Future IR evolution modeling

12/26/2013-1/2/2014 DC East & West Repairs Summary of Tasks DC West broken wire removal – In Progress 4

Mechanical installation complete Services connected Rack assembly & FEM assembly in progress MPC-Ex Initial (Partial) Installation 12/26/2013-1/2/2014 5

6 Light Collection for HCal sPHENIX

12/26/2013-1/2/ Light Collection for Hcal Fiber Cutting Tool

12/26/2013-1/2/ Hcal Light-Tight Enclosure

12/26/2013-1/2/ EMCal Ready for Prime Time

12/26/2013-1/2/ EMCal Support

12/26/2013-1/2/

12/26/2013-1/2/ sPHENIX Modeling support for updated MIE sPHENIX

12/26/2013-1/2/ ePHENIX Plan View Elevation View

12/26/2013-1/2/ GMH Tasks: Also need to complete Analyzer piping

12/26/2013-1/2/ Remaining 2013 Shutdown Schedule sPHENIX HCal & EMCal Prototype Assembly/test8/19-1/20/2014 VTX/FVTX Bias, LV and signal Cabling and Cooling distributionDone ? MPC-Ex LV, Bias and signal cabling and cooling distributionDone MPC-Ex installed acceptance tests Done Remove and stow station 1 south scaffoldingDone Pre-run commissioning and detector prep testing for run 1412/9-1/31/2014 Prep for EC roll in(remove fibers, cooling water and gas)Done Remove manlifts from IRDone Remove deck plates from IRDone Move MuID Collars into IR hold positionDone Remove 12 ton cart from IRDone Roll in EC to run positionDone Re-connect gas sniffers, water, elect., gas, fibers to ECIn Progress Fold down EC platforms & reinstall dumb waiter (carpenters)12/20-1/2/2014 Reconnect EC dumbwaiter lift wiring and TOF blowers12/26-1/2/2014 Move MMS to run position1/6/2014 Install the MuID collars1/7/2014 DC West wire repairs12/15-12/30/2013 Restore all PHENIX Elec. from shutdown safe modes to operating modes12/23-1/2/2014 Christmas Holiday Done New Year’s Day Holiday1/1/2014 Pink sheets1/6-1/7/2014 White Sheets1/2-1/8/2014 Assemble large shielding wall and install plug door (riggers)1/6-1/17/2014 Blue Sheets1/6-1/17/2014 Start Watch Shifts1/7/2014 Start Flammable gas flow1/13/2014 End of Shutdown Party1/10/2014 Close shield wall, install radiation interlocks and prepare for run 141/31/2014 Start run 142/3/2014

12/26/2013-1/2/ Safety and Security PHENIX Annual Safety Review: Action Items Provide a procedure to test the window washer interlocks (Lynch Jan 15, 2014) Add (load limit) weight postings on the new gratings covering the cables adjacent to the sill (Lynch Jan 15, 2014) Complete the platform gates installation (Phillips Jan 15, 2014) Provide the new flammable gases leak rates (Pisani, Jan 10, 2014) Provide the updated gas usage quantities (Pisani Jan 10, 2014) Add a caution sign not to overfill the NOVEC bottles (Pisani Jan 10, 2014) Carry out the Blue Sheeting (CAS, Phillips Feb 1, 2013) Document the new ethane installation and leak and pressure testing (Biggs Jan 15, 2014) Provide updated sweep procedures (Sampson Jan 15, 2014) Carry out an inspection of the installed platform gates (Cirnigliaro Feb 1, 2014) General: Update the PHENIX ECR. (Craner, Jan 15, 2014) Update the PHENIX work plan if necessary (Cirnigliaro Jan 15, 2014) Carry out a magnetic safety review (Phillips Jan 10, 2014) A walk through of the PHENIX detector prior to introduction of flammable gas. (Makdisi et al Jan 10, 2014) Update the documented work procedures. (Lynch Continuing from last year) Establish trained PHENIX watch shifts. (O’Brien Jan 10, 2014)

12/26/2013-1/2/ Safety and Security

12/26/2013-1/2/

12/26/2013-1/2/ Where To Find PHENIX Engineering Info Happy New Year !! Good Luck to PHENIX and sPHENIX in 2014 !