Operations, Test facilities, CF&S Tom Himel SLAC.

Slides:



Advertisements
Similar presentations
September 28, 2006-Cornell (Zisman/Mattison) Global Design Effort 1 DR Kicker R&D: Goals and Work Scope Michael S. Zisman and Tom Mattison.
Advertisements

Wednesday July 19 GDE Plenary Global Design Effort 1 Instrumentation Technical System Review Marc Ross.
Issues in ILC Main Linac and Bunch Compressor from Beam dynamics N. Solyak, A. Latina, K.Kubo.
Nov. 19, 2008 ILC08 Global Design Effort 1 Status Report Alternative Siting and Tunnel Design Tom Lackowski.
Nick Walker KEK-DESY meeting 7 th March 2005.
Tom Himel Linac Controls Upgrade Nov SLAC National Accelerator Laboratory 1 Linac Controls Upgrade Status Tom Himel.
June 15, 2005Marc Ross (ILC) – Instrumentation Development ILC Instrumentation Development Marc Ross, SLAC.
Dayle Kotturi SLC April 29, 2004 Outline Motivation Key Components Status Update SLC / EPICS Timing Software Tasks Hardware.
SLAC ILC Accelerator: Luminosity Production Peter Tenenbaum HEP Program Review June 15, 2005.
Stripline Kicker Project LBL LLNL SLAC KEK DESY. Damping Ring Injection / Extraction Kicker Magnet 1)The TDR Kicker: 1)0.6 mrad (.01Tm), 5GeV, 50 m β,
Global Design Effort BDS KOM Opening remarks/comments from EDR Project Management SLAC Marc Ross / Nick Walker.
Accelerator R&D on LC - Activities of ATF & STF - 1. Introduction 2. ATF 3. STF 4. Summary Seiya Yamaguchi, KEK The US/Japan Collaboration in High Energy.
Summary of AWG4: Beam Dynamics A. Latina (CERN), N. Solyak (FNAL) LCWS13 – Nov 11-15, 2013 – The University of Tokyo, Japan.
8/28/07RTML EDR KOM1 Cornell Plans for RTML EDR Work G. Dugan Cornell LEPP.
Global Design Effort Americas Region Efforts and Resources Mike Harrison GDE.
Controls & LLRF ILC Controls Telecon September 20, 2006 John Carwardine 1.Reports from ESRF Meetings 2.Misc. Items 3.Participant “Radar” Items.
RDR Report Writing Nan Phinney SLAC for RDR team of editors.
1 Albrecht Wagner DESY and the ILC DESY today DESY strategy and funding DESY and the ILC Funding from the European Union KEK/DESY Collaboration.
Cryomodule Design and R&D during the EDR phase Robert Kephart With input from the T4 CM Collaboration.
RDR Report Writing Nan Phinney SLAC. 7/20/06 VLCW06 Global Design Effort 2 GLC Report Working model is the 2003 GLC Report ch 4-7
Date Event Global Design Effort 1 ILC UPDATE Vancouver to Valencia Ewan Paterson Personal Report to SiD Collaboration Oct 27, 2006.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
Global Design Effort 1 Possible Minimum Machine Studies of Central Region for 2009 Reference, ILC Minimum Machine Study Proposal V1, January 2009 ILC-EDMS.
CesrTA Experimental Plan M. Palmer for the CesrTA Collaboration November 17, 2008.
1 Global Design Effort Beijing GDE Meeting, February 2007 Controls for Linac Parallel Session 2/6/07 John Carwardine ANL.
1 Availability and Controls Tom Himel SLAC Controls GG meeting January 20, 2006.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
8 th Meeting of the ATF TB/SGC 11 June Hardware Status Fast Kicker – FID pulsers have had a reliability problem: this appears to have been solved.
BDS Andrei Seryi, Deepa Angal-Kalinin, Emmannual Tsesmelis, Rogelio Tomas, Andrea Latina, Daniel Schulte Detectors Civil engineering.
July 16-17, 2007 Joint NSF/DOE Review of CesrTA Proposal 1 * Mitigation techniques planning still underway with ILC DR group Answer to Questions 1 and.
Nick Walker – SA meeting KEK Treaty Points and Costing Guidance Nick Walker 1 st System Area Managers Meeting KEK –
Global design effort DOE meeting 8/10/06 Global design effort Americas 1 FY07 DOE ILC Budget recommendations G. Dugan ILC-GDE/Cornell University GDE Americas.
Greeting for 10 th ATF2 project and TB/SGC joint meeting 1.
Meeting of the European Global Design Effort Report from INFN non EU-funded R&D Carlo Pagani University of Milano and INFN DESY, 10 May 2006.
June 13, 2007 Global Design Effort 1 ILC Effort at SLAC RDR > EDR Nan Phinney SLAC/GDE.
1 Global Design Effort: Control System Vancouver GDE Meeting, July 2006 Controls Global System Review John Carwardine, ANL (For Controls Global Group Team)
The recent history and current state of the linac control system Tom Himel Dec 1,
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
GG3 Operations & Reliability (Availability) Eckhard Elsen Tom Himel
Stanford Linear Accelerator Center Ron Chestnut EPICS Collaboration Mtg May 21-23, SLAC EPICS Projects Yesteryear, Today, and Tomorrow.
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
13 September 2006 Global Design Effort 1 ML (x.7) Goals and Scope of Work to end FY09 Nikolay Solyak Fermilab Peter Tenenbaum SLAC.
1 The ILC Control Work Packages. ILC Control System Work Packages GDE Oct Who We Are Collaboration loosely formed at Snowmass which included SLAC,
Low Emittance Generation and Preservation K. Yokoya, D. Schulte.
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
General remarks: I am impressed with the quantity and quality of the work presented here and the functioning of the organization. I thank ILC and FNAL.
Welcome and the ATF2 international collaboration in future 1.Introduction 2.Mission of ATF/ATF2 3.Organization of ATF/ATF2 4.International Collaboration.
ATF status M. Ross October 15, 2004 The ATF is the largest test facility built exclusively for linear collider RD –Utility not reduced by the selection.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
Accelerator Activities at Spain Madrid CIEMA T CMAM Valencia IFIC Bilbao ESS Barcelona ALBA UPC Sevilla CNA 1 PAC-ILC May 2010.
1 Experiments with pulse supplies and strip-lines at ATF, Plans for fast extraction kicker for ATF2 1. Fast Kicker R&D at ATF 2. Instrumentation at ATF.
January 9, 2006 Margaret Votava 1 ILC – NI/FNAL/ANL Brief overview of Global Design Effort (GDE) plans, dates, and organization: –Changes since Industrial.
Instrumentation at ATF / TTF Accelerator Test Facility (KEK) Tesla Test Facility – FLASH (DESY) ESA / LCLS (SLAC) Marc Ross, SLAC.
1 What’s Happening on the ILC Controls Front at FNAL Margaret Votava Fermilab January 9th, 2006.
Collaborations on Beam Instrumentation R&D – A personal view – Manfred Wendt Fermilab 11/21/2008Project X Instrumentation WG1.
1 R&D Plans for Impedance Driven Single-Bunch Instabilities (WBS 2.2.1) M. Venturini ( presented by M. Zisman) LBNL LCWS07 DESY, Hamburg May 30 - June.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
V.Shiltsev 1 Comments on What Kind of Test Facility(ies) the ILC Needs Vladimir Shiltsev/ Fermilab.
ILC R&D Activities at KEK Superconducting Linac Development Beam-handling Technology Development.
3/10/2006Marc Ross - SLAC1 RDR Instrumentation – Bangalore ILC-GDE meeting, 3/10/2006 Development and specification process Operations and Beam Dynamics.
ILC Beam Instrumentation – Introduction Remarks –
DR Kicker R&D: Goals and Work Scope
ILC-Americas Regional Team Review
The ILC Control Work Packages
BPM development at ATF/CLIC
Oversea collaborators
Fast Kicker R&D in the Americas Region
Junji Urakawa (KEK) for ATF International Collaboration
ATF project meeting, Feb KEK, Junji Urakawa Contents :
Reliability, MPS, Operations and Tuning Work Packages
Presentation transcript:

Operations, Test facilities, CF&S Tom Himel SLAC

Tom Himel 2 Outline Operations Global oversight Controls High Availability Projects Test Facilities contributions / diagnostics R&D operation CF&S and installation

Tom Himel 3 Some Common Themes Virtually all the projects are being done in collaboration with other institutions – foreign and domestic. Virtually all are continuations of ongoing work Details are in writeups for cases where I neglect to explicitly mention it here.

Operations: Global oversight WBS FTE + 0k M&S Oversee operations, commissioning and reliability issues as part of the RDR global system. Needed because ILC will be the most complex machine ever built and we want it to work. Push all ILC designers to pay attention to these issues and evaluate various tradeoffs for them Availability simulation and experience are the major tools. Ties in well with many HA projects being done at SLAC Lead by an incredibly brilliant, energetic, charismatic, modest person with SLC and PEP-II experience. Me

Tom Himel 5 Operations: Controls WBS FTE Controls and feedbacks have a major impact on operations. Reliability concerns need to be addressed early on. Includes Designing the control system well enough to cost it Selecting the proper framework (EPICS, DOOCS, … new) Develop remote operations capability All in collaboration with ANL, FNAL, DESY, KEK

Tom Himel 6 Operations: High Availability WBS – k These projects address some, but not all, of the items identified by the availability simulation as needing significant improvements. HA work needs an early start not only because of the design challenge, but because significant time is needed to test that the goals were achieved and no failure modes overlooked. Use of HA designs in real accelerators and test facilities needs to be promoted as a test vehicle.

Tom Himel 7 Operations: High Availability Includes: High availability power supplies (may be tested at ATF2). Centered on small modification of a commercial unit. HA kicker pulsers (also fast enough for short bunch spacing in DR) Imbedded diagnostic processor (allows remote diagnosis of power supply problems possibly before they cause an actual failure) Develop stable HA RF phase distribution system (Stable is the harder part of this one.) Perform a FMEA analysis of control system and investigate HA solutions for hardware and software. Prototype some instrumentation modules in ATCA

Tom Himel 8 Test Facilities: contributions/diagnostics R&D WBS – k Includes work to contribute components (mostly diagnostics) to ATF, ATF2, TTF and ESA. Triple purpose served Work often extends state-of-the-art so it is R&D in its own right Contributes to an important test facility that has other integrated goals. Fosters international collaboration and trust.

Tom Himel 9 Test Facilities: contributions/diagnostics R&D Projects include ATF ring BPM electronics (prototype shows factor of 10 improvement in resolution) Design and fabrication of ATF2 magnets ATF2 bunch length monitor TTF HOM BPM readout Past US contributions at DESY and KEK are often mentioned appreciatively. Builds trust and eases future collaboration.

Tom Himel 10 Test Facilities: Operations WBS FTE + 60k M&S Beam time available for ILC R&D at TTF and ATF goes to waste due to lack of proposals and people to run experiments. These very expensive test facilities are not being fully utilized. May be opportunities at other accelerators like SNS. A task force would match needed R&D with opportunities at existing accelerators and expedite their execution (doing real work) Helps train students Fosters international trust and collaboration

Tom Himel 11 CF&S and Installation WBS – SLAC has the sole person coordinating installation effort of RDR. This work will expand with use of commercial software and a consultant to model and schedule the installation effort. Close coordination of CF&S with e- source, e+ source, RTML, and BDS is done by SLAC people This needs to continue into the TDR phase.

Tom Himel 12 Two construction philosophies A: conservatively design everything B: build everything cheaply and replace things that don’t work Better do ILC with A as the long delays to make a poorly design machine work will not be acceptable on a project that size.

Tom Himel 13 SLAC experience Original linac: A SPEAR: B PEP-I: A SLC: B PEP-II:A LCLS: B? ILC:Alternation  A Timing is right for SLAC to work on ILC. SLAC has an incredible LC experience base. Many people have over 20 years of LC experience.