Doc.: 00-03-0029-04-0000 802_Handoff_EC_Closing_Report Submission July. 2003 David Johnston, IntelSlide 1 802 Handoff ECSG EC Closing Report David Johnston.

Slides:



Advertisements
Similar presentations
1 IEEE Media Independent Handoff Overview of services and scenarios for 3GPP2 Stefano M. Faccin Liaison officer to 3GPP2.
Advertisements

Doc.: Handoff_WNG_Presentation r3 Submission July David Johnston, IntelSlide Handoff Presentation to WNG David Johnston.
Doc.: 802_Handoff_EC_Opening_Plenary_Report r2 Submission November David Johnston, IntelSlide Handoff ECSG EC Opening Plenary Report David.
Doc.: IEEE /xxxr0 Submission May 2004 Stephen McCann, Siemens Roke ManorSlide 1 IEEE Wireless Interworking with External Networks (WIEN)
Doc.: IEEE /533r0 Submission July 2003 Clint Chaplin, Symbol TechnologiesSlide 1 Proposal for Fast Roam Fast Handoff Study Group Clint Chaplin,
Doc.: IEEE /533r3 Submission July 2003 Clint Chaplin, Symbol TechnologiesSlide 1 Proposal for Fast Roam Fast Handoff Study Group Clint Chaplin,
Doc.: _IETF_DNA_r1 Submission March David Johnston, IntelSlide L2 Services for Handover Optimization David Johnston
xx IEEE MEDIA INDEPENDENT HANDOVER DCN: Title: Proposed Presentation for 3GPP Date Submitted: July,
Doc.: _IETF_DNA_r1 Submission March David Johnston, IntelSlide L2 Services for Handover Optimization David Johnston
DCN: March 7, 2005 IETF 62 - Minneapolis, MN Media Independent Handover Services and Interoperability Ajay Rajkumar Chair, IEEE
Doc.: 802_Handoff_Linksec_Presentation Submission May David Johnston, IntelSlide Handoff LinkSec Handoff Issues? David Johnston
IEEE SCC41 PARs Dr. Rashid A. Saeed. 2 SCC41 Standards Project Acceptance Criteria 1. Broad market application  Each SCC41 (P1900 series) standard shall.
IEEE P802 Handoff ECSG Submission May 2003 Paul Lin, Intel Corp Proposed Problem and Scope Statements for Handoff ECSG Huai-An (Paul) Lin Intel Corp. May.
Doc.: IEEE /0498r0 Submission April 2008 Eldad Perahia, Intel CorporationSlide 1 Modifications to the 60GHz PAR & 5 C’s Proposal Date:
Doc.: 802_Handoff_Joint_Handoff_16e_Session Submission July David Johnston, IntelSlide Handoff ECSG Overview for Joint 16e/Handoff David Johnston.
Doc.: 802_Handoff_WMAN_Presentation Submission July David Johnston, IntelSlide Handoff A Technical Preview David Johnston
Doc.: 802_Handoff_SEC_Closing_Report Submission July David Johnston, IntelSlide Handoff ECSG SEC Closing Report David Johnston
Doc.: 802_Handoff_Architecture_Elements_r2 Submission May David Johnston, IntelSlide 1 Architectural Elements of an 802 Handoff Solution David Johnston.
IEEE MEDIA INDEPENDENT HANDOVER DCN: mugm Title: Group Management TG Opening Note Date Submitted: September 18, 2012 Presented at.
Doc.: IEEE /0748r2 Submission May 2011 Tom Siep, CSRSlide 1 Process for Creating TGai Draft Date: Authors:
Doc.: 802_Handoff_Opening_Notes_r1 Submission November David Johnston, IntelSlide 1 IEEE 802 Handoff ECSG Chair’s Introduction David Johnston
Doc.: IEEE 11-04/0319r0 Submission March 2004 W. Steven Conner, Intel Corporation Slide 1 Architectural Considerations and Requirements for ESS.
Doc.: L2_Triggers_dj_r1 Submission January David Johnston, IntelSlide 1 IEEE 802 Handoff ECSG L2 Triggers David Johnston
ABSTRACT: This contribution proposes the HRPD-WiMAX handoff solution. TITLE: HRPD-WiMAX Handoff TSG-A WG4 RECOMMENDATION: Review and Adopt Samsung Electronics.
Doc.: 802_Handoff_Work_Package_Discussion_r1 Submission September David Johnston, IntelSlide 1 IEEE 802 Handoff ECSG Work Package Discussion David.
IEEE MEDIA INDEPENDENT HANDOVER DCN: Title: Proposed Presentation for 3GPP Date Submitted: September,
Doc.: Submission July 2010 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 1 P802.11v report to EC on request for conditional approval to proceed.
Doc.: IEEE /0356r0 Submission March 2009 Jon Rosdahl, CSRSlide 1 New WG PARs that WG11 must consider in March 2009 Date: Authors:
sec1 IEEE MEDIA INDEPENDENT HANDOVER DCN: Single_Radio_HO_Response_Comments Title: Response for comments on proposed.
Doc.: IEEE /0085r1 Submission June 2010 Tuncer Baykas, NICTSlide TG1 and System Design Document Notice: This document has been prepared.
Doc.: Submission, Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [SG ULI Report for Jan 2016.
Fall ‘99 Simulation Interoperability Workshop RTI Interoperability Study Group Final Report Michael D. Myjak, Chair.
Trend of Mobility Management Yen-Wen Chen Ref: 1.Draft IEEE Standard for Local and Metropolitan Area Networks: Media Independent Handover Services 2.Transport.
Doc.: 802_Handoff_Linksec_Presentation Submission May David Johnston, IntelSlide Handoff LinkSec Handoff Issues? David Johnston
Response to Official Comments
IEEE 802 Handoff ECSG Chair’s Introduction
Summary of WG activities
IEEE MEDIA INDEPENDENT HANDOVER
TG1 Introduction and Status
Stephen McCann, Siemens Roke Manor
November 2008 doc.: IEEE /1437r1 July 2010
WCSC-2016 Annual Subgroup Review
<month year> <September 2018>
<month year> <May 2018>
IEEE MEDIA INDEPENDENT HANDOVER DCN: sec
802 Handoff ECSG Closing Plenary Report
<month year> Denver, March 2006
November 2011 WG11 Motions for the EC
<month year> <July 2018>
IEEE MEDIA INDEPENDENT HANDOVER DCN:
November 2010 doc.: IEEE /0800r9 November 2010
IEEE MEDIA INDEPENDENT HANDOVER DCN:
IEEE MEDIA INDEPENDENT HANDOVER DCN:
November 2008 doc.: IEEE /1437r1 November 2010
TG1 and System Design Document
Proposed Modifications to VHT60 PAR
IEEE MEDIA INDEPENDENT HANDOVER DCN: sec
March Liaison Report Date: Authors: March 2010
IEEE 802 2nd Vice Chair last name at ieee dot org
IEEE MEDIA INDEPENDENT HANDOVER DCN: sec
IEEE MEDIA INDEPENDENT HANDOVER DCN:
IEEE P vs IEEE Date: Authors:
IEEE MEDIA INDEPENDENT HANDOVER DCN:
802 Handoff ECSG Nov-03 Opening Plenary Report
Submission Title: TG9ma Opening Report for July Meeting
Response to Official Comments
<month year> doc.: IEEE < e> <Mar 2018>
Submission Title: TG9ma Closing Report for July Meeting
Submission Title: TG9ma Opening Report for September Meeting
Submission Title: TG9ma Opening Report for September Meeting
Presentation transcript:

doc.: _Handoff_EC_Closing_Report Submission July David Johnston, IntelSlide Handoff ECSG EC Closing Report David Johnston

doc.: _Handoff_EC_Closing_Report Submission July David Johnston, IntelSlide 2 Officers Chair –David Johnston (Intel) Recording Secretary –Paul Lin (Intel), resigned as recording secretary –Michael G. Williams (Nokia) was elected unanimously as recording secretary Vice Chair –Ajay Rajkumar (Lucent) was elected unanimously as vice chair

doc.: _Handoff_EC_Closing_Report Submission July David Johnston, IntelSlide 3 Activities this session Considered issues surrounding deficiencies with Mobile IP DNA, exacerbated by 802 shortcomings –2 technical submissions (Microsoft) Problem statements Considered working titles PAR text Placement

doc.: _Handoff_EC_Closing_Report Submission July David Johnston, IntelSlide 4 Problem Statements Three problem statements approved as findings of the group –#1 Detection of a useable attachment to a network is impacted by the ambiguous indicators of network attachment in certain 802 MACs. Thus there is a need to develop a standard that allows a mobile terminal to optimize detection of a useable attachment to a network above the LLC. –#2 The information necessary to make effective handoff decisions is lacking in part because the 802 networks provide insufficient information to the upper layers. Thus there is a need to develop a standard that permits information exchange between mobile terminals and/or networks to enable mobile terminals and/or networks to make more effective handoff decisions. –#3 There is no standardized mechanism in 802 for information exchange between mobile terminals and network attachment points. This impacts the ability to make informed decisions to select between disparate network attachment points or to initiate handoffs between heterogeneous network types or between administrative domains within a single network type. Thus there is a need to develop a standard that permits mobile terminals and network attachment points to access information on which to base effective handoff decisions.

doc.: _Handoff_EC_Closing_Report Submission July David Johnston, IntelSlide 5 Draft Scope For the purposes of converging towards a consensus on purpose and scope, the group approved the following text as a working copy of the scope for discussion prior to the September interim “The scope of this project is to develop a standard that shall define mechanisms that may be adopted into implementations so that handoff of handoff-capable upper layer entities, e.g. MobileIP sessions, can be optimized between homogeneous or heterogeneous media types both wired and wireless, where handoff is not otherwise defined. Consideration will be made to ensure compatibility with the 802 architectural model. Consideration will be made to ensure that compatibility is maintained with 802 security mechanisms including 802.1x. Neither security algorithms nor security protocols shall be defined in the specification.”

doc.: _Handoff_EC_Closing_Report Submission July David Johnston, IntelSlide 6 Draft Purpose For the purposes of converging towards a consensus on purpose and scope, the group approved the following text as a working copy of the purpose for discussion prior to the September interim “The purpose of the project is to a) facilitate the optimization of handoff between networks that may be of different media types both wired and wireless, where 802 level handoff is not otherwise defined b) to make it possible for mobile devices to perform seamless handoff where the network environment supports it. This will improve the user experience of mobile devices by improving the available network coverage through the support of multiple media types and preventing the interruption of upper layer sessions during handoff.”

doc.: _Handoff_EC_Closing_Report Submission July David Johnston, IntelSlide 7 Placement The group unanimously approved recommending placing the work as a new working group –Co-location issues –No overlap between membership and the ECSG attendees

doc.: _Handoff_EC_Closing_Report Submission July David Johnston, IntelSlide 8 Title ‘802 Handoff’ considered an inadequate title for the work of the group Focus is on L2 optimization of a L3 handoff activity No title agreed, several proffered, some cheesy Will resolve before September interim

doc.: _Handoff_EC_Closing_Report Submission July David Johnston, IntelSlide 9 Feasibility Feasible solutions identified that serve to establish the feasibility of continuing with technical work: –Layer 2 Triggers, semantics and interface Meets needs of mobile IP handoffs but are generally applicable –Handoff decision data Data accessible to mobile stations to enable good and timely handoff decisions –May include authentication services required, QoS capabilities, upper layer services present, neighbor AP information, vendor proprietary etc. –Needs structure and interface –Possibly base air/wire conduit for this information on the 802.1x controlled/uncontrolled port mechanism –Network model Includes mobile terminal/fixed net and mobile net/fixed terminal

doc.: _Handoff_EC_Closing_Report Submission July David Johnston, IntelSlide 10 Targets Develop and review full PAR submission documentation before next interim Approve final text for PAR & 5C text by end of September Interim Submit PAR & Coverletters, Recommendations etc. shortly after September interim Develop overview document of the work done to date and the current technical thinking within the group for the purpose of exposing the work of the group to a wider audience (DJ)

doc.: _Handoff_EC_Closing_Report Submission July David Johnston, IntelSlide 11 Continuation High expectation that we will be done at the next interim –With more meeting time this session we possibly could have been done now –We intend to achieve consensus through reflector discussions and approve at the September interim Request: Move that the Executive Committee approve that the 802 Handoff ECSG continue its work for one additional plenary cycle