STEP 1: Identify and Research A Need STEP 3: Make A Prototype STEP 2: Develop Possible Solutions STEP 4: Test and Evaluate STEP 5: Modify and Retest Bell.

Slides:



Advertisements
Similar presentations
HIS Parent Academy
Advertisements

Jack Batson. Basic Information Name: Iron Man Alter-Ego: Tony Stark (although he does not keep his identity secret) Powers: He is a genius, and has a.
Jump, Don’t Bump! Bungee Jumping. Bell Ringer Adventures, Inc. has hired your student engineering team to design a thrilling event for their new amusement.
Agenda Week 3 9/10 – 9/14 By PresenterMedia.comPresenterMedia.com.
EXAMPLE 1 Counting Permutations Music You have five CDs. You can use the counting principle to count the number of permutations of 5 CDs. This is the number.
SPI 0807.T/E.1 Prototype Testing
Iron Man By Kurt Steidl. What caused him to be a super hero? Stark suffered a severe chest injury during a kidnapping in which his captors attempt to.
Bell Work: 3/12/15 O Sketch a cross- section of a battery. While watching this video: Get with your team and compare drawings.
What is it and how does it affective your life?
(1) (3) (2) (4) (5) Steps 4 and 5 are the steps of the EDP where we test our prototypes 1 SPI 0807.T.E.1 to 2: (Eng. Des. Process) SPI 0807.Inq.2 (Sci.
Instructions 1) Go to work station one, and pick up a copy of the quiz study guide. 2) Write your first and last name in the top/right corner. 3) Beneath.
May 4, 2015  Remember: Step 1 of the EDP is to identify a need. 1) What was the need for rocket technology? Why not use jet airplanes instead? 2) What.
Bell Work Take out a sheet of paper (1) In 2 to 3 sentences write a brief description of what you intend to build out of duct tape as your prototype. (2)
8 th Grade Science Overview and Class Procedures Bell Work Aug 12, 2015 Are you READY TO LEARN? Do you have paper, pencil, textbook, and agenda? Bellwork:
8 th Grade Science Overview and Class Procedures Notes 1) Complete and discuss bell work (class procedures) Aug 10, 2015 Plan for Today 2) Collect locker.
Bell Work First go to work station one, and borrow a textbook  Imagine that you were hired by a company to design and build a prototype of new toy or.
Bell Work What to have out on your desk: 1.Agenda 2.12/19 Bell Work (5 points) Today’s Bell Work is on the handout you picked up on your way into class.
Bellwork Sept 16, An sporting company designs, builds, and sells whistles to be used by referees and coaches. This company wants to redesign their.
(Step 5A) Use/Sell the product (Step 2A) Pick the best design (Step 1A) Do research about this technology STEP 1: Identify and Research A Need STEP 3:
Bellwork Sept 17, Go over to Lab table one. Pick up a test. 2. Now go over to Lab table 2. Look at the sheet and find your clicker number. Find.
Bell Work Date SPI Density 1) The volume of a cylinder is 20 cm 3, and the mass is 2 grams. Answer these two questions. Do not use a calculator.
Bell Work Nov 13, 2013 SPI 0807.T/E.3 Intended & Unintended Consequences  First go get your clickers  Write your heading on a sheet of paper, & answer.
SPI 0807.Inq.1 (Variables and Controls) Bellwork 8/25/ Find the perimeter of an object that has sides 8cm, 13cm, 8cm, and 13cm. 2. Find the density.
Focus: What does a good study environment look like?
Welcome to our first Fifth Grade Community Partner Project.
Bell Work Sept 1, 2015 SPI 0807.Inq.1 (Variables and Controls) 1.Three red trees are kept at different humidity levels inside a greenhouse for 12 weeks.
STEP 1: Identify and Research A Need STEP 3: Make A Prototype STEP 2: Develop Possible Solutions STEP 4: Test and Evaluate STEP 5: Modify and Retest Bell.
Unit 1, Day 6. Project  Title: Too Fly for Junior High  Unit: #1 – Scientific Skills  Driving Question: How can we, as scientists, use the scientific.
May 16, 2013 Man and Machine (Humans and Robots) Bell Work SPI 0807.T/E.2 Eng Design Process SPI 0807.T/E.3 Unintended Consequences (1) Describe 2 ways.
Bellwork Sept 15, 2015 SPI 0807.Inq.5: Bias and Error 1. Which part of the experiment is most likely the source of error in this investigation? 2.The student.
8 th Grade Science Overview (Topics and Resources) Notes 1) Complete and discuss bell work (class procedures) Aug 11, 2015 Plan for Today 2) Collect locker.
By: Yohana Cantua & Fernando Ontiveros Materials one book cover or large piece of smooth paper one book with a hard, glossy cover one book with a rough.
1) Copy down the name of this new objectives (see top/middle above) 2) Then copy down the essential learning statement and the essential question (see.
1 Science Starter Military Robots Video Instructions: On your paper describe these robots. Then describe the various tools that are being used to test.
Bell Work Aug 19, 2015 SPI 0807.Inq.2 (Tools and Procedures) 1.Calculate the Area if the Length is 2cm and Width 5cm. 2.Calculate the Volume if the Length.
Bellwork Jan 17, )Turn to page 433 in your book. Then Look at the diagram above. What are the two components shown in the diagram (p433: last para)
Chapter 7 SPI Reactants & Products SPI Law of Conservation of Mass Bellwork Dec 5,  Turn to page 340, and read the 3 rd paragraph.
Bell Work Instructions A) First go get your clicker B) Next put away all books, agendas, notebooks, & study guides C) Then take out a clean sheet of paper.
The Marble Run Norwood Elementary Science Title- The Marble Run Purpose- What is a Prototype? Build an improvement.
Tennessee SPI Objective: Identify the tools and procedures needed to test the design features of a prototype. Notes Science Essential Learning Students.
STEP 1: Identify and Research A Need STEP 3: Make A Prototype STEP 2: Develop Possible Solutions STEP 4: Test and Evaluate STEP 5: Modify and Retest Bell.
Tennessee SPI Objective: Instructions for Students
Engineering Design Process Objective: I will be able to describe the steps engineering design process as well as what a prototype is. Teacherspayteachers.com.
 On your paper, fill in the blanks concerning the 5 steps of the Engineering Design Process as shown below. (see p Step 1: Identify a ________________.
Tennessee SPI Objective: Evaluate a protocol to determine if the engineering design process was successfully applied. Notes Science Check for Understanding.
Instructions Bell Work NOTE: You will not need a bell work paper today. 1)Go ahead and do this… ….If you sit on the right side of the room, go to work.
8 th Grade Science Overview and Class Procedures Bell Work Go Get Your Clicker & a Small Dry Erase Board Sep 8, ) If you sit on the right side of.
 Take out a clean sheet of paper.  Write your complete heading in the top/right corner (First/Last name, Date, Class Period)  Go get a copy of the classification.
Engineering Design Process Objective: I will be able to describe the steps engineering design process as well as what a prototype is. Teacherspayteachers.com.
Bell Work Aug 18, 2015 SPI 0807.Inq.2 (Tools and Procedures) Write the word that matches the definition. 1.Amount of matter 2.Amount of space an object.
Bell Work Oct 18, 2013 SPI 0807.T/E.3 Intended & Unintended Consequences Intended and Unintended Consequences:  First go get your clickers  Then write.
TECHNOLOGY What is it and how does it affective your life?
Engineering Design Process. First, let’s review the “Scientific Method” 1.Ask a question 2.Research 3.Procedure/Method 4.Data Observation 5.Conclusion.
Tennessee SPI Objective: Check for Understanding
Notes Science Tennessee SPI Objective: Essential Question(s)
What is it and how does it affective your life?
“Day C” Friday, January 29, 2016 Day B LUNCH (2nd Lunch) 7:57 - 8:45
Tennessee SPI Objective: Check for Understanding
Engineering Design Process
RACE CARS (Compressed Air Cars)
Tennessee SPI Objective: Check for Understanding
Learning How to Measure
Bellwork February 1-5.
Walk-In Take out notebook, folder, agenda and pencil box.
WHS: American Lit. & Comp.
Engineers develop a new type of hybrid car that can run on gasoline, ethanol, or electricity supplied by solar panels on the car’s roof. They have made.
An engineer is testing a prototype and discovers a flaw in the design of the product. What should the next step in the design process be? Bell work
Engineers are working to develop new streetlights that can be powered using energy from the sun. The lights will cost more to purchase than existing lights,
“Day A” February 11, :51 - 8:51 Math 8:53 - 9:53 Science
Notes Science Tennessee SPI Objective: Essential Question(s)
Presentation transcript:

STEP 1: Identify and Research A Need STEP 3: Make A Prototype STEP 2: Develop Possible Solutions STEP 4: Test and Evaluate STEP 5: Modify and Retest Bell Work SPI 0807.T/E.1 to 2 Engineering Design Process Sep 17, ) A game company is working on a new computer game. Their programmers are now writing the software. What engineering design process (EDP) step is this? 2) After the software is written, they will hire gamers to play it looking for errors in the software. What EDP step will that be? (Step 2A) Pick the best design

Today's Plan Plan 1) Explain/Discuss bellwork 2) Emphasize objective(s) (read above) 3) Ask about birthdays 4) View and discuss engineering design process notes 5) Complete 10-question study guide for a grade 6) Click-in your answers 7) Read over the "boat building" rubric 8) (Time permitting) Start building your boats WRITE THIS IN YOUR AGENDA! Homework: Bring materials to build your "boat" Boats are due Friday Sept 19th Science SPI 0807.T.E.1 (Prototype Testing) SPI 0807.T/E.2 (Eng. Design Process)

Notes SPI 0807.T/E.1 (Prototype Testing) SPI 0807.T/E.2 (Eng. Des. Process) Science The Iron Man Movies and the Engineering Design Process Billionaire genius and weapons designer Tony Stark is captured by terrorists, and they want him to build a super-weapon. Instead he builds an armored exoskeleton to fight them. 1 st Prototype Mark 1 Version 3 rd Prototype Mark 3 Version

Notes SPI 0807.T/E.1 (Prototype Testing) SPI 0807.T/E.2 (Eng. Des. Process) Step 1: Identify a need  Why did Tony Stark build the "Iron Man" suit? Step 2: Develop Possible Solutions  What are some other options he could have built instead?  Step 2A: Pick the best design  Do you think the "Iron Man" suit was the best design option? Step 3: Make a prototype  Where and how did Tony build his prototype(s) Step 4: Test the prototype  Where and how did Tony test his prototype(s) Step 5: Modify and re-test the prototype  How did Tony modify his prototype to make it work better? Science

1 st Prototype Mark 1 Version Prototypes are often called mark versions 3 rd Prototype Mark 3 Version 2 nd Prototype Mark 2 Version Notes SPI 0807.T/E.1 (Prototype Testing) SPI 0807.T/E.2 (Eng. Des. Process) Science

Watch Video Clips 1) Tony Stark tests his mark 2 prototype Link: Mark 2-Hover TestMark 2-Hover Test 2) Tony again tests his mark 2 prototype Link: Mark 2-Full Flight TestMark 2-Full Flight Test 3) Tony tests his mark 7 prototype Link: New Suit-Up ProcedureSuit-Up Procedure Note: stop or mute video at the 36 second point Notes SPI 0807.T/E.1 (Prototype Testing) SPI 0807.T/E.2 (Eng. Des. Process) Science

1) Working with a partner or working alone, design, build, and test a toy boat using recyclable materials. 2) You may also use materials such as glue and duct tape 3) The boat must be able to float for at least 60 seconds. 4) The boat must have a flat top at least 18 cm long (about seven inches) and 10 cm wide (about four inches). 5) The hull of the boat can not exceed 36 cm in length (about fourteen inches) and 30 cm in width (about twelve inches) 6) The boat should be no more than 22 cm in height (about nine inches) 7) The boat must have a name on it. NOTE: We will test them in water this Friday! Boat Project Rubric SPI 0807.T.E.1 (Prototype Testing) SPI 0807.T/E.2 (Eng. Des. Process)