Site-Wide Backup Briefing Ray Pasetes Core Support Services April 16, 2004.

Slides:



Advertisements
Similar presentations
IBM Software Group ® Integrated Server and Virtual Storage Management an IT Optimization Infrastructure Solution from IBM Small and Medium Business Software.
Advertisements

XenData SXL-5000 LTO Archive System Turnkey video archive system with near-line LTO capacities scaling from 210 TB to 1.18 PB, designed for the demanding.
Campus Wide Microsoft Agreement for Desktop Suite Education Enrolment Solutions (EES agreement)
XenData SX-520 LTO Archive Servers A series of archive servers based on IT standards, designed for the demanding requirements of the media and entertainment.
XenData SX-10 LTO Archive Appliance An Archive Appliance based on IT standards, designed for the demanding requirements of the media and entertainment.
XenData SXL-3000 LTO Archive System Turnkey video archive system with near-line LTO capacities scaling from 150 TB to 750 TB, designed for the demanding.
Company Equipment Upgrade Proposal. The Current Situation  It has been five years since Alt-F4 Inc. has upgraded any of it’s equipment.  200 Computers.
HEPiX, CASPUR, April 3-7, 2006 – Steve McDonald TRIUMF Steven McDonald & Konstantin Olchanski TRIUMF Network & Computing Services
10/11/2006 Office of Information Technology Princeton University Educause 2006 Copyright Copyright Charles Augustine This work is the intellectual.
Moving Your Computer Lab(s) to the Cloud Rick O’Toole & Dave Hicking University of Connecticut Libraries.
SAN DIEGO SUPERCOMPUTER CENTER at the UNIVERSITY OF CALIFORNIA, SAN DIEGO Disk and Tape Storage Cost Models Richard Moore & David Minor San Diego Supercomputer.
© Copyright 2013 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice. HP StoreOnce How to win.
SUMS Storage Requirement 250 TB fixed disk cache 130 TB annual increment for permanently on- line data 100 TB work area (not controlled by SUMS) 2 PB near-line.
Evolution of Enterprise Services in the Statistics Canada IT Environment Silver Buckler Chief, Managed Storage Section Informatics Technology Services.
Internet Backup Michael White Ross Schneider Jordan Divine.
1 Andrew Hanushevsky - HEPiX, October 6-8, 1999 Mass Storage For BaBar at SLAC Andrew Hanushevsky Stanford.
INSTALLING QNAP NAS FOR A SMALL NETWORK OF 5 PCS.
Backup Rationalisation Reorganisation of the CERN Computer Centre Backups David Asbury IT/DS Friday 6 December 2002.
CT NIKHEF June File server CT system support.
CD FY08 Tactical Plan Status FY08 Tactical Plan Status Report for Network Infrastructure Upgrades Rick Finnegan April 22, 2008.
IBM TotalStorage ® IBM logo must not be moved, added to, or altered in any way. © 2007 IBM Corporation Break through with IBM TotalStorage Business Continuity.
XenData Digital Archives Simplify your video archive workflow XenData LTO Video Archive Solutions Overview © Copyright 2013 XenData Limited.
Disk and Tape Square Off Again Tape Remains King of Hill with LTO-4 Presented by Heba Saadeldeen.
Gareth Smith RAL PPD HEP Sysman. April 2003 RAL Particle Physics Department Site Report.
Hands-On Microsoft Windows Server 2008 Chapter 1 Introduction to Windows Server 2008.
11 The Ultimate Upgrade Nicholas Garcia Bell Helicopter Textron.
Site License Advisory Team February 28, 2014 meeting.
DMF Configuration for JCU HPC Dr. Wayne Mallett Systems Manager James Cook University.
Step Arena Storage Introduction. 2 HDD trend- SAS is the future Source: (IDC) Infostor June 2008.
STEALTH Content Store for SharePoint using Caringo CAStor  Boosting your SharePoint to the MAX! "Optimizing your Business behind the scenes"
Purpose Intended Audience and Presenter Contents Proposed Presentation Length Intended audience is all distributor partners and VARs Content may be customized.
Meeting the Data Protection Demands of a 24x7 Economy Steve Morihiro VP, Programs & Technology Quantum Storage Solutions Group
Ray Pasetes, Andy Romero CSS Storage Services CD/CSS Central Services Activities Coordination Meeting 9/19/2006.
Updated Technology Purchase Plan Purchases to be split between the remaining funds in ($52,000) and the capital request for ($60,000) Projects.
CD FY09 Tactical Plan Status FY09 Tactical Plan Status Report for Site Networking Anna Jordan April 28, 2009.
Server Systems Administration. Types of Servers Small Servers –Usually are PCs –Need a PC Server Operating System (SOS) such as Microsoft Windows Server,
Paul Scherrer Institut 5232 Villigen PSI HEPIX_AMST / / BJ95 PAUL SCHERRER INSTITUT THE PAUL SCHERRER INSTITUTE Swiss Light Source (SLS) Particle accelerator.
Module 9 Planning a Disaster Recovery Solution. Module Overview Planning for Disaster Mitigation Planning Exchange Server Backup Planning Exchange Server.
GStore: GSI Mass Storage ITEE-Palaver GSI Horst Göringer, Matthias Feyerabend, Sergei Sedykh
CD FY08 Tactical Plan Status FY08 Tactical Plan Status Report for Network Infrastructure Upgrades Rick Finnegan April 22, 2008.
April 25, 2001HEPiX/HEPNT FERMI SITE REPORT Lisa Giacchetti.
BACKUP/MASTER: Strategies for Archiving Dianne McAdam Senior Analyst and Partner Data Mobility Group.
INFSO-RI Enabling Grids for E-sciencE Hellas Grid infrastructure update Kostas Koumantaros, Christos Aposkitis EGEE-HellasGrid Coordination.
2004 Purchasing Intentions Survey Mark Schlack Editorial Director, Storage Media Group TechTarget.
Introducing Virtualization via an OpenStack “Cloud” System to SUNY Orange Applied Technology Students SUNY Innovative Instruction Technology Grant Christopher.
CASPUR Site Report Andrei Maslennikov Lead - Systems Amsterdam, May 2003.
TiBS Fermilab – HEPiX-HEPNT Ray Pasetes October 22, 2003.
Gareth Smith RAL PPD RAL PPD Site Report. Gareth Smith RAL PPD RAL Particle Physics Department Overview About 90 staff (plus ~25 visitors) Desktops mainly.
CERN Computer Centre Tier SC4 Planning FZK October 20 th 2005 CERN.ch.
IBM Systems and Technology Group © 2009 IBM Corporation IBM System Storage – Tape Part 1 This document is for IBM and IBM Business Partner use only. It.
Greenlight Presentation Oracle 11g Upgrade February 16, 2012.
1 U.S. Department of the Interior U.S. Geological Survey CR1 Silo Briefing Presented By Ken Gacke, SAIC* U.S. Geological Survey, National Center EROS Sioux.
Lisa Giacchetti AFS: What is everyone doing? LISA GIACCHETTI Operating Systems Support.
Computing Division FY03 Budget and budget outlook for FY04 + CDF International Finance Committee April 4, 2003 Vicky White Head, Computing Division.
1 Evolution and Revolution: Windows 7 and Desktop Virtualization Changing the Desktop Support Landscape Denise Harrison, CIO and Vice President.
Status: Central Storage Services CD/LSC/CSI/CSG June 26, 2007.
CSS Services Activities Coordination Meeting March 2006 Mark Kaletka, Kevin Hill, Ray Pasetes.
TEVATRON DATA CURATION UPDATE Gene Oleynik, Fermilab Department Head, Data Movement and Storage 1.
Enterprise Vitrualization by Ernest de León. Brief Overview.
XenData SX-10 LTO Archive Appliance
Open-E Data Storage Software (DSS V6)
Integrating Disk into Backup for Faster Restores
iSCSI Storage Area Network
How To Pass IBM C Exam In First Attempt?.
Bernd Panzer-Steindel, CERN/IT
FY09 Tactical Plan Status Report for Site Networking
Upgrading to Microsoft SQL Server 2014
XenData SX-550 LTO Archive Servers
Tape Portfolio Messaging
Storage & Backup Solution Update
Presentation transcript:

Site-Wide Backup Briefing Ray Pasetes Core Support Services April 16, 2004

Agenda Progress Update Progress Update Proposed Model Proposed Model Proposed Rollout Proposed Rollout Initial Costs Initial Costs Estimated 6-year TCO Estimated 6-year TCO Needed Decisions Needed Decisions Critical Timeline Critical Timeline

Progress Update

12/03: Reduce scope to division-wide 12/03: Reduce scope to division-wide –Site-wide requirements too diverse –Start small, let others see it work, then expand 1/04: Interview groups 1/04: Interview groups –6 Groups ClueD0, D0-offline, CDF, CMS, FTP, ISA ClueD0, D0-offline, CDF, CMS, FTP, ISA SCS (represents 11 clusters/groups) SCS (represents 11 clusters/groups) –Along with CSI, 22 total clusters/groups represented

Progress Update 2/1: Interviews finished 2/1: Interviews finished 2/06: CSS department review of data 2/06: CSS department review of data –Most accepted 8to17 x5 service –Most accepted same day or NBD restore –Investigate using existing resources –Investigate costs for deployment -Initial deployment will backup 7+TB of data -Start pilot small

Proposed Model

Goals Provide a reliable data backup service Provide a reliable data backup service Reduce redundant effort, allowing division to be more productive Reduce redundant effort, allowing division to be more productive Long-term goal: reduce overall division spending on data backups via consolidation Long-term goal: reduce overall division spending on data backups via consolidation Long term goal: service accessible across entire site, desktops included Long term goal: service accessible across entire site, desktops included

Service Model Use farms model –> backup blocks Use farms model –> backup blocks –Backup blocks == 1 server + 4 or more tape drives –Smaller customers share the same backup block –Larger customers would have their own backup block(s)

Costing Model Charge based on total GB backed up Charge based on total GB backed up –Cost should completely cover tape costs –Cost should cover hardware and software maintenance costs –Cost should cover hardware costs “Profit” will be used to expand and enhance the system “Profit” will be used to expand and enhance the system

Costing Model - Example Year 1 customer: $1.15/GB on tape/yr or $34.50/GB of data to backup/year Year 1 customer: $1.15/GB on tape/yr or $34.50/GB of data to backup/year –Covers hardware, tape and maintenance costs Year 2+ customer: $0.33/GB on tape/yr or $9.82/GB of data to backup/year Year 2+ customer: $0.33/GB on tape/yr or $9.82/GB of data to backup/year –Covers maintenance, tapes, additional slots, etc. –No charge for existing hardware No connection or per client fees No connection or per client fees No restore fees No restore fees

Proposed Rollout

Start pilot small ~ 7.1TB Start pilot small ~ 7.1TB The following groups will be asked to partake in pilot project The following groups will be asked to partake in pilot project - Astro, CEPA, CMS, D0, ESH, FESS, ISA, KTEV, LSS, MINOS, NUMI, PPD, SDSS, SIDET, Theory, VMS Desktops NOT part of initial rollout Desktops NOT part of initial rollout Lessons learned in year 1 determine year 2 growth Lessons learned in year 1 determine year 2 growth

Proposed Rollout – Unknowns Limit of each backup block Limit of each backup block –Highly dependent on tape rotation and daily delta –A single server at CMU can handle 15TB of data Compressibility of data Compressibility of data –Affects cost of service –Affects performance

Proposed Rollout – Timeline 9/1 – Equipment delivered 9/1 – Equipment delivered 9/8 – Equipment Installed 9/8 – Equipment Installed 9/8-9/15 – Functionality test 9/8-9/15 – Functionality test 9/16-10/01 – Systems testing 9/16-10/01 – Systems testing 10/04 – Start rollout 10/04 – Start rollout 12/04 – Complete initial rollout 12/04 – Complete initial rollout ~2FTE effort required for initial rollout ~2FTE effort required for initial rollout

Initial Costs

Costs - Library Three Solutions STK and 9940B tape drives STK and 9940B tape drives ADIC and LTO-2 tape drives ADIC and LTO-2 tape drives SpectraLogic and SAIT-1 tape drives SpectraLogic and SAIT-1 tape drives

Costs – Library ItemsSTKSpectra D0 ADIC CDF ADIC Library$0$69,418.12$19,302.00$19, Drives Needed 8x 9940B 8x SAIT-1 8x LTO-2 Drive Cost $208,000$122,894.87$76,480$76,480 Tapes Needed Tape Cost $78,292($357.50/TB)$80,970($359.87/TB)$72,270($330/TB)$72,270($330/TB) TiBS S/W Port $30,000+$0$30,000+$30,000+ Maintenance$6,960$14,436$39,276$48,015 Total year 1 $323,252+$287,719.29$237,328+$246,067+

Costs – Server 2x Sun V $28K 2x Sun V $28K 1x SATA RAID Disk Cache -- $ 14K 1x SATA RAID Disk Cache -- $ 14K

Costs – Software - TiBS No additional client costs No additional client costs Servers: $8250 each Servers: $8250 each –2 have already been purchased –Additional cost for OFM s/w for Windows Process packs Process packs –Processes == number of parallel backups –45 processes have been purchased Maintenance – 15% Maintenance – 15% –Currently $11, annually Prices change if not managed by CSS

Possible Funding CSS Backup OP: $130K CSS Backup OP: $130K CSS Backup EQ: $120K CSS Backup EQ: $120K CMS Backup EQ: $100K CMS Backup EQ: $100K Other groups? Other groups?

Estimated 6-year TCO Two Growth Models 1. Fermi Standard 10% daily delta10% daily delta Data growth doubles yearlyData growth doubles yearly Approximately 40% above industry standardApproximately 40% above industry standard 2. Fermi Active 45% daily delta (CMS scenario)45% daily delta (CMS scenario) Data growth doubles yearlyData growth doubles yearly

Estimated Year 2 (14.2TB) Fermi Standard Fermi Standard –Double slots –Add caching disk –Tape cost down 25% Configuration: Configuration: –2 backup blocks –Slots 2x year 1 –Increased caching disk Fermi Active Fermi Active –~Triple slots –Double backup blocks –Add caching disk –Tape cost down 25% Configuration: Configuration: –4 backup blocks –Slots ~3x year 1 –Increased caching disk

Estimated Year 3 (28.4TB) Fermi Standard Fermi Standard –Double Slots –Add Caching disk Configuration: Configuration: –2 backup blocks –Slots 4x year 1 –Increased caching disk Fermi Active Fermi Active –Double backup blocks –Double slots –Add caching disk –Drive cost down 25% Configuration Configuration –8 backup blocks –Slots ~6.5x year 1 –Increased caching disk

Estimated Year 4 Tape technology changes Tape technology changes –Media capacity quadruples –Drive performance quadruples 10GigE standard 10GigE standard –Servers now equipped with 10GiGE –Increased bus speeds –Generally available to the lab

Estimated Year 4 Roll in new servers Roll in new servers –Backup block == 1 server + 8 tape drives Migrate customers onto new servers Migrate customers onto new servers Allow old tapes to migrate off via tape retention policies Allow old tapes to migrate off via tape retention policies Slowly tear down old backup blocks Slowly tear down old backup blocks Approximately 1 year migration Approximately 1 year migration

Estimated Year 4 (56.4TB) Fermi Standard Fermi Standard –2 new backup blocks –Increase slots by half Configuration: Configuration: –2 old backup blocks –2 new backup blocks –2/3 library old slots –1/3 library new slots –Slots 6x year 1 Fermi Active Fermi Active –2 new backup blocks –Increase slots by half Configuration: Configuration: –8 old backup blocks –2 new backup blocks –2/3 library old slots –1/3 library new slots –Slots ~10x year 1

Estimated Year 5 (112.8TB) Fermi Standard Fermi Standard –Add caching disk –Convert slots –Tape cost down 25% Configuration: Configuration: –2 backup blocks –All slots new 2/3 library used 2/3 library used 1/3 unused 1/3 unused –Slots 6x year 1 Fermi Active Fermi Active –Double backup blocks –Convert slots –Add caching disk –Tape cost down 25% Configuration: Configuration: –4 backup blocks –All slots new 2/3 library used 1/3 unused –Slots ~10x year 1

Estimated Year 6 (225.6TB) Fermi Standard Fermi Standard –Add caching disk –Increase slots by 1/3 Configuration Configuration –2 backup blocks –Slots 8x year 1 Fermi Active Fermi Active –Add caching disk -3 additional backup blocks -Increase slots 1/3 -Drive cost down 25% - Configuration: -7 backup blocks -Slots ~13x year 1

Estimated 6-year TCO Year Spectra Standard Spectra Active ADIC Standard ADIC Active 1$329,719$329,719$279,328$279,328 2$135,064$454,402$142,848$474,458 3$132,569$721,767$234,420$830,748 4$582,057$756,795$723,142E 5$194,192$623,280$268,688E 6$367,681$1.13M$505,083E Total~$1.74M~$4.02M~$2.15ME

Needed Decisions

Decisions – Library Share D0 ADIC robot? Share D0 ADIC robot? –Initially, makes most sense financially –Backup s/w will need to be ported Custom engineering costs Custom engineering costs –Current s/w assumes all tapes are owned by backup service We will be the only deployment We will be the only deployment Fermi will need to provide development resources Fermi will need to provide development resources –Hardware –People/coordination –Active scenario outgrows robot at year 4. This assumes ZERO growth by D0 and SDSS (current users of robot). –Standard scenario will use 2/3 of D0 robot.

Decisions - Library Purchase new robot? (SpectraLogic) Purchase new robot? (SpectraLogic) –Higher initial cost –Lower TCO over 6 years. Years 2-6 lower operational costs than ADIC Years 2-6 lower operational costs than ADIC –Backup software already works with it. Service can be brought up more quickly. –SpectraLogic library running TiBS software to be deployed at MIT ( not for public disclosure ).

Decisions - Library Purchase new robot (part 2)? Purchase new robot (part 2)? –Small footprint. Fully populated library is 7 racks wide, 2 racks deep. –Library supports SAIT, LTO, LTO-2, SDLT, DLT –In ’05, will support disk –Relatively new product. Higher possibility hardware costs will decrease.

Footprint Comparison

Critical Timeline

4/21: Division request for departments to determine how budgets will be spent 4/21: Division request for departments to determine how budgets will be spent –CSI/SCS robots running out of room Windows support 2.3TB pending decision Windows support 2.3TB pending decision –D0 Legato renewal 6/1/04: Promised date to CMS for backup service to be online 6/1/04: Promised date to CMS for backup service to be online 6/30/04: Latest time for TiBS to begin porting effort to make FY ’04 timeline. 6/30/04: Latest time for TiBS to begin porting effort to make FY ’04 timeline.

Fini Open Discussion

CSI Backup System - Example Initially deployed in 2001 for AFS backups Initially deployed in 2001 for AFS backups Expanded to include UNIX and some windows Expanded to include UNIX and some windows 2003 – SCS added to backup system 2003 – SCS added to backup system Data has grown >600% since Data has grown >600% since Backup system has not grown Backup system has not grown

CSI Backup System - Example