March 13, 2009 RPG Meeting ERCOT System Development Update Jeff Billo.

Slides:



Advertisements
Similar presentations
Houston Region Import Capacity Project Planning for Reliable Power.
Advertisements

RPG: September 24, Approach for ERCOT Independent Review of the 2013 Houston Import Project Jeff Billo, Manager, Transmission Planning September.
October 16, 2009 RPG Meeting ERCOT RPG Project Review Update Jeff Billo.
Jan 22, 2013 RPG Meeting Sharyland Atlas-Driver Load Integration Project – EIR update.
Regional Planning Group Charter Revisions May 2008.
Regional Planning Group Project
Economic Criteria for Transmission Planning in the ERCOT Region Public Utility Law Seminar DeAnn Walker August 3, 2012.
Houston Region Import Capacity Project August 27, 2013 Regional Planning Group Meeting.
January 5, 2012 TAC Cross Valley 345 kV Project Jeff Billo Manager, Mid-Term Planning.
BRAZOS ELECTRIC COOPERATIVE Dobbin 345 Project David Albers, P.E. Manager – System Planning.
Valley Import Overview Jeff Billo Regional Planning Group Meeting July 22, 2014 Preliminary1.
Houston Area Dynamic Reactive Project March 11,
Warren Lasher Director, System Planning October 4, 2014 Our Energy Future.
December 7, 2012 ERCOT Planning Horizon SOL Methodology Update Jeff Billo RPG.
10/03/ Report on Existing and Potential Electric System Constraints and Needs Within the ERCOT Region October 3, 2002.
2015 RTP – Study Scope of Short Circuit Analysis RPG Meeting May 19,
April 16, 2010 RPG Meeting ERCOT Five-Year Transmission Plan Update Jeff Billo.
RPG Meeting Five Year Plan Extension Brad Schwarz.
Technical Advisory Committee Presentation to the ERCOT Board of Directors July 21, 2009.
Board of Directors Meeting February 26, 2013 Standards, Registration and Certification Report.
1 Overview of Stanton Division and SPS Lines’ Purchase June, 2013.
June 19, 2009 RPG Meeting ERCOT System Development Update Jeff Billo.
October 16, 2009 RPG Meeting ERCOT 2009 Five-Year Transmission Plan Update Jeff Billo.
POWER SYSTEM PLANNING CHARTER AND PROCESSES UPDATES Presentation to TAC Sept 9, 2004 Transmission Services Ken Donohoo, Manager of System Planning
Wholesale Market Subcommittee Texas Interconnection Long-Term Study Update Warren P. Lasher April 8, 2011.
02/13/2009 RPG Wind Interconnection Survey Dan Woodfin Director, System Planning.
April 16, 2010 RPG Meeting Lamesa Area Upgrades ERCOT Independent Review Jeff Billo.
2008 Annual Five Year Plan Update 2 10/12/2007 Regional Planning: Jay Teixeira, Harry Liu, Brad Schwarz, Jeff Billo, Chris Ngai.
CMWG Update Mark Soutter - Invenergy LLC WMS November 2015 Meeting.
JACKSBORO TO WEST DENTON and WEST LEVEE TO NORWOOD 345-kV PROJECTS April 20, 2004 Transmission Services Operations.
Jeff Billo Manager, ERCOT Transmission Planning Kenedy to Nixon to Seguin Line Upgrade Project Regional Planning Group (RPG) Review; ERCOT Independent.
ERCOT TAC11/2/ CREZ Study Update ERCOT TAC 11/2/2006.
February 13, 2009 RPG Meeting ERCOT System Development Update Jeff Billo.
ERCOT Independent Review
9/12/2006 TPTF MIS / Training Status & Update Pat Harris A portal is a web site or service that offers a broad array of resources and services such as.
Date Meeting Title (optional) Texas Reliability Entity Update Don Jones Manager, Reliability Standards.
October 16, 2009 RPG Meeting ERCOT Independent Review of the Corpus Christi Improvements Project Jeff Billo.
LCRA TSC/ CPS Energy Transmission System Addition Regional Planning Group Project Jeff Billo Sr. Manager, Transmission Planning TAC ERCOT Public March.
ERCOT PUBLIC November RPG Meeting RTP – Study Scope November 20, 2015.
RPG: September 24, Long-Term System Assessment Introduction Jeff Billo, Manager, Transmission Planning September 2013 Regional Planning Group.
May 15, 2009 Regional Planning Group CREZ Implementation Study Update Warren Lasher Manager, System Assessment.
Jeff Billo Manager, Transmission Planning
September 1, 2011 TAC Lower Rio Grande Valley Regional Planning Group Project Jeff Billo Manager, Mid-Term Planning.
ERCOT – MISO DC Tie Study Comments
Panhandle Renewable Energy Zone (PREZ) Study
May14, 2010 RPG Meeting Houston Import Study Update Jeff Billo.
PLWG Report to ROS September 4, PGRR039 PGRR requires Interconnecting Entities (IEs) to provide information for ERCOT’s resource adequacy reports,
Update to RMS March 1, 2016 ERCOT Retail Market Training Task Force Co-Chairs: Deborah McKeever, Oncor Tomas Fernandez, NRG Sheri Wiegand, TXU Energy.
CREZ Related Generation Interconnection Studies July 2008 Jeff Billo RPG meeting
August 24, 2007 ERCOT Regional Planning Group Meeting CREZ Transmission Optimization Study Warren Lasher System Assessment.
December 14, 2007 RPG - CREZ Meeting CREZ Transmission Optimization Study: Update Warren Lasher ERCOT System Assessment.
October 12, 2012 RPG Planning Guide 5.3.2(2) Developer obligation to keep RARF data updated Cathey Carter Resource Integration.
Transition Plan Network Operations Model Change Requests 5/26/2010.
Technical Advisory Committee Presentation to the ERCOT Board of Directors May 20, 2009.
ERCOT PUBLIC LTSA Introduction. ERCOT PUBLIC 2 Outline  Background  2016 LTSA Process  2016 Scenario Development Process  2016 LTSA Schedule.
June 11, 2010 RPG Meeting Houston Import Study Update Jeff Billo.
03/06/2008 TAC CREZ Transmission Optimization (CTO) Study Update Dan Woodfin Director, System Planning.
Impact of not including proposed generators lacking RARF data in the planning models Planning Guide Section 6.9 Issues February 17, 2016.
NERC Transmission System Vegetation Management Standard ERCOT TAC Update Mike Boone – CenterPoint Energy John Schechter – AEP August 4, 2005 Austin, TX.
1 ERCOT 2015 West Texas Study November 18, 2014 Jeff Billo.
October 15, 2012 PV & Storage Workshop ERCOT’s Interconnection Process John Adams Principal Engineer.
Subsynchronous Resonance Update Jeff Billo, Senior Manager ERCOT Transmission Planning February 3, 2016 Wholesale Market Subcommittee 1ERCOT Public.
Houston Area Constraint Mitigation Project ERCOT Board of Directors March 15, 2005.
RPG - 10/12/2007 Competitive Renewable Energy Zones (CREZ) Update Bill Bojorquez Vice President, System Planning.
Houston Import Study Update
ERCOT 2009 Five-Year Transmission Plan Update
August 25, 2016 TAC Update to COPS
Warren Lasher Manager, Long-Term Planning and Policy
Modifications to Planning Charter
Status Update for Reliability/Market Power Mitigation Assessment
Presentation transcript:

March 13, 2009 RPG Meeting ERCOT System Development Update Jeff Billo

2 RPG MeetingMarch 13, 2009 Topics CREZ Generation Full Interconnection Studies RPG Project Review Update Five-Year Transmission Plan Update

3 RPG MeetingMarch 13, 2009 CREZ GINR FIS Background –Since August 2007 ERCOT has put on hold generation full interconnection study (FIS) requests for projects that will interconnect to “CREZ” transmission facilities –Currently there are 14 studies on hold and 5 studies that would have been on hold had the moratorium started before August 2007 The Process Going Forward –ERCOT will remove generation projects from being on hold once both of the following conditions are met: The project’s interconnecting TSP has been identified by the PUCT final order in docket The project’s interconnecting TSP has a code of conduct in place at the PUCT

4 RPG MeetingMarch 13, 2009 RPG Project Review Update Acceptance Letter in process for: –LCRA TSC Flatonia-Yoakum Project (Tier 3) ERCOT Independent Review of the Austin Energy Decker to Techridge 138 kV Circuit Relocation Project (Tier 2) is underway ERCOT Independent Review of the LCRA TSC Cushman-Highway 123 Project (Tier 2) has just begun LCRA TSC GPI-FM482-Parkway Project (Tier 2) is in Study Mode Centerpoint 2012 Northwest Houston Reliability Project (Tier 2) is in the Comment Period Comments on Sharyland ERCOT Southeast Loop Project (Tier 1) appear to be irresolvable by the RPG. ERCOT will take the comments into account as we perform the Independent Review

5 RPG MeetingMarch 13, Five-Year Transmission Plan Update Currently working on case conditioning and converting case to UPLAN

6 RPG MeetingMarch 13, 2009 Questions?