Vendors Conference Prestwick 2011 Customer Picture Implementation of Changes to ICAO FPL 2012 Christoph Kunze Lufthansa Systems 7th December 2011.

Slides:



Advertisements
Similar presentations
ICAO FPL 2012 Implementation Workshop Lisbon 16 th February 2012 Kim Breivik Chairman EUR 2012 Task Force Operational Requirements, Network Management.
Advertisements

ICAO FPL 2012 Implementation Workshop Lisbon 16 th February 2012 Kim Breivik Chairman EUR 2012 Task Force Operational Requirements, Network Management.
How Many UN Regulations Can Be in IWVTA? Position by the expert from the Russian Federation September 2013 Transmitted by the expert from the Russian Federation.
European Organisation for the Safety of Air Navigation Presentation to ICAO Workshop Kiev 28 July – 1 July 2010 EUR Regional Implementation of Flight Plan.
European Organisation for the Safety of Air Navigation Presentation to ICAO Workshop Kiev 28 July – 1 July 2010 EUR Regional Implementation of Flight Plan.
European Organisation for the Safety of Air Navigation Presentation to ICAO Workshop Kiev 28 July – 1 July 2010 EUR Regional Implementation of Flight Plan.
International Civil Aviation Organization European and North Atlantic Office Outcome of the ICAO EUR FPL2012 Workshop Kiev, Ukraine 29 June – 1 July 2010.
COS 420 DAY 22. Agenda Assignment 4 Corrected 2 B’s Assignment 5 posted Chap Due May 4 Final exam will be take home and handed out May 4 and Due.
Copperchase FPL Copperchase FPL2012 Prestwick December 2011 Tony Myers.
1. 2 ECRF survey - Electronic signature Mr Yves Gonner Luxembourg, June 12, 2009.
International Civil Aviation Organization European and North Atlantic Office CLARIFICATIONS FROM ICAO - ICAO EUR FPL2012 Workshop Kiev, Ukraine 29 June.
FPL2012 TF#7Brussels 10 October 2012 Kim Breivik Operational Requirements Network Management EUROCONTROL Testing Report.
SE-02 CONFIGURATION MANAGEMENT Today we talk about Software Configuration Management (SCM for short): - What? - Why? - How?
SIS – Simplified Interline Settlement Impact on Billing Rules
International Civil Aviation Organization SAM Regional Seminar/Workshop Tom Brady ICAO Air Navigation Bureau May Flight Plan Implementation and.
Electronic Resources: KBART File Template & Data Fields
ICAO Flight Plan 2012 Workshop ARE YOU READY? Durban 24 August 2012.
PRISM Configuration to Require
ICAO Changes to the Present Flight Plan Form Amendment 1 to the PANS-ATM Fifteenth Edition (PANS-ATM, Doc 4444) Tom Brady ICAO HQ.
Discussion of Market Participant Choice for Transmission Connections Stakeholder Session October 14, 2011.
FPL2012 TF#7Brussels 10 October 2012 Kim Breivik Operational Requirements Network Management EUROCONTROL Deployment.
Software Engineering 2003 Jyrki Nummenmaa 1 CONFIGURATION MANAGEMENT Today we talk about Software Configuration Management (SCM for short): -
AMIA 2008 Monday, Nov :15-1:30 National Library of Medicine National Institutes of Health U.S. Dept. of Health & Human Services UMLS ® Users’ Meeting.
Session 21-2 Session 42 Common Origination and Disbursement (COD): Direct Loan and Pell Processing.
Validation Tool (VTool) PDS Management Council Meeting Washington, D.C. November 2006
EUR Flight Planning Guidance
TX SET Update to RMS Wednesday, November 7, 2007.
Variants with be.as script. © beas group 2011 / Page 2 This documentation and training is provided to you by beas group AG. The documents are neither.
Document Imaging and A/P Routing Presented by Brian Cancian.
Doc.: IEEE /0828r0 Submission May 2007 Harry Worstell, AT&TSlide 1 Procedural Clarification Notice: This document has been prepared to assist.
MENA-IUG 8 th Annual Conference Doha, th Nov 2013 Arabic Roundtable Amr Almasry (QNL) & Stefan Seeger (GUQ)
Doc.: IEEE /0408r0 Submission May 2005 John Klein, SymbolSlide 1 TPC Comments Notice: This document has been prepared to assist IEEE It.
1. 2 TX SET Version Release Schedule RMS Assignment /Action Item Form Discussion Topic.
Doc.: IEEE /0054r0 Submission January 2005 Jesse Walker, Intel CorporationSlide 1 JTC1 Ad Hoc Agenda Notice: This document has been prepared to.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
Service Enhancement AMHS Implementation Workshop Chennai, India 15 th – 17 th December 2008.
Documents Authors Objectives Software Description Learning Areas Levels.
Presentation to ICAO Workshop Kiev 28 July – 1 July 2010 EUR Regional Implementation of Flight Plan Amendment 1 for 2012 Issues with Certain Fields.
CLARIFICATIONS FROM ICAO - ICAO EUR FPL2012 Workshop
FILING OF VFR FLIGHT PLANS
MobileNAV News Sándor Brecsok Tibor Major Partner Manager MobileNAV
Completing Your Technical Paper Submission for SAMPE 2018 – Long Beach
FAA Implementation of Amendment 1
TechStambha PMP Certification Training
2nd Plugfest Kickoff July 18, 2016.
FPL 2012 FPL Vendor Conference Mona Annaddaf Scotland, 7-8/12/2011
Overview Review issues, equipment, training, operational limitations and performance requirements for issues regarding OpSpecs, MSpecs and LOAs Review.
SIS – Simplified Interline Settlement Impact on Billing Rules
Enhancement Notification Release 5.4
ICAO 2012 Network Operations Update
Emergency Call number support
Variants with be.as script
Eurasia Coordination Board EUR Implementation Plan
Manufacturers Webinar
ADS Study Group Agenda Date: Authors: January 2005
Standard Design Process (SDP) Software Tom Czerniewski Entergy Nuclear
ICAO 2012 FPL Anthony Coult 8 Dec 2011.
IEEE Contribution Author’s Name Affiliation Address Phone
Audio for this webcast will stream via your computer’s speakers.
Mechanism to update current session parameters
RAD Evolution Workshop Current RAD status
Ministry of Infrastructure and Transport
SAM Regional Seminar/Workshop
IEEE TGz Taipei Agenda Date: Authors: July 2007
Copy and Paste (Embedding)
Limiting GAS State-1 Query Response Length
Presentation to ICAO Workshop Kiev 28 July – 1 July 2010 EUR Regional Implementation of Flight Plan Amendment 1 for 2012 OLDI Issues
July 2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG w July 2019 Closing Report] Date.
doc.: IEEE <doc#>
Status of discussion after 8th meeting
Presentation transcript:

Vendors Conference Prestwick 2011 Customer Picture Implementation of Changes to ICAO FPL 2012 Christoph Kunze Lufthansa Systems 7th December 2011

Agenda Clarification of regional variations Timescale for testing ICAO FPL 2012 Vendors Conference, Prestwick Ch. Kunze 07 December 2011 Chart 1

Regional Variations Examples for regional variations Discrepancies between ICAO Doc‘s (4444 and 7030) RVR: Doc 7030 EUR Region: Keyword shall appear, but where in a sequence which is now mandatory? RFP/Qn: Doc 7030 EUR Region: Keyword shall appear as 1st subject in item 18 ICAO FPL 2012 Vendors Conference, Prestwick Ch. Kunze 07 December 2011 Chart 2

Regional Variations Examples for regional variations Item 19 requested as part of item 18 which is in contradiction to Doc 4444 publication RIF (Re-clearance in Flight) some ATC units have problems in processing Speed/Level groups within the new routing Wake Turbulence Category J ( for A380s) not yet accepted in all parts of the world, but required in others. Not yet documented in Doc 4444 ICAO FPL 2012 Vendors Conference, Prestwick Ch. Kunze 07 December 2011 Chart 3

Regional Variations Other items States requesting airlines to use new items from ICAO FPL 2012 already to today (e.g. Brasil was requesting PBN info for a while) FPL Format Field length of item 10a Handling of 69 character line limit within AFTN ICAO FPL 2012 Vendors Conference, Prestwick Ch. Kunze 07 December 2011 Chart 4

Agenda Clarification of regional variations Timescale for testing ICAO FPL 2012 Vendors Conference, Prestwick Ch. Kunze 07 December 2011 Chart 5

Timescale of testing Start as early as possible Most of our internal tests are completed Extrernal tests can start Closer to the 15th of Nov more options for testing might be needed Late modifications to software to correct findings from early test sessions Rollout of software release to all concerned needs time ICAO FPL 2012 Vendors Conference, Prestwick Ch. Kunze 07 December 2011 Chart 6

ICAO Flight Plan 2012 Lufthansa Systems Test Environment Dedicated test environment in FRA for tests with e.g. ATC Authorities Available to customers from the beginning of July 2011 Only for test purposes with external participants Live filing of new FPL format to configured AFTN (Test-)Addresses Schedules / Tasks Off-line tests against Eurocontrols IFPUV System Participation in CFMU Test Sessions (OPT Test Sessions) Tests with regional ATC Authorities started (e.g. Ukraine) ICAO FPL 2012 Vendors Conference, Prestwick Ch. Kunze 07 December 2011 Chart 7

Regional Variations Thank you for your attention! ICAO FPL 2012 Vendors Conference, Prestwick Ch. Kunze 07 December 2011 Chart 8