PQB Meeting Intermediate Frequency (IF) Cards Study & BPMs Summary March 24, 2009.

Slides:



Advertisements
Similar presentations
Front-end electronics for the LPTPC Outline of the talk:  System lay out  Mechanics for the front-end electronics  End-cap and panels  Connectors and.
Advertisements

Parity Quality Beam (PQB) April 07, Notes: 1.For each BPM, the wires are: +X+, +X-, +Y+, +Y- 2.There are only two injector BPMs we are not reading:
Proposal for a barrel prototype H. Álvarez-Pol, J. Benlliure, E. Casarejos, D. Cortina, I. Durán, M. Gascón Status of the USC 15 th October 2007.
8th February 2011Electronics for Commissioning1 Signal characteristics. Readout & electronics overview. Plan.
Slide 1Fig. 10.1, p.293. Slide 2Fig. 10.1a, p.293.
Ron Johnson Beam Position October 29-31, Beam Position Monitors FAC Review October 29-31, 2007 Stripline BPM.
Hamid Shoaee LCLS FAC Controls June 17, LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.
Update on FMS Repair Stephen Trentalange STAR Management Meeting October 31,
Status of mTCA Stripline BPM Development June 4-5, 2012 Dan Van Winkle for BPM team: Sonya Hoobler, Tom Himel, Jeff Olsen, Steve Smith, Till Straumann,
Electronic Cross-talk & Ground Loop Elimination in Injector Riad Suleiman Center for Injectors and Sources.
JLab Polarized Source Happex Collaboration Meeting May 18, 2007 P. Adderley, J. Brittian, J. Clark, J. Grames, J. Hansknecht, M. Poelker, M. Stutzman,
Hydrogen Recombination Time (µs) RF Envelope (V) Here So We get Calculated from # of protons per bunch Calculated from energy loss (voltage drop) in the.
Polarized Source Development Run Results Riad Suleiman Injector Group November 18, 2008.
Real-time Parity Feedback John Hansknecht & Riad Suleiman April 28, 2009.
CRIO as a hardware platform for Machine Protection. W. Blokland S. Zhukov.
TRIUMF Qweak Electronics Des Ramsay Nov Status of Electronics November, 2008  36 VME modules (# 001 and # ) delivered to JLab  001, 003,
SNS Integrated Control System SNS Timing Master LA-UR Eric Bjorklund.
Parity Quality Beam (PQB) Study Injector Group November 10, 2008.
Hall A Parity Workshop (May 10, 2002), 1 Operated by the Southeastern Universities Research Association for the U.S. Depart. Of Energy Thomas Jefferson.
DAQ MICO Report Online Monitoring: –Status All histograms are now implemented Still not fully online –Only monitoring from data file (slightly offline,
Ethernet Based Embedded IOC for FEL Control Systems J. Yan, D. Sexton, Al Grippo, W. Moore, and K. Jordan ICALEPCS 2007 October 19, 2007 Knoxville Convention.
#3205 Summary Studying beam instabilities along bunch train 3 observables – INJ-BPM-01 fast bunch electronics – INJ FCUP-01 – Laser pulse power. Laser.
BI day 2011 T Bogey CERN BE/BI. Overview to the TTpos system Proposed technical solution Performance of the system Lab test Beam test Planning for 2012.
Polarized Injector Status QWeak Collaboration Meeting February 1, 2010 P. Adderley, J. Clark, J. Grames, J. Hansknecht, M. Poelker, M. Stutzman, R. Suleiman,
Fast Helicity Reversal Riad Suleiman Injector Group June 2, 2009.
KHz-SLR PC Board Eastbourne, October 2005 for kHz SLR Complete PC Board.
FLASH II. The results from FLASH II tests Sven Ackermann FEL seminar Hamburg, April 23 th, 2013.
Tracker Timing and ISIS RF Edward Overton 1. At CM32… 2 Had done some preliminary checks on the ISIS RF. Was beginning to think about how to handle the.
Parity Quality Beam (PQB) Study Injector Group September 2008.
DAQ Map of Electronic Components R. Suleiman February 12,
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
SoLiD/PVDIS DAQ Alexandre Camsonne. DAQ limitations Electronics Data transfer.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
Craig Drennan Linac and 400 MeV BPMs January 7, 2011.
#3205 Summary 6 th Nov 2012 Studying beam instabilities along bunch train 3 observables – INJ-BPM-01 fast bunch electronics – INJ FCUP-01 – Laser pulse.
ATF DR BPM Upgrade Janice Nelson, Doug McCormick, Justin May, Andrei Seryi, Tonee Smith, Mark Woodley.
G 0 PC Installation and Beam Studies Stephanie Bailey Riad Suleiman.
Re-designing the Helicity Board Riad Suleiman Injector Group March 19, 2009.
Injector Status & Commissioning QWeak Collaboration Meeting May 24, 2010 P. Adderley, J. Clark, S. Covert, J. Grames, J. Hansknecht, M. Poelker, M. Stutzman,
#3205 Summary Studying beam instabilities along bunch train 3 observables – INJ-BPM-01 fast bunch electronics – INJ FCUP-01 – Laser pulse power. Laser.
All Experimenters MeetingDmitri Denisov Week of July 22 to July 29 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.1pb -1 u Live:
Parity Experiments and JLab Injector Riad Suleiman February 5, 2016.
CEBAF Source and Injector Status PREx-II Collaboration Mtg Feb. 26, 2016 Matt Poelker and Joe Grames Center for Injectors and Sources.
G 0 Project Coordinator Report Joe Grames “Big Picture” Schedule Preparations Polarized Source Injector Accelerator Hall C Accelerator Plans for 687 MeV.
LUIS MERCADO UMASS 7/10/09 HAPPEX DAQ / 18-bit ADCs.
Parity Quality Beam (PQB) B-Team Meeting September 10, 2008.
Polarized Injector & Upgrade Schedule QWeak Collaboration Meeting November 06, 2009 P. Adderley, J. Clark, J. Grames, J. Hansknecht, M. Poelker, M. Stutzman,
Polarized Injector Update
Belle-II VXD radiation monitoring and beam abort with sCVD diamond sensors Lorenzo Vitale, Belle-II SVD collaboration INFN and Univ. Trieste, ITALY Requirements.
Parity Violation Experiments & Beam Requirements
ALICE Trigger Upgrade CTP and LTU PRR
Data Acquisition (DAQ) Status
A Mini-Primer for Parity Quality Beam (as seen from the Accelerator)
Parity Violation Experiments at JLEIC
Parity Quality Beam (PQB)
Accelerator Issues Raised in Hall A Parity Collaboration Meeting, April B-Team Meeting April 29, 2009.
QWeak Collaboration Meeting
G0 PC Installation and Beam Studies
Qweak Coordination Meeting
Polarized Source Development Run Results
Feedback Systems Joe Grames Hall A Parity Meeting Jefferson Lab
Injector Studies Using Superlattice Photocathode
Status of Instrumental Beam Studies and Technical Description of Detectors and DAQ February 24, 2017.
PQB Meeting March 05, 2009.
Beam Position Noise from 500 keV MBO0I06 Dipole Sensor
B-Team Meeting October 28, 2009
Experiment Energy (GeV) Pol (%) I (µA) Target Apv (ppb) Charge Asym
Injector Commissioning & Optimization
DAQ for SBS GEM SBS collaboration meeting August 6th 2019
Parity system? VME Crate Xp, Xm muxed Xin Yin +Xp +Xm +Yp +Ym Xin Yin
Presentation transcript:

PQB Meeting Intermediate Frequency (IF) Cards Study & BPMs Summary March 24, 2009

TRANSPORT IF Cards

Notes: 1.Chan 1: 1I02 X+, Chan 2: 1I02 X-, Chan 3: T_Settle (Trigger) Pockels Cell ON TRANSPORT IF Cards Pockels Cell ON Pockels Cell OFF Pockels Cell OFF

TRANSPORT IF Cards PC ON 1 kHz 100 µs

PC OFF 1 kHz 100 µs TRANSPORT IF Cards

LINAC IF Cards

New LINAC IF Cards PC ON 1 kHz 500 µs

New LINAC IF Cards PC ON 1 kHz 100 µs

New LINAC IF Cards PC ON 1 kHz 60 µs Not in Data Stream

New LINAC IF Cards PC ON 1 kHz 10 µs Not in Data Stream Now charge is affected

IF & S/H Cards Summary

Notes: 1.All BPMs have SEE TRANSPORT RF electronics, we are only changing the IF cards: 2.SEE TRANSPORT RF has a dynamic range of 70 nA – 200 µA 3.y-position differences very often have outliers, observed since last October, why? TRANSPORT IF CardLINAC IF Card Sample Time140 µs8.6 µs Fixed Delay70 µs4.3 µs

Injector BPMs: 1.iocse11: I.1I02, 1I04, 1I06, 0I02, 0I02A, 0I05, 0I07 II.LINAC (changed from TRANSPORT in Jan 09) 2.iocse19: I.0L01, 0L02, 0L03, 0L04, 0L05, 0L06, 0R05, 0R06 II.TRANSPORT III.0R06 needs S/H card 3.iocse12: I.0L07, 0L08, 0L09, 0L10, 0R01, 0R02, 0R03, 0R04 II.TRANSPORT III.No space for S/H cards for 0R03 and 0R04 Modifications: I.Need one S/H card for 0R06 and cables to Parity DAQ (1 S/H card) II.iocse11 IF cards were changed (7 IF cards) III.Need to change iocse19 and iocse12 IF cards to LINAC (16 IF cards) IV.For iocse12, need to drop 0R01 and 0R02 instead of 0R03 and 0R04

Hall A BPMs: 1.iocse8: I.1C01, 1C02, 1C03, 1C04, 1C05, 1C06, 1C10, 1C00 II.TRANSPORT III.Only 1C10 has S/H card IV.Crate has 7 empty slots 1.iocse9: I.1C07, 1C08, 1C11, 1C12, 1C14, 1C16, 1C18, 1C20 II.LINAC III.Only 1C08 and 1C12 have S/H cards IV.Crate has 1 empty slot 2.iocse10: I.1P02A, 1P02B, 1P03A, 1H01, 1H04A, 1H04B II.LINAC III.All have S/H cards IV.Crate has an extra S/H card Modifications: I.Move the S/H card from iocse8 to iocse9 to be used with 1C14 II.Remove the extra S/H from iocse10 III.Does PREx have any other needs?

Hall C BPMs: 1.iocse18: I.4C00, 3C01, 3C02, 3C03, 3C04, 3C05, 3C06, 3C07A, 3C10, 3C17, 3C00, 3C19 II.TRANSPORT III.Only 3C07A and 3C17 have S/H cards IV.Crate full, no space for S/H cards 2.iocse14: I.3C07, 3C08, 3C11, 3C12, 3C14, 3C16, 3C18, 3C20 II.TRANSPORT III.Only 3C08, 3C12, and 3C16 have S/H cards IV.Crate has 1 empty slot Modifications: I.No changes to iocse18 II.iocse14 IF cards to LINAC (8 IF cards) III.Move One S/H card from iocse14 to a VME next by. Use S/H Communication Extender card and add 5 S/H cards to this crate. Hall C to pull cables from BSY to Parity DAQ (5 S/H cards)

3.iocse17: I.3C17A, 3C20A, 3H00, 3H00A, 3H00B, 3H00C II.LINAC III.3C17A has no S/H card IV.Crate has 4 empty slots Modifications: a.3P01A, 3P02A, 3P02B, 3P03A, 3C21, 3C21A, 3H00, 3H00A b.Need 3 S/H cards c.Need 2 LINAC IF cards

4.iocse20 (New Crate): I.3H00B, 3H00C, 3H00D, 3H00E, QWEAK, QWEAKA, QWEAKB II.New BPMs and Old G0 BPMs III.Old G0 BPMs have TRANSPORT IF cards IV.Old G0 BPMs have S/H cards Modifications: I.Need 7 LINAC IF cards II.Need 5 S/H cards

Modifications Summary I.New VME Crate II.Need 13 S/H cards III.Need 40 LINAC IF cards IV.Hall C is responsible for Cables from new S/H cards in BSY and Hall C to Parity DAQ Cost Summary I.FY09: I. Filters for LINAC IF cards, 2 Filters per card, plus 20 spare Filters. Total of 100 Filters, each $240: $24k II.FY10: I.13 S/H cards (each $1k): $13k II.BPM electronics, Crate and ioc, 6 new BPMs in Hall C line: $25K