Updated: 13 June 2006 1 Capacities, Reservations and Historical data Press for information on historical operation data Press for information on capacities.

Slides:



Advertisements
Similar presentations
BEB Transport und Speicher Service GmbH, Hannover Capacity Development NW Region Capacity Development in the North-West.
Advertisements

ERGEG Public Hearing Brussels, 6 July 2006 Gunnar Lundberg Chair of the EURELECTRIC WG Wholesale Markets & Trading Vice Chair of the Markets Committee.
Gas Regional Initiative – North West Region Bonn 28 April 2009 Fiete Wulff Capacity Project C1 Short-Term Capacity (STC) Operators’ Group Update.
EU Developments Transmission Workgroup 6th October 2011.
Draft document – Work in progress
1 29 th April 2014 Teleconference 28 th IG Meeting South Gas Regional Initiative.
Titel: Achieving the Internal Gas Market The Danish Experiences Jan Ingwersen Senior Vice President Gastra A/S.
Slides prepared by Thomas Bishop Chapter 2 World Trade: An Overview.
Linepack ‘Park and Loan’ Quantity - Influencing Factors Review Group 291 – July 2010.
UNC Modification Proposal 0116 Reform of the NTS Offtake Arrangements Transmission Workstream 5 th October 2006.
2nd GTE Conference Copenhagen, September 2004 Author:Milan Sedlacek SPP (Slovak Gas Industry) Slovak Republic GAS TRANSIT THROUGH A NEW EU MEMBER STATE.
Update on transit compensation mechanism application in Baltics Arnis Staltmanis Head of International Project Department 16 September 2009, Vilnius.
Network Analysis - Introduction Transmission Planning Code Workshop 2 1 st May 2008.
Slides prepared by Thomas Bishop Copyright © 2009 Pearson Addison-Wesley. All rights reserved. Chapter 2 World Trade: An Overview.
Chapter 2 World Trade: An Overview Yanan University Finance and Economics Dep. Aihong Qin.
Investment in Gas Infrastructure A regulator´s view Nina GRALL Seminar on Gas Industry Restructuring in SEE 4/5th October 2005, Belgrade.
EUROPEAN COMMISSION Transparency – Proposal to amend chapter 3 of the Annex of Regulation 1775/2005 EUROPEAN COMMISSION H. Hick, DG TREN C 2 NW GRI 5th.
Further consultation on NTS entry baselines Nienke Hendriks Head of Gas Transmission Policy, Compliance and Enforcement 14 August 2007.
1 MOBILE6 -Input and Modeling Guidance -SIP and Conformity Policy North American Vehicle Emission Control Conference Atlanta, April 4, 2001 Gary Dolce.
The new System of voluntary Transparency Albert Moser Director Business Development European Energy Exchange AG Copenhagen, June 27 th, 2006.
Workshop on laying down rules on nominal quantities for prepacked products. Organised of European Commission – TAIEX – In co-operation with Serbian Chamber.
Capacity Release Processes and Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
Energy Industry Analysis 2009 November 2010 The purpose of this analysis is to document the significance of Danish energy industries for the economy and.
Capacity allocation in natural gas transmission networks Framework Guideline (Pilot) Dr. Stefanie Neveling, ACER Workstream Co-Chair Walter Boltz, ACER.
Review Group 291 – Balancing Arrangements Default Cashout Workshop 3 – 21 st June 2010.
Joel Martin 23 rd November 2010 MOD 329 – UNC Rules on setting SHQs / SOQs & the Network Referral Process.
Gas Balancing Alert Transmission Workstream – Oct 2005 Ritchard Hewitt.
Jonas Törnquist EFET Gas Market Transparency Requirements ERGEG Enabler Group Meeting Dublin, April 2007 Törnquist.
UNC (Urgent) Modification Proposal 0044: “Revised Emergency Cash-out & Curtailment Arrangements” UNC Transmission Workstream 11 th August 2005.
8 February Study Co-Ordination on Day Ahead Capacity in Bunde/Oude Statenzijl and Ellund EC-Operators of Implementation Group ERGEG Regional Gas.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Experience with Liberalisation GTE Conference October 22-23rd 2003, Paris Jan Ingwersen Senior Vice-President DONG Transmission A/S 'Experience with Liberalisation.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Preparatory work for Framework Guideline Tariffs.
Madrid, May 21 st th SG Meeting South Gas Regional Initiative Working Group 4B: Open Seasons.
Vienna, 24 november GRI SSE: work done so far 1. Assessment summary on selected transportation routes ongoing 2. Preliminary paper on hubs as regional.
1 Modification Proposal 0199: Clarification around the application of the UNC Dispute Resolution Process Alison Chamberlain National Grid Distribution.
1 v1 iGT CSEP Billing Solution ScottishPower Proposals April 08.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
Transmission workstream 6 April Overview of TPCR Third Consultation UNC transmission workstream – 6 April Mark Feather.
Ofgem Information Request on availability of NTS Exit Flexibility Capacity Ritchard Hewitt Gas Code Development Manager National Grid Transmission 7 th.
MYKHAILO GONCHAR NOMOS / STRATEGY XXI, UKRAINE Brussels, March 27 Transparency Regime for Trans-border Gas Flows: fundamentals and ideas.
RIIO Gas Transmission Workshop - 5 th Sept Supplementary information 1 Hypothetical examples to illustrate the impact of combining the constraint management.
Gas Regional Initiative North-West Transmission System Operators Page 1Transmission Transparency, Transmission Transparency Project GRI North-West.
Review Group -140 Thoughts on additional information requirements.
Hub liquidity and efficient transmission and trade of gas between hubs 1.Introduction 2.Operator survey 3.Key issues 4.Way forward.
18 December Study Co-Ordination on Day Ahead Capacity in Bunde/Oude Statenzijl and Ellund EC-Operators of Implementation Group ERGEG Regional Gas.
NTS Exit Regime Transmission Workstream – 6 th July 2005.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
System Operator information transparency. As Transmission System Transporter National Grid Gas undertakes responsibility for safe, effective and efficient.
EU Phase 2 Delivery & UK Link Programme; Impacts on Gemini Process European Workgroup 1 st May 2014.
Teaching material by: Tim McAloone, DTU Niki Bey, IPU Environmental improvement through product development Step 5: Quantify the environmental impacts.
5-1 Topic 1 Tangible Non-current Assets IAS 36 Impairment of Assets Accounting issues The objective of IAS 36 Impairment of assets is to set rules to ensure.
Congestion Management
New transparency guidelines
Gas Supply to the EU – the Role of the Slovak Republic
Demand forecast and network balancing
Update on GRI NW Transparency Project
Background and Process
MEXICO/ FROM CLOSED TO OPEN
29th April 2014 Teleconference
Nordic Winter Power Balance
Capacity Methodology Statements
Walter Boltz Chairman, CEER Gas Working Group
EURELECTRIC transparency requirements
Proposed Transitional Gas Exit Arrangements
Transmission Workstream - EU 3rd Package Update
Stefan Leedham Transmission Workstream 2nd November 2006
Update on WS3 Activities
Day Ahead Capacity Trading
Transmission service (approved tariffs) (approved tariffs) Variation
Presentation transcript:

Updated: 13 June Capacities, Reservations and Historical data Press for information on historical operation data Press for information on capacities and reservations The content of this document is indicative and therefore not legally binding. Exit Zone Denmark Stop 2006

Updated: 13 June Capacity and Reservations - Entry Nybro Capacity Nm 3 /Hour

Updated: 13 June Day Deliveries Entry Nybro Nm 3 /Day Operational data – non-fiscal data

Updated: 13 June Hourly Deliveries 2003 – Entry Nybro Nm 3 /Hour Operational data – non-fiscal data

Updated: 13 June Day Deliveries Entry Nybro Nm 3 /Day Operational data – non-fiscal data

Updated: 13 June Hourly Deliveries 2004 – Entry Nybro Nm 3 /Hour Operational data – non-fiscal data

Updated: 13 June Day Deliveries Entry Nybro Nm 3 /Day Operational data – non-fiscal data

Updated: 13 June Hourly Deliveries 2005 – Entry Nybro Nm 3 /Hour Operational data – non-fiscal data

Updated: 13 June Day Deliveries Entry Nybro Nm 3 /Day Operational data – non-fiscal data

Updated: 13 June Hourly Deliveries 2006 – Entry Nybro Nm 3 /Hour Operational data – non-fiscal data

Updated: 13 June As a rule, it is not possible to nominate larger entry amounts than exit amounts. The possible physical import depends on specific pressure conditions, gas quality, and the time required to turn the physical stream, and must be further evaluated. As a basic assumption, the capacity of the cross border point is the same for both export and import. However, the possible physical delivery from Germany to Denmark is depending on specific pressures in the transmission system of Northern Germany and in the Danish transmission system. The capacity figures are therefore indicative values based on assumptions of the possible pressure at the German border and the pressure necessary for delivery into the Danish transmission system. As a rule, it is not possible to nominate larger entry amounts than exit amounts. The possible physical import depends on specific pressure conditions, gas quality, and the time required to turn the physical stream, and must be further evaluated. As a basic assumption, the capacity of the cross border point is the same for both export and import. However, the possible physical delivery from Germany to Denmark is depending on specific pressures in the transmission system of Northern Germany and in the Danish transmission system. The capacity figures are therefore indicative values based on assumptions of the possible pressure at the German border and the pressure necessary for delivery into the Danish transmission system. Capacity and Reservations - Entry Ellund Capacity Nm 3 /Hour

Updated: 13 June The capacity depends on the total transport of gas in the Danish transmission system. Parts of the transmission system and some M/R stations have capacity limits. The indicated capacity is therefore an assessed value based on estimates of the pressure necessary for delivery into the Danish transmission system. The capacity depends on the total transport of gas in the Danish transmission system. Parts of the transmission system and some M/R stations have capacity limits. The indicated capacity is therefore an assessed value based on estimates of the pressure necessary for delivery into the Danish transmission system. Capacity and Reservations – Exit Zone Denmark Capacity Nm 3 /Hour The capacity is depending on the location of the off-take and the transit volumes

Updated: 13 June Daily Offtake Exit Zone Denmark Nm 3 /Day Operational data – non-fiscal data

Updated: 13 June Hourly Offtake Exit Zone Denmark Nm 3 /Hour Operational data – non-fiscal data

Updated: 13 June Daily Offtake Exit Zone Denmark Nm 3 /Day Operational data – non-fiscal data

Updated: 13 June Hourly Offtake Exit Zone Denmark Nm 3 /Hour Operational data – non-fiscal data

Updated: 13 June Daily Offtake Exit Zone Denmark Nm 3 /Day Operational data – non-fiscal data

Updated: 13 June Hourly Offtake Exit Zone Denmark Nm 3 /Hour Operational data – non-fiscal data

Updated: 13 June Daily Offtake Exit Zone Denmark Nm 3 /Day Operational data – non-fiscal data

Updated: 13 June Hourly Offtake Exit Zone Denmark Nm 3 /Hour Operational data – non-fiscal data

Updated: 13 June The physical capacity is limited by the capacity of the border station and the capacity in the the North German transmission system. It is possible to nominate larger exit volumes than the physical capacity, if the net nomination is under the physical capacity. The physical capacity is limited by the capacity of the border station and the capacity in the the North German transmission system. It is possible to nominate larger exit volumes than the physical capacity, if the net nomination is under the physical capacity. Capacity Nm 3 /Hour Capacity and Reservations - Exit Ellund

Updated: 13 June Daily Transport Exit Ellund (net) Nm 3 /Day Operational data – non-fiscal data

Updated: 13 June Hourly Transport Exit Ellund (net) Nm 3 /Hour Operational data – non-fiscal data

Updated: 13 June Daily Transport Exit Ellund (net) Nm 3 /Day Operational data – non-fiscal data

Updated: 13 June Hourly Transport Exit Ellund (net) Nm 3 /Hour Operational data – non-fiscal data

Updated: 13 June Daily Transport Exit Ellund (net) Nm 3 /Day Operational data – non-fiscal data

Updated: 13 June Hourly Transport Exit Ellund (net) Nm 3 /Hour Operational data – non-fiscal data

Updated: 13 June Daily Transport Exit Ellund (net) Nm 3 /Day Operational data – non-fiscal data

Updated: 13 June Hourly Transport Exit Ellund (net) Nm 3 /Hour Operational data – non-fiscal data

Updated: 13 June Capacity and Reservations - Exit Dragør Capacity Nm 3 /Hour The capacity will be increased

Updated: 13 June Daily Offtake Exit Dragør Nm 3 /Day Operational data – non-fiscal data

Updated: 13 June Hourly Offtake Exit Dragør Nm 3 /Hour Operational data – non-fiscal data

Updated: 13 June Daily Offtake Exit Dragør Nm 3 /Day Operational data – non-fiscal data

Updated: 13 June Hourly Offtake Exit Dragør Nm 3 /Hour Operational data – non-fiscal data

Updated: 13 June Daily Offtake Exit Dragør Nm 3 /Day Operational data – non-fiscal data

Updated: 13 June Hourly Offtake Exit Dragør Nm 3 /Hour Operational data – non-fiscal data

Updated: 13 June Daily Offtake Exit Dragør Nm 3 /Day Operational data – non-fiscal data

Updated: 13 June Hourly Offtake Exit Dragør Nm 3 /Hour Operational data – non-fiscal data