AGS pp Status Jan. 13, 2015 Time Meeting Haixin Huang.

Slides:



Advertisements
Similar presentations
AGS Status and Plans RHIC Spin Collaboration Meeting 2/4/11.
Advertisements

AGS/Booster Issues Feb. 25, 2014 Time Meeting Haixin Huang.
First Operation of MI8 Collimation Bruce C. Brown All Experimenters Meeting 22 January 2007.
APEX Report April 28-29, 2009 May 4, 2009 Fulvia Pilat Time Meeting, May
AGS PP Progress Haixin Huang Time Meeting January, 31, 2012.
AGS pp Status Feb. 6, 2015 RSC Meeting Haixin Huang.
RHIC Status Haixin Huang Time Meeting 02/1/2011. Jan. 26 Ring access for six hours to fix jet and many other jobs. Difficulty to provide 28X28 store overnight.
RHIC/AGS Polarimeter Study May 1, 2009 H. Huang, A. Zelesnki, B. Morozov.
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Thomas Roser Muon collaboration meeting February 8-10, 2002 AGS beam intensity upgrades What has been achieved Sextupole power supply upgrades Bunch manipulation.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 5 Apr 2011 Agenda: Open.
AGS pp Status Feb. 20, 2015 RSC Meeting Haixin Huang.
AGS Polarized Proton Development toward Run-9 Oct. 3, 2008 Haixin Huang.
AGS PP Progress Haixin Huang January, 3, Haixin Huang2 Daily Activities of Last Week 12/19 Difficulty to bring beam into Booster. Source only pulses.
AGS/Booster PP Setup Plan Jan. 11, 2013 RSC Meeting Haixin Huang.
AGS pp Status Mar. 17, 2015 Time Meeting Haixin Huang.
RHIC Accelerator Capability: Present and Future Mei Bai Collider Accelerator Dept. BNL.
RHIC Status Haixin Huang Time Meeting 01/18/2011.
Thomas Roser Snowmass 2001 June 30 - July 21, 2001 Polarized Proton Acceleration and Collisions Spin dynamics and Siberian Snakes Polarized proton acceleration.
AGS pp Status Feb. 17, 2015 Time Meeting Haixin Huang.
Injector PP Setup Plan and Status November 18, 2008 Haixin Huang.
Preparation for RHIC PP Run in 2011 Wednesday 20, 2010 RHIC Machine Planning Meeting Haixin Huang RUN website: RUN.
RHIC Run14 Time Meeting. Run14 Status – Apr. 29 Operations running well, 11 full stores over the past 7 days; setting STAR ZDC rates to 50 khz is now.
Overview of RHIC Injector Oct. 5, 2015 Haixin Huang MEIC 2015.
RHIC Status: Startup Run 12 V. Schoefer RHIC Spin Collaboration Meeting 1/13/12.
Managed by UT-Battelle for the Department of Energy Analysis of 2008 Beam Instability Data S. Cousineau, V. Danilov, M. Plum HB2008.
Machine status – December 28  Machine status - overview  Blue ring: ramp development  Yellow ring: obstruction update  Set-up and ramp-up.
Spin Injection June 5, 2015 APEX Meeting H. Huang, P. Oddo, V. Ptitsyn.
RHIC Run14 Time Meeting. Run14 Status – Apr. 15 Operations running well, 12 stores over the past 7 days with 1 lost to another “super quench”. Testing.
Beam-Beam and e-Cloud in RHIC Oct. 6, 2015 Haixin Huang, Xiaofeng Gu, Yun Luo.
AGS/Booster Status March 11, 2014 Time Meeting Haixin Huang.
RHIC Run14 Time Meeting. Run14 Status – Apr. 22 Operations running well, 12 stores over the past 7 days with 1 “super store” of 17 hours. Repositioned.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 12 Apr 2011 Agenda: Open.
OPPIS performances in Run-6. First 4 weeks. RSC meeting, February 10, 2006.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 14 Mar 2011 Agenda: Status – cryo/budget Experiment priorities.
RHIC Run11 Summary May 6, 2011 RSC Meeting Haixin Huang Luminosity Availability Polarization RHIC setup issues.
AGS/Booster PP Setup Status Feb. 5, 2013 Time Meeting Haixin/Vincent.
Feb. 23, 2005Wednesday Experiment Meeting BNL, Upton Status on AGS cold snake  Cold mass is now in the cryostat. It is in the phase of wiring, and because.
Preparation Status of pp Run11 Haixin Huang Time Meeting 12/21/
RHIC status Chuyu Liu Time meeting Apr. 28, 2015.
J-PARC Spin Physics Workshop1 Polarized Proton Acceleration in J-PARC M. Bai Brookhaven National Laboratory.
Booster Losses Keith Gollwitzer PIP and MI 700 kW review January 2015.
POLARIZATION MEASUREMENTS AND ABSOLUTE POLARIZATION VALUES EVOLUTION DURING PROTON BEAM ACCELERATION IN THE RHIC ACCELERATOR COMPLEX A.Zelenski, T.Roser,
AGS Run-9 Preparations, Status and Plans Dec. 16, 2008 Haixin Huang.
09-21 Study of bunch length limits Goals: To identify and observe effects which put limits on the minimum bunch length in RHIC. Try to distiguish the limitation.
Developments and Beam Studies for the Injectors APEX Workshop 2Nov06 ahrens.
RHIC Run14 Time Meeting. Run14 Status – May 27 Operations running well, 11 full stores over the past 7 days. Getting high intensity again from injectors,
RHIC Run14 Time Meeting. Run14 Status – June 24 Run14 He3-Au physics declared on 6/20 with Fill #18460; stochastic cooling is ON for Au beam, longitudinal.
Polarized Proton at RHIC: Status and Future Plan Mei Bai Collider Accelerator Dept. BNL A Special Beam Physics Symposium in Honor of Yaroslav Derbenev's.
RHIC 250 GeV Polarized Proton Run 2009 Mei Bai RUN website: 12/16/2008RHIC Spin Collaboration Meeting.
RHIC Status April 8, 2011 RSC Meeting Haixin Huang.
Run 10 Start-up Status
Haixin Huang AGS Cold Snake: Status and Plans.
MI/RR Operation Status Ioanis Kourbanis August 21, 2014.
RHIC Status Haixin Huang RSC Meeting 02/18/2011. l Fixed the blue dump kicker noise problem last Friday. l Declared physics last Friday. l Smooth run.
Thomas Roser SPIN 2006 October 3, 2006 A Study of Polarized Proton Acceleration in J-PARC A.U.Luccio, M.Bai, T.Roser Brookhaven National Laboratory, Upton,
Plan for 500 GeV Development Vadim, Mei. Goals 1.Explore polarization transmission to the 500 Gev CM energy. 2. Inspect the luminosity aspects (with 2.
AGS Polarized Proton Status January 25, 2011 Vincent Schoefer.
AGS FY11 Summary RHIC Spin Collaboration Meeting 5/6/11.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 29 Mar 2011 Agenda: Open.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 22 Mar 2011 Agenda: Open.
Injector Status Jan. 19, 2016 Time Meeting Haixin Huang.
Injector Status Feb. 9, 2016 Time Meeting Haixin Huang.
Injector Status Jan. 26, 2016 Time Meeting Haixin Huang.
MLL Workshop on Future Science 2019 and beyond, 16.Dec.2015 The accelerator, as seen by.. 1 From LBNL Image Library Collection by Dave Judd and Ronn MacKenzie.
RHIC Status Haixin Huang Time Meeting 01/25/2011.
Polarized Proton Acceleration in the AGS with Two Helical Partial Snakes October 2, 2006 SPIN 2006 H. Huang, L.A. Ahrens, M. Bai, A. Bravar, K. Brown,
Operational experience of the AGS eIPMs
LHC Morning Meeting - G. Arduini
Thursday morning – optics correction
Presentation transcript:

AGS pp Status Jan. 13, 2015 Time Meeting Haixin Huang

2 Timeline l Dec : Booster setup. l Dec : AGS setup with Westinghouse. No snake machine. l Jan. 2: switching to Siemens in the morning, setup AGS first without snakes, then with snakes. l Jan.3-4: Instrumentation (tunemeter, IPM, eIPM, polarimeter, JQ) setup. l Jan. 5-6: Confirmed spin flip signal in AGS user4 so we got polarization around 60%. l Jan.7-9: setup Booster RF with dual harmonics. Leave dual harmonics in the Booster since Jan. 9 night. Ring access on Jan. 8 fixed the F10 beam pipe problem. l Jan : setup JQ timing. It seems that the jump quads timing should be earlier than the prediction. Take measurements for polarization profile and intensity scan. l Jan.13: source maintenance, setup Au for RHIC p-A aperture check later.

Haixin Huang 3 Status l Dual harmonic RF setup has been tested in the Booster. With the h=2 cavity on for longer time (120ms), the beam seems brighter at extraction (same beam size, but more intensity). It has been used since last Friday. l Keith has taken another intensity scan (varying Booster input and checking MW006 beam size). l Several JQ timing files have been tried. It seems that the timing needs to be earlier by 0.5ms from the timing derived from energy and tune measurements. Polarization is in the low 70% with 2*10 11 intensity. l Benefit of JQ is seen: JQ on: ; JQ off ; ratio: Intensity was 1.5* l Some polarization profile measurements are done. At 2*10 11, R x = , R y = l Source maintenance today and AGS eIPM repair work is also done today.

F10 Beam Asymmetric Beam Pipe Haixin Huang 4 When we started AGS setup, a large BLM reading occurred at F12. A radial move of 15mm is required to get rid of the beam loss. A ring access was made last Thursday. It turned out that the beam pipe was asymmetric and was not installed in the correct orientation. Radiation survey also confirmed the hot spot. It was repositioned and the beam aperture problem went away.

Booster Dual Harmonic RF Cavity Haixin Huang 5 Yellow: Intensity Red: h=2 voltage Almost no loss with h=2 on.

Booster Mountain Range Haixin Huang 6 H=2 is off

Booster Longitudinal Profile Haixin Huang 7 The higher peak is with h=2 on.

AGS Flattop Vertical Polarization Profile Haixin Huang 8

AGS Flattop Horizontal Polarization Profile Haixin Huang 9

AGS Polarization Intensity Scan Haixin Huang 10 We did not scan to 3*10 11 in run13. At 3*10 11, extrapolation from run13 (up to 2.2*10 11 ) is 62%.