Broad Beach Sand & Dune Habitat Restoration Project Broad Beach Revetment Owners August 29, 2015.

Slides:



Advertisements
Similar presentations
Adobe 5 Collaborative Proposed Project Plan February 23, 2004.
Advertisements

Rivanna Water & Sewer Authority Community Water Supply Plan Update Public Meeting Monticello High School September 21, :00 pm.
1 Ocean View Shoreline Project Update Overview for Norfolk City Council January 7, 2014.
Shell Island West NRDA Restoration
1 FEMA Flood Insurance Rate Map Update FEMA Public Meeting October 22, 2009.
Clean Water Act Section 404: An O&G Perspective Andrew D. Smith SWCA Environmental Consultants.
Northeast Corridor Greenway Acquisition – Mitigation Feasibility Study Results City Council Workshop June 24, 2014.
Examples for Mitigation Category 1 and 2 Streams.
Compensatory Mitigation in Coastal Louisiana Keith Lovell, Administrator Office of Coastal Management Department of Natural Resources 10/03/121.
THE FOUR STEP SECTION 106 PROCESS: AN INTRODUCTION TENNESSEE STATE HISTORIC PRESERVATION OFFICE REVIEW AND COMPLIANCE SECTION All reproduction rights reserved.
Proposed Benefit Assessment District Overview Three Rivers Levee Improvement Authority (TRLIA) TRLIA.ORG March 10,
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Blind Pass Project Update Bayous Preservation Assoc. February 9, 2011.
Building Strong! 1 US Army Corps of Engineers Regulatory Program Kimberly McLaughlin Program Manager Headquarters Operations and Regulatory Community of.
Big Horn Lake Sediment Management Study. US Army Corps of Engineers Omaha District Study Background Bureau of Reclamation and Omaha District Interagency.
Folly Beach 1-yr Post-Construction Monitoring Report Nicole Elko, Ph.D. September 8, 2015.
Of An Evaluation of Performance Measures for Prefabricated Submerged Concrete Breakwaters: Section 227 Cape May Point, New Jersey Demonstration Project.
Beneficial Use at Deer Island A Decade of Design and Implementation Presented by Walter Dinicola, P.E., and Wendell Mears Anchor QEA, LLC George Ramseur.
Policies and Procedures for Summer Supplements on Federal Awards April
ENVIRONMENTAL OPPORTUNITIES AND CONSTRAINTS ARCHAEOLOGICAL - HISTORICAL INVESTIGATIONS PERMITTING FOR UNAVOIDABLE ENVIRONMENTAL IMPACT AREA ENDANGERED.
Marin Coastal Permit Coordination Program. Why do we need a program? Called for in Watershed Plans: As many as 9 permits to consider for restoration.
Shoreline & Waterway Management Section Regulations Governing Beach Protection and the Use of Beaches December 27, 1983 Beach – is that area which extends.
1 CEQA and CEQA-Plus Presented by Cookie Hirn, Lisa Lee, and Michelle Jones Regional Programs Unit July 2008.
Three Rivers Levee Improvement Authority June 8, 2007 Presentation to the State Reclamation Board Proposed Feather River Setback Levee.
Baird Claytor Hydroelectric Project Sedimentation Study.
Natural Gas Pipeline Permitting in Pennsylvania Mr. Andrew Paterson VP of Technical and Regulatory, Marcellus Shale Coalition August 1, | MARCELLUS.
A World of Solutions North Topsail Beach Shoreline Protection Project Phase 1 – New River Inlet Channel Realignment & Beach Restoration NC Water Resources.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Citizens Advisory.
Regional Water Availability Rulemaking Chip Merriam Water Resources Advisory Commission February 8, 2007 Chip Merriam Water Resources Advisory Commission.
Planning & Community Development Department Zoning Code Amendment Public Hearing Proposed elimination of the 50% review step from the design review process.
San Francisco Ocean Beach-Great Highway Erosion Control Project.
Northeast Corridor Greenway Acquisition Project – Design and Permitting Status Update City Council Workshop August 25, 2015.
Proposition 1 Workshop: the Grant Application Process July 2015.
UNIT 13 – Monitoring & Compliance Monitoring and Compliance UNIT 13.
UNIT 13 – Monitoring & Compliance Monitoring and Compliance UNIT 13.
Central Valley Flood Protection Board Meeting – Agenda Item No. 9A CVFPB MEETING – October 25, 2013.
Multiple Species Habitat Conservation Plan Overview and Progress Marci Henson, Program Manager August 22, 2013.
Dredged Material Beneficial Uses/Alafia Banks, Whiskey Stump Key and McKay Bay Dredge Holes August 12, 2004 Presentation to ABM.
TOPSAIL BEACH 30 Yr Beach Management Plan June 8, 2011.
US Army Corps of Engineers BUILDING STRONG ® And Taking Care Of People! Josephine Axt, Ph.D. Chief, Planning Division Los Angeles District July 10, 2013.
Planning & Community Development Department Consideration of a Call for Review Minor Conditional Use Permit #6003 (1528 Whitefield Road) City Council Meeting.
Working Towards a Sustainable Future for Broad Beach E NVIRONMENTAL NGO R ECOMMENDATIONS FOR THE P ROJECT.
Broad Beach Sand & Dune Habitat Restoration Project CCC Hearing October 9, 2015.
In-Delta Storage Program. Background and historyBackground and history Evolution of the fish screensEvolution of the fish screens Proposed Re-engineered.
After-the-Fact Conservation Area Impact Permit Request* Keene’s Pointe Community Association, Inc. District 1 November 1, 2011 *Postponed from the December.
EAST CHEROKEE DRIVE PROJECT UPDATE CHEROKEE COUNTY ENGINEERING DEPARTMENT MARCH 31, 2016.
Expanded Shave and Pave Program Roads and Parks Maintenance Department Development & Infrastructure Division October 23, 2012.
Carolina North Carolina North Annual Report for Chapel Hill Town Hall September 29, 2010.
4650 Alhambra Circle Building Site Separation. Request: The applicant is requesting consideration of a building site separation in accordance with Section.
Iron Range Tourism Bureau April 25, 2013 Hwy 53 Update.
POM & I-84/US 730 IAMPs Morrow County Planning Commission Hearing December 20, 2011.
1.  Quick Overview of the History and Need  What is Planned for the Fire Department  What is Planned for the Police Department  Financial Details.
Coastal Engineering Waterfront & Marinas Civil Engineering Regulatory Permitting Site Investigations Marine Environmental Construction Destination Development.
Broad Beach Sand & Dune Habitat Restoration Project
I-66 OUTSIDE THE BELTWAY Shrevecrest HOA JUNE 21, Susan Shaw, P. E
Project Status & Right-of-Way Acquisition
Parks and Recreation Commission
Eastern Solent Coastal Partnership
Washoe County Board of Adjustment
Continuing Authorities Program
Michigan Dept. of Environmental Quality Water Resources Division
In-Delta Storage Program
Moratorium Session 7 Oceanfront Development Proposals: December 3rd Folly Beach Planning Commission Reminder that this presentation, as well as past.
AMBASSADOR WEST – CHANGES TO APPROVED PROJECT TO RESET ENTITLEMENT TIME LIMITS (City Ventures) City Council 3/28/11.
Meadow Lake Boulevard Street Extension Project
Greater Kaweah GSA Board Meeting
Walker Street Reconstruction Project 25% Design Public Hearing
Conventional Facilities
In-Delta Storage Program
BOSTON HARBOR DEEP DRAFT IMPROVEMENT PROJECT
Presentation transcript:

Broad Beach Sand & Dune Habitat Restoration Project Broad Beach Revetment Owners August 29, 2015

Proposed Broad Beach Restoration MISSION: 1.Restore historically wide beach by adding sand and restoring dune habitat 2.Maintain buried permanent revetment for future storm protection.

Alternative 4C Highlights - Project Footprint: No nourishment west of Broad Beach Road -Revetment Alignment: Affects BB Rd -Revised Dune Plan: 3:1 ratio of dunes restored to dunes impacted -Septic Feasibility Study: Complete w/in 3 yrs of CDP -Backpassing & Nourishment Triggers: Avoid lateral access easements -Comprehensive Monitoring Plan & Science Advisory Panel: BBGHAD & CCC to share management -Requested 20 year term: 10 yr + extension?

Project Update Post 12/14: Extensive meetings with senior regulatory staff members Progress: overall Project concept, west end nourishment, revetment location and entitlement; sand source, spec, and logistics Alternative 4C: submitted 4/15 CCC hearing: anticipated 10/15 Army Corps & others: approx Fall 2015 Proposed Construction Start: Early 2016?

Beach Restoration: Photo Simulation- West

Beach Restoration: Photo Simulation- Central

Beach Restoration: Photo Simulation- Central from 31048

Beach Restoration: Photo Simulation- East

Typical Proposed Beach & Dune Cross Sections Broad Beach Road Broad Beach Road

Revetment Realignment – to Pullback contemplated since 2010 ECDP BBGHAD contested & negotiated pullback mandated by CCC/ other agencies Realignment may alter certain backyard improvements

Revetment Realignment- updated 8/28/15

Post Construction Condition Eastern End of Revetment Pulled Back Revetment Covered with Dune Plants Nourished Beach Final dune design subject to approved dune restoration plan

Existing Condition Existing 2010 Revetment As shown: Broad Beach Rd.

BBGHAD Proposed Revetment Pullback Nourished Beach Condition Pulled Back Revetment Covered with Dune Plants Nourished Beach Existing Leach Fields Future Leach Field Final dune design subject to approved dune restoration plan As shown: Broad Beach Rd.

BBGHAD Proposed Revetment Pullback Nourished Beach Condition Pulled Back Revetment Covered with Dune Plants Nourished Beach Existing Leach Fields Future Leach Fields Final dune design subject to approved dune restoration plan As shown: Broad Beach Rd.

BBGHAD Proposed Revetment Pullback Nourished Beach Condition Pulled Back Revetment Covered with Dune Plants Nourished Beach Existing Leach Fields Future Leach Fields Final dune design subject to approved dune restoration plan As shown: Broad Beach Rd.

BBGHAD Proposed Revetment Pullback Nourished Beach Condition Pulled Back Revetment Covered with Dune Plants Nourished Beach Existing Leach Fields Future Leach Fields As shown: Broad Beach Rd. Final dune design subject to approved dune restoration plan

Alternative 4C: Proposed Dune Footprint: West to Middle Area

Alternative 4C: Proposed Dune Footprint: Middle to East End

West End Nourishment Limitation Ends nourishment at Broad Beach Rd. Preserves “boulder field” between and Limits depth of cover to approximately natural conditions west of Boulder Field 31380

West End Sensitive Marine Resources Broad Beach Rd 21

Summary of West End Analyses GOAL 1: Natural sedimentation levels determined - Spring accumulation varies up to 3 feet - Fall accumulation up to 5 feet GOAL 2: Project-related sand transport & burial determined - 3D mapping used to quantify Project burial exceeding natural levels GOAL 3: Impacts to sensitive resources analyzed - No predicted impact to eelgrass and kelp - Impacts to surfgrass predicted to be less than significant - Impacts to lower intertidal boulder field predicted to be less than significant - As expected, beach nourishment project adds sand to upper intertidal and sandy habitats

Septic System Study Proposed Compromise: 2 years after CDP becomes effective Implementation based on findings: 6+ yrs

Proposed Backpassing & Renourishment Triggers ActivityTriggered when… BackpassingWest end beach less than 75’ for 3 months and sufficient sand at east end to backpass: likely 1-2x per 5 years Interim Nourishment West end beach less than 30’ for 6 months Add up to 75,000 cy: proposed assessment funds no more than 3 per 5 yrs. Avoid summer placement Discretionary Erosion Nourishment Less that 10’ dry beach width fronting revetment Place at least 75,000 cy / avoid summer placement Not discretionary – GHAD commits to keep minimum 10’ beach width fronting revetment instead of providing lateral access easements landward of revetment Maximum 3 erosion nourishments within 10-yr period

BBGHAD’s Proposed Monitoring Resource Monitoring During Construction Adaptive Management and Monitoring Dune Habitat Restoration and Monitoring Plan Long-term Marine Resources Monitoring, Reporting, and Mitigation Plan Public Access Management Program Science Advisory Panel ("SAP“) Cost: Approximately $3M/10 years

Beach Width Monitoring “Transects”

Primary Remaining Issues With CCC 1.Revetment Alignment & Duration 2.Dune footprint 3.Scope of public/lateral access 4.Permit term 5.SAP Details 6.Sand specification

Moving Forward 1.Revised Engineer’s Report- Board adopted July 2015; Resolution No. 2015/03 2.Proposed New Assessment: $595/linear foot; 25% for those west of Property Owners’ vote on new assessment: ends 9/6/15 at 9:00 a.m. 4.Construction Schedule: Early 2016?

END

Predicted Westward Sand Transport After 75,000 cy “Interim Nourishment”