Protecting Communities Task Team Update Las Vegas January 14, 2009.

Slides:



Advertisements
Similar presentations
Museum Presentation Intermuseum Conservation Association.
Advertisements

Click here to add text Click here to add text. Joint Informational Meeting Cornelius Road Area Presented by Iredell County and the Town of Mooresville.
Increasing Pipeline Safety Through Shared Planning Transmission Pipelines and Land Use: What needs to be accomplished and why? General Session --- November.
The State of Natural Gas Pipelines in Fort Worth.
July 15, 2008 – GB Work Session Discussion of Mayor Thomas E. Swisstack’s Priority List Recommendations.
Residential Development in Rural Lands Study STEERING COMMITTEE 7 February 15, 2006.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Presentation to NACo Environment, Energy and Land Use Steering.
Facilities Management Post Hurricane Building Assessment and Recovery June 28, 2007.
Springs Protection Options Septic System Evaluation Program Board of County Commissioners Meeting November 13 th 2012.
Federal Agency Update – January 2009 Pipelines & Informed Planning Alliance (PIPA) Communications Task Team Status Danny Gibbs Spectra Energy / INGAA It’s.
113 East College Avenue, Suite 200 Tallahassee, Florida
Health and Safety - an update Ian Gillett Safety Director.
Increased Pipeline Safety Through Shared Planning Pipeline Safety Trust Conference New Orleans, LA November 15, 2007.
Overview the local, state, and federal regulatory authorities which affect the interim housing mission Identify vital stakeholders with regulatory authority.
Interstate Natural Gas Association of America INGAA Action Plan to Build Confidence in Pipeline Safety INGAA Integrity Management Continuous Improvement.
Operational Fire fighting Social Perspective Disaster Planning Perspective Fire Behaviour Perspective Planning Design Perspective Building Design Perspective.
LOCAL GOVERNMENT TOOLS Jim Doherty Municipal Research & Services Center November 2006.
Roles and Responsibilities Local Agencies and Responders.
Model Urban Pipeline Initiative Panel Discussion Karen Edelstein Eastern Program Coordinator FracTracker Alliance Mayor’s Council.
Event Name/Date Presented by: Name/Title/Organization Pipelines and Informed Planning Alliance (PIPA)
Pipelines and Informed Planning Alliance A Real Estate Symposium International Right of Way Association/Appraisal Institute Las Vegas, NV January 13-15,
Pipelines and Informed Planning Alliance Protecting Transmission Pipelines International Right of Way Association/Appraisal Institute Las Vegas, NV January.
Rapid Assessment A quick evaluation of a disaster/emergency impacted area.
Firefighter III Introduction Mod A Identify the Firefighter III’s role as a member of the organization. (4-2.1) The role of a firefighter III.
PC Meeting July 1, 2015 CUP 15-02/DR 15-06/DR
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Harold Winnie, CATS Manager (Central Region) Leak detection for.
Module 3 Develop the Plan Planning for Emergencies – For Small Business –
Practical Information on Crisis Planning: A Guide for Schools and Communities U.S. Department of Education August 2004.
Session 131 A community profile provides a base for overlay analysis and for discussing a hazard’s impacts on a community.
Pipelines and Informed Planning Alliance (PIPA) Pipeline Safety Trust Conference November 16, 2007 New Orleans, LA Presented by Jerry Kenerson.
U. S. Department of Transportation Pipeline and Hazardous Materials Safety Administration
Julie Halliday, Program Development DOT – PHMSA – OPS November 18, Pipeline Safety Trust Conference Pipeline Safety – Getting to Zero Pipeline.
Consultation zones To ensure communication using guidance from the Pipelines & Informed Planning Alliance (PIPA) Pipeline Safety Trust Conference Nov 4-5,
Lessons Learned….. Were PG&E practices an anomaly or the tip of a bigger problem? How would we know? 2011 Pipeline Safety Trust Conference – Getting to.
1 DCP Midstream 2008 School Campaign Jeannette Jones November 21, 2008 Pipeline Safety Trust – 2008 Conference New Orleans, LA.
VIRGINIA’S IMPLEMENTATION of the FINAL RULE on WORK ZONE SAFETY and MOBILITY Virginia Department of Transportation’s Instructional and Informational Memorandum-LD-241.
Watershed Protection & CodeNEXT Austin Neighborhoods Council March 25, 2015 Watershed Protection & CodeNEXT Austin Neighborhoods Council March 25, 2015.
WATER, WATER EVERYWHERE? The Water Resources Management Committee of the American Public Works Association.
La Center, Washington: Balancing Pipelines and Populations 1.
Technical Assistance Grants to Communities Pipeline Safety Trust Conference New Orleans November 20, 2008 Steve Fischer PHMSA/Office of Pipeline Safety.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Regulatory and Compliance Landscape Western Region Gas Conference.
Protecting Communities Co-Chairs Cathy Pratt- City of St. Peters Greg Ford- Williams Gas Pipeline;INGAA.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Pipelines and Informed Planning Alliance (PIPA) Steve Fischer.
Pipelines & Land Use Planning Tim Sweeney Pipeline Safety Trust Conference New Orleans November 3,
Community Development Department FUTURE LAND USE MAP AMENDMENT SMALL-SCALE LU-MIN & ZONING MAP AMENDMENT RZ-OTH
Planning Zones to Protect People Near Pipelines Chuck Lesniak City of Austin Watershed Protection Department.
Pipeline Safety & Development Changes File # ZON Proponent Carl Weimer, Whatcom County Council Docketed Unanimously by the Whatcom County Council.
Regulatory Framework for Uranium Production Facilities in the U.S.
GIS and Urban Planning TransportationZoningUtilities Zoning is the process of categorizing land tracts according to their intended use. Common types of.
Pipeline Safety Trust National Pipeline Safety Conference New Orleans, LA An Overview of the Pipelines and Informed Planning Alliance (PIPA) Report November.
U. S. Department of Transportation Pipeline and Hazardous Materials Safety Administration
U. S. Department of Transportation Pipeline and Hazardous Materials Safety Administration
City of Santa Rosa Hazard Mitigation Plan Project Kickoff.
PROTECTING TRANSMISSION PIPELINES Protecting transmission pipelines is protecting the public -
An ordinance amending the County’s zoning and land use regulations to increase pipeline safety Adopted July 27, 2010.
Pipeline Safety – 2015 Year in Review. Large PHMSA Budget Increase Pipeline Safety spending in 2015 was increased $26.9 million. Main areas of expansion.
Ordinance Amending Chapter 37 Orange County Code Utilities Department October 21,
Public Awareness Programs for Pipeline Operators WESTERN REGIONAL GAS CONFERENCE August 21, 2007 Presented by: Ross Reineke.
Kitsap County ▪ Jefferson County ▪ City of Bremerton Naval Base Kitsap ▪ Naval Magazine Indian Island
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Pipeline Standards and Rulemaking Division: Regulatory Initiatives.
Tom Lenart & John Field CT DEMHS Region 2.  Department of Emergency Services and Public Protection (DESPP)  Commission on Fire Prevention and Control.
Restoring Trust in Pipeline Safety Katie Hansen, Board of Directors Pipeline Safety Trust.
Energy Policy Act – 2005 West-Wide Energy Corridors.
Jim Doherty MRSC Legal Consultant
LOCAL GOVERNMENT TOOLS Jim Doherty Municipal Research & Services Center, Seattle November 2007.
U. S. Department of Transportation Pipeline and Hazardous Materials Safety Administration
Urban Street Design Standards Overview of Project and Details
Land Use and Zoning Committee Special Workshop
OHS Staff Introduction Training
WATER, WATER EVERYWHERE?
Presentation transcript:

Protecting Communities Task Team Update Las Vegas January 14, 2009

 Received approximately 300 s  Participated in 17 conference calls.  Attended 3 team meetings ◦ January 14-17, 2008 in Washington, D.C. ◦ June 10-12, 2008 in Austin, TX ◦ July 8-11, 2008 in Kansas City, MO

Update on PHMSA’s Pipeline Informed Planning Alliance Initiative (PIPA)  PHMSA held a Steering Committee Conference Call August 1, 2007 on its Pipeline Informed Planning Alliance (PIPA).  On November 15th & 16 th, 2007 the Pipeline Safety Trust held a pipeline safety conference in New Orleans. The conference focused on various right-of-way topics related to safety and the formation of the PIPA initiative.  PHMSA held a Steering Committee Conference call during the second week of December, 2007 to review the status of registration, guidance for the Task Teams, and Plenary session topics.  PHMSA was planning the PIPA Plenary Meeting and initial Task Team meetings in DC during January 15-17,  The proposed teams are : ◦ Task Team 1 ( Limit Encroachment ) ◦ Task Team 2 ( ROW Best Practices ) ◦ Task Team 3 ( Risk-Informed Assessment & Communication )

 What should pipeline safety stakeholders do, or avoid doing, adjacent to the pipeline ROW to reduce the risk to communities?  Role of Setbacks to protect pipelines from damage during, and after, development  Role of enhanced building codes  Model Ordinances, Planning Policies, and State Legislation  “Takings” caused by local government restrictions on development adjacent to the ROW

 Defining acceptable, and unacceptable, types of development adjacent to transmission ROW.  Using enhanced building codes for structures adjacent to transmission ROW.  Simple, risk-informed guidance for the above 2 statements. This guidance should be based on attributes of both the pipeline and the proposed development.  Model Ordinances, Planning Policies, Regulations, or State Legislation incorporating or promoting any of these best practices.

 Individual Task Teams should pursue the goals described for each team, not attempt to address detailed recommendations in the TRB report.  Task Team decisions should be by consensus. All those present should participate in discussions, but only those officially representing a participating organization will vote.  Although the goal is unanimity, consensus does not require unanimity, but rather concurrence by a preponderance of voting members that they support the decision or resolution of the issue. Non-concurring members should be able to live with the decision or resolution of the issue.  Organizations represented by Task Team members must be willing to support the final product of the team’s efforts.  Team members should participate with an open mind and in the spirit of the consensus process. Personal and organizational agendas should be left behind.  Communication among Task Teams is important; as desired by the Chairperson, PHMSA and Cycla staff can serve as liaison to interact on issues of common interest with other teams.  If organization representatives are substituted on a Task Team or new organizations join the Task Team, previous decisions made by the team are not to be revisited unless by consensus of voting members of the team.  Guidance and best practices resulting from the PIPA effort do not necessarily need to apply in every situation, but rather need to be clear enough that land use decision makers can select those they wish to apply.

 Title: Pipeline Operator and Authority Regulating Development Communication  Statement of Practice: The pipeline operator should provide information regarding transmission pipelines to the authority having jurisdiction for regulating development.

 Title: Land Owner/Developer and Pipeline Operator(s) Communication  Statement of Practice: Land Owner/Developer and Pipeline Operator(s) should communicate for all new development within the consultation zone around a pipeline.

 Title: Emergency Response Plans  Statement of Practice: Emergency response plans should be incorporated into land use development within the planning zone to mitigate the impact of a potential pipeline incident affecting the community.

 Title: Residential, Mixed-Use, and Commercial Land Use  Statement of Practice: Buildings within the planning zone should be designed to mitigate the impact of a potential pipeline incident.

 Title: Parking Lots and Parking Structures  Statement of Practice: Parking lots and parking structures should be located and designed to mitigate the impact of a potential pipeline incident.

 Title: Roads  Statement of Practice: Roads and associated appurtenances should be designed to reduce the risk of a potential pipeline incident.

 Title: Trees/Vegetation  Statement of Practice: Trees and vegetation should be located to reduce the potential of interference with pipeline maintenance and inspections and to reduce the risk of a pipeline incident.

 Title: Excavation and blasting potentially affecting the transmission pipeline  Statement of Practice: Excavations must not affect the stability of or lead to movement or settling of the transmission pipeline.

 Title: Individual Water Supply (water wells), Small Public Water Systems, and Individual Sanitary Disposal Systems (septic tanks and leach or drain fields)  Statement of Practice: Individual water supplies and sanitary disposal systems should be located to reduce the potential of interference with pipeline maintenance and inspections and to reduce the risk of a pipeline incident.

 Title: Industrial Land Use  Statement of Practice: Heavy Industrial Land Use should be designed and site emergency response plans developed to reduce the risk of escalation from a potential pipeline incident.

 Title: Institutional Land Use  Statement of Practice: Health care, day care, detention and correctional facilities, educational occupancies, and other potentially difficult to evacuate facilities should be constructed or located to mitigate the impact of a potential pipeline incident and should have emergency plans for potential pipeline incidents.

 Title: Police stations, HAZMAT response, fire departments, fire and rescue, emergency communications facilities, and other emergency responder facilities.  Statement of Practice: Police stations, HAZMAT response, fire departments, fire and rescue, emergency communications facilities, and other emergency responder facilities should be constructed or located to mitigate the impact of a potential pipeline incident and should have emergency plans for potential pipeline incidents.

 Title: Places of Public Assembly (Identified sites)  Statement of Practice: Amusement parks, stadiums, amphitheatres, highway rest stops, and other places of potential large public assembly should be constructed or located to mitigate the impact of a potential pipeline incident and should have emergency plans for potential pipeline incidents.

 Title: Utilities and Related Infrastructure  Statement of Practice: Utilities (both above and below ground) and related infrastructure should be designed to reduce the potential of interference with pipeline maintenance and inspections and to reduce the risk of a pipeline incident.

 Title: Storm water, irrigation water, and drinking water management facilities, retention ponds, and other above-ground water management infrastructure  Statement of Practice: Storm water, irrigation water, and drinking water management facilities, retention ponds, and other above-ground water management infrastructure should be designed and located to reduce the risk or mitigate the impact of a pipeline incident.

 Title: Residential, Mixed-Use, and Commercial Land Use near above-ground pipeline facilities, such as compressor stations, pumping stations, odorant equipment, regulator stations and other pipeline appurtenances.  Statement of Practice: Consider noise, odor and other issues when planning developments near above-ground pipeline facilities, such as compressor stations, pumping stations, odorant equipment, regulator stations and other pipeline appurtenances.

 Practice Title: Siting New Pipelines in or adjacent to Existing Rights of Way  Practice Statement: Decisions on routes for new pipelines should include coordination with local governments along the routes, including consideration of existing or adjacent pipeline rights of way and other utility rights of way.

Practice Title: Consultation Zone Practice Statement: Landowners/developers should initiate consultation with pipeline operators when development is planned on property within a Consultation Zone.

Practice Title: Planning Zone Practice Statement: The Planning Zone is an area within a Consultation Zone centered on a transmission pipeline. The Planning Zone width should be determined by the specific characteristics of the pipeline and local land characteristics (topography, environmental conditions, etc.). Recommended practices for protecting communities near transmission pipelines (other than consultation, see practice “Consultation Zone”) should be implemented for development within the Planning Zone around a pipeline.

Bill No. ORDINANCE NO. AN ORDINANCE PROVIDING FOR MINIMUM REQUIREMENTS PERTAINING TO LAND USE, CONSTRUCTION, AND PUBLIC SAFETY NEAR GAS TRANMISSION AND/OR HAZARDOUS LIQUID TRANSMISSION PIPELINES WITHIN THE CITY