Ray Thompson Manchester Xmas Meeting 20/21 Dec 06 Ray Thompson, Julian Freeston, Andy Elvin WP4 aims: look at Mechanical/Thermal/ Assembly issues Utilise.

Slides:



Advertisements
Similar presentations
SiW ECAL R&D in CALICE Nigel Watson Birmingham University For the CALICE Collab. Motivation CALICE Testbeam Calibration Response/Resolution MAPS Option.
Advertisements

Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
Vanel Jean-Charles LLR – IN2P3 08 / 12 / 2004 : Calice Meeting Desy ECAL prototype status Calice ECAL Prototype Status Silicon sensors : Production Reception.
CALICE Dave Bailey. Aims and Objectives Develop the technology to build a high- resolution tracking calorimeter for ILC experiments Main thrusts: –Testbeam.
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
ATLAS Module building at Glasgow
0ATLAS Pixel Mechanics meeting at LBNL 13 April 2000 P.Netchaeva, INFN/Genoa Study of bump stresses The aim of this study is to check the effect of stresses.
Mechanical Status of ECAL Marc Anduze – 30/10/06.
LHC Experiments at Liverpool E2V Visit – Nov 2005 Introduction Si Technology Upgrade/Maintenance Summary.
RAL, 25-Jan-2005Nigel Watson / CCLRC-RAL PPD CALICE Calorimetry for LC  Physics motivation  Calorimetry  Design Considerations  CALICE  Status  Future.
1 CMS week 15/03/05, Module Production Meeting, Dean White - UCSB Status of Sensor Bias Connection Dean White For the US CMS Group.
27 th May 2004Daniel Bowerman1 Dan Bowerman Imperial College 27 th May 2004 Status of the Calice Electromagnetic Calorimeter.
CALICE: WP4 Thermal and Mechanical Roger Barlow Cambridge 10 September 2005.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 1 CALICE Summary of 2006 testbeam for the ECAL Anne-Marie MAGNAN Imperial College London.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
Bump Bonding Requirements for Nuclear Physics Ian Lazarus Nuclear Physics Group STFC Daresbury Laboratory.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
The BTeV Tracking Systems David Christian Fermilab f January 11, 2001.
Marc Anduze – 09/09/2008 News on moulds and structures CALICE meeting - Manchester.
D. Lissauer, BNL. 1 ATLAS ID Upgrade Scope R&D Plans for ATLAS Tracker First thoughts on Schedule and Cost.
Fabian Hügging – University of Bonn – February WP3: Post processing and 3D Interconnection M. Barbero, L. Gonella, F. Hügging, H. Krüger and.
LHCf Arm2 – status of hardware upgrade in Firenze Lorenzo Bonechi 20 December 2013.
LPNHE activities Contribution in the development of an assembly line for highly granular calorimeters with semiconductor readout Gluing robot system Metrology.
Marc Anduze – 09/09/2008 Report on EUDET Mechanics - Global Design and composite structures: Marc Anduze - Integration Slab and thermal measurements: Aboud.
SiD Concept – R&D Needs Andy White U. Texas at Arlington SiD Concept Meeting LCWS06 Bangalore, India March 11, 2006.
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
Cristina Lo Bianco - LLR Cosmics test for the W-Si prototype (CALICE) Why the test in cosmics? The cosmics test-bench DAQ for the cosmics test-bench All.
Montpellier, November 12, 2003Vaclav Vrba, Institute of Physics, AS CR 1 Vaclav Vrba Institute of Physics, AS CR, Prague CALICE ECal Status Report.
Low mass carbon based support structures for the HL-LHC ATLAS pixel forward disks R. Bates* a, C. Buttar a, I. Bonad a, F. McEwan a, L. Cunningham a, S.
Ray Thompson Calice meeting UCL 6 Mar 06 WP4 aims: look at Mechanical/Thermal/ Assembly issues effort weighted to latter end of period Glue Assembly WP4.
Silicon /pcb assembly R Thompson, J Freestone LAL 3 June 08.
The LHCb Outer Tracker Front End, what does it look like and what is the status Talk for the LHCb Electronics Working Group /TS A Collaboration.
Andy Blue Glasgow Update. Andy Blue WP3 Meeting Summary ESD Protection –Part all arrived and installed Compressed Air Controls –New lines and panel being.
FPIX pixel module assembly Kirk Arndt on behalf of US CMS Pixel Mechanics R&D at Purdue and Fermilab.
EUDET JRA3 ECAL and FEE C. de La Taille (LAL-Orsay) EUDET status meeting DESY 10 sep 2006.
24 Mar 2009Paul Dauncey1 CALICE-UK: The Final Curtain Paul Dauncey, Imperial College London.
Ray Thompson Calice meeting Mar 07 Ray Thompson WP4 aims: look at Mechanical/Thermal/ Assembly issues Utilise Atlas SCT experience effort weighted to latter.
Accelerators and other things Roger Barlow Manchester Christmas Meeting 2005/6.
EUDET JRA3 ECAL in 2007 : towards “The EUDET module” C. de La Taille IN2P3/LAL Orsay.
Low Mass Rui de Oliveira (CERN) July
Hybrid Mechanical/Thermal Design Ray Thompson / Manchester FP420 meeting Torino 11/12 July 06.
David Bailey Gluing. Silicon /pcb assembly Previously Using Sony Robot and precision dispenser Have established acceptable glue dot parameters Dot electrical.
Possible types of module Si/W CALORIMETER CONCEPT Si/W CALORIMETER CONCEPT G.Bashindzhagyan Moscow State University June 2002 Internal structure (not in.
Rutherford Appleton Laboratory Particle Physics Department G. Villani CALICE MAPS Siena October th Topical Seminar on Innovative Particle and.
The Development of the Fabrication Process of Low Mass circuits Rui de Oliveira TS-DEM.
CALICE collaboration CALICE collaboration J-C BRIENT LCWS02 – Jeju Island The CALICE –ECAL Silicon - V. Vrba Very FE - S. Manen Readout/DAQ - P. Dauncey.
Hybrid Mechanical/Thermal Design FP420 Ray Thompson Julian Freestone, Andy Elvin.
July 7, 2008SLAC Annual Program ReviewPage 1 Silicon Tracking / Silicon Readout R&D Richard Partridge SLAC / Brown.
Marc Anduze – CALICE Meeting – KOBE 10/05/07 Mechanical R&D for Technological EUDET ECAL Prototype.
5 May 2006Paul Dauncey1 The ILC, CALICE and the ECAL Paul Dauncey Imperial College London.
RD program on hybrids & Interconnects Background & motivation At sLHC the luminosity will increase by a factor 10 The physics requirement on the tracker.
FP420 Hybrid Mechanical Design Ray Thompson / Manchester Manchester Xmas O7 Ray Thompson Julian Freestone, Andy Elvin.
PIXEL 2000 P.Netchaeva INFN Genova 0 Results on 0.7% X0 thick Pixel Modules for the ATLAS Detector. INFN Genova: R.Beccherle, G.Darbo, G.Gagliardi, C.Gemme,
Marc Anduze first drawings of Ecal eudet module COPIED FROM : Marc Anduze PICTURES FROM : CALICE/EUDET electronic meeting – CERN – 12 July 07.
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
EUDET Extended SC SiW Ecal 1 SiW Ecal EUDET Module - General Schedule - Development of Different Components - (Towards) a working prototype Roman.
EUDET Annual Meeting SiW Ecal 1 SiW Ecal EUDET Module - General Schedule - Development of Different Components - (Towards) a working prototype Roman.
Si Sensors for Additional Tracker
Berkeley status Aug 10th, 2012.
T. Bowcock University of Liverpool
ICHEP02 Chris Parkes ALICE m2 Pixels+Drift+Strips LHCb m2
ECAL EUDET MODULE Summary talk
CALICE: Thermal, Mechanical and Assembly issues
detector development readout electronics interconnects bump bonding
ECAL project in the future 2-3 years
Hybrid Mechanical/Thermal Design ideas
prototype PCB for on detector chip integration
WP4 Dave Bailey 5th May 2006.
Possible types of Si-sensor: SILICON CALORIMETRY FOR A LINEAR COLLIDER G.Bashindzhagyan, Il Park August Silicon sensor.
Presentation transcript:

Ray Thompson Manchester Xmas Meeting 20/21 Dec 06 Ray Thompson, Julian Freeston, Andy Elvin WP4 aims: look at Mechanical/Thermal/ Assembly issues Utilise Atlas SCT experience effort weighted to latter end of period conducting Glues Assembly concepts Calice WP4

30 layer Test beam Prototype 10k channels Conections to Silicon via Conducting Glue blobs silicon - 1 cm2 pixels Silicon tungsten layers Marc Anduze, LAL

Conducting Glue - wildly exciting. Ray Thompson Manchester Xmas Meeting 20/21 Dec 06 But you should see people panic when production faults start Are small no of faults the thin end of a long wedge? Silicon detectors expensive and irrecoverable Atlas Barrel Detector mounting Brackets glued to Carbon Fibre cylinder - CMS Tracker modules - Conducting Glue Bias connection to backplane Tony Affolder,UCSB Increasing glue resistance 1 month

Literature search Electronics industry experience Other Experiments - small no of tried glues Conducting Glues Silver filled 2 part epoxy ( no mass loss no voids) Ag has high conductivity, Silver oxide conducts realise conductivity ~1/1000 solid Ag -interconecting particles choose particle size, viscosity,,cure temp EPO-tek 4110 Areas of interest - resistance aging Interface problems oxide layer at Al/Ag interface Production wafers old CTE mismatch Si /PCB - glue flexible Glass transition temp CTE change 50 x10-6 to 150 x10-6 Corrosion/electro chemistry – Ok for N2 atmosphere Glue effects on wafer passivisation

Resistance measurements Keithley 2000 DVM or 236 SMU Labview Glue test set up Ray Thompson Manchester Xmas Meeting 20/21 Dec 06 Glue Robot 3x3 3mm square pixels Standard 6X6 10mm square pixels Prague wafers Programmable Environmental chamber

Ray Thompson Manchester Xmas Meeting 20/21 Dec 06 Pc board / gold Resistance snake Tests  R 0.1 ohm/50 dots pcb Silicon pads Thermal Cycling 20—70 deg 1 deg/min

This years deliverable - Glue problem Study - Written up Test set Up - Thermal Cycling Spring. Continuing with Prague samples Start Assembly concept studies Start thinking about on pick and place techniques for assembling detector planks Look at/ exploit existing stuff CMS/Atlas experience Generalised concept of a gantry with interchangable tools pattern recognition software Ray Thompson Manchester Xmas Meeting 20/21 Dec 06 Where now ? Interchangeable Vacuum pickup tool 