Logistics for airports:  Flights are usually planned so that shortages of fuel do not come into play.  The logistics officers are thoroughly informed.

Slides:



Advertisements
Similar presentations
Airline Schedule Optimization (Fleet Assignment I)
Advertisements

WAREHOUSING MANAGEMENT
WAREHOUSING MANAGEMENT
THE CONTEXT OF LOGISTICS. Cycle of Supply and Demand Customers Other Inputs Other Outputs Operations Demand for Products Supply of Products passed to.
Logistic Management Warehousing
ATC Dispatch, Inc. Bonded Public Warehouse Container Freight Station Secured Aircargo Transfer Station.
Physical Distribution Marketing Co-Op. What is Physical Distribution? The key link between a business and its customers – also known as logistics.
TRANSPORTATION & EMERGENCY PREPAREDNESS CHECKLIST National Resource Center for Human Service Transportation Coordination (NRC)
Materials Management Systems
Warehousing Management
PROVIDE ARRIVAL AND DEPARTURE ASSISTANCE
Supply Chain Management
Supply Chain Operations: Making and Delivering
Cross-Docking Distribution Center (DC)
Supply Chain Logistics Management
Lean Six Sigma: Process Improvement Tools and Techniques Donna C. Summers © 2011 Pearson Higher Education, Upper Saddle River, NJ All Rights Reserved.
PHYSICAL DISTRIBUTION. Logistics & Supply Chain Logistics Component parts & Raw material In-process inventory Finished goods Supply Chain.
Essentials of Marketing 13e
ROHINI PACKERS AND MOVERS India’s No.1 Packing Moving Company.
WAREHOUSE MANAGEMENT Industrial Logistics (BPT 3123)
Product layout Assembly-line balancing approach. 2 Facility layout Process terminology Cycle time: Average time between completions of successive units.
LOGISTICS OPERATION Industrial Logistics (BPT 3123)
Route Planning and Evaluation
For use only with Perreault/Cannon/ McCarthy texts, © 2009 McGraw-Hill Companies, Inc. McGraw-Hill/Irwin Chapter 12 Distribution Customer Service and Logistics.
UNHCR/e-Centre/InterWorks - Emergency Management Training
Transportation Infrastructure
1 utdallas.edu/~metin Managing Transportation in a Supply Chain Chapter 13.
LOGISTICAL OPERATIONS INTEGRATION l When LM is highly integrated and positioned as a core competency, it can serve as a standpoint for gaining a competitive.
Chapter 3: Project Management Omar Meqdadi SE 2730 Lecture 3 Department of Computer Science and Software Engineering University of Wisconsin-Platteville.
Supply Chain Management AN INITIATIVE BY: VAINY GOEL BBA 1 MODI COLLEGE.
ORF Electronic Commerce Spring 2009 April 6, 2009 Week 9 Supply Chain Management Can’t talk about e-commerce without discussing the process by which.
Distribution Customer Services and Logistics
OPSM 301 Operations Management
Logistics McGraw-Hill/Irwin
Logistics Management CHAPTER ELEVEN McGraw-Hill/Irwin Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved.
Logistic Management Made by: Made by: Kritika chhatwal Kritika chhatwal.
Course of MT- 362 Material Handling Lecture # 3.
Pre-Arranged Transportation. PDX GT Facts Ground Transportation office – one contract administrator Commercial Roadway and Hold Lot managed by contractor.
Route and Network Planning
An Introduction to Transportation Systems
Materials Management Systems
11DSCI4743 Physical Distribution Definition Physical distribution is the movement & storage of finished goods from the end of production to the customer.
Module 3: Getting Products To Market
Northeast Colorado All Hazards Region 1 Mass Casualty Incident Plan Training Section 8 – Roles & Responsibilities.
Introduction Transportation is necessary to:
Stuck Flying Standby. Have you ever flown standby? What are some of the reasons that people would fly standby?
© Copyright 2008 United Parcel Service of America, Inc. All rights reserved. Synchronizing Global Freight May 29, 2008.
Chapter 11 Distribution Customer Service and Logistics Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without.
DISTRIBUTION Distribution can be defined as an operation, or a series of operations, which physically bring goods manufactured or produced by any particular.
 Our system supplies the data and manuals that an airline needs to fly -- at the maximum levels of safety, security, and efficiency -- based on The system.
Conducting Tour. Learning Objectives To understand the role of a tour manager. To know the basic on-tour routines. To know how to handle some of the common.
 OPENED 1990  Original and Long Term Customers  25 year record of financial stability  ASSET BASED  EXCELLENT D&B.
MRP (Material Requirement Planning) The main function of material requirements planning is to ensure material availability on time. MRP helps monitor the.
Introduction to Warehousing Supply chain and stock control.
Topic 4 Warehouse Management with OHS Procedures
Courier Service Providers in UAE | Courier Companies in UAE
Transportation, Distribution, & Logistics Careers
Level Two Supply Chain Management
Material handling Defined as the art and science of moving, packing and storing of substances in any form. Creation of time and place utility Movement.
LOGISTICS NETWORK.
Want A Cheap Alternative For Transportation? Try Ocean Freight
Contact Frontier Airlines Contact Number To get resolved all issues with Frontier Airlines Flight Bookings.Frontier Airlines Contact Number
Supply Chain Management
Topic 6 – Logistics and Supply Chain Management
Air & Ground Ambulance Coordinator
Logistics in Marketing
Physical Distribution
Internet of Things in logistics
Warehousing Management
Physical Distribution Definition
Presentation transcript:

Logistics for airports:  Flights are usually planned so that shortages of fuel do not come into play.  The logistics officers are thoroughly informed about the present, projected and available fuelling stations.  Airlines cooperate with other humanitarian actors to establish and identify alternative fuel sources.  Most airlines choose not to use those airfields rarely used especially if their distance from operations’ base is big.  Cargo aircraft schedules are issued within an agreed time in advance.  In the case of limited vacant space, the management prioritizes but mainly works on the first come first served basis.  The reservation office makes timely notifications regarding the status of cargo reservation.  There are timely notifications of customers on known delays, change of cargo schedule or cancellations.  The cargo is required to be delivered to the dispatch office an agreed number of days before departure.  Passenger check in is always carried out at the airport unless otherwise informed.  There are check-in deadlines which are put in place.  Stand-by passengers are allocated seats on a first come first served basis.  The passenger lists and tickets are supposed to be ready before start of check-in.

Transportation of overnight parcels:  Regular movements which happen on routine are planned on the outset.  Non-routine movements are however planned as the need arises.  The movements are planned by a transport office. It determines the appropriate routing for the parcels and allocate resources. They also inform the destination of the estimated delivery time.  when scheduling and route planning, there should be maximum vehicle payload, maximum utilization, minimum distance and minimum time. It meets customer requirements regarding cost, service and time, also meeting legal requirements.  The parcels are picked up on time as per arrangement on time and space.  During the transportation of the parcels, the transport officers track the vehicle or vessel of transport. They maintain constant contact with the drivers and the clients and update them on the movements. The officers also deal with any issues that arise and manage the transporting staff.  The information flow is critical to ensure the safety of goods.

Logistics for timely constant inventory:  An order is first made by the merchandiser. Upon receiving the order, the manufacturer processes the order by calculating the cost of transport, estimating the speed of transportation and evaluating the consistency with which they can supply the merchandiser in terms of the number of trips that require to be taken for transportation.  Then there is warehousing, where the goods are first stored awaiting to be picked for transportation, during this, the goods are properly packaged as per requirement. The whole stage involves material handling. The goods are moved, stored, sorted and assembled to suit the customers’ order requirements. This risks product damage.  Facility network design then comes in to determine the number, location and ownership arrangement. A structure is created from which logistics operations are performed.  Upon the assigned time, the goods are transported from the manufacture’s warehouses to the merchandiser hence ensuring constant inventory delivered in time.

Reference Saldanha, J. P. (2006). Choosing the Right Information Coordinating Mechanism for the International Ocean Shipping Process. New York,USA: ProQuest. Simchi-Levi, D. (2007). The Logic of Logistics: Theory, Algorithms, and Applications for Logistics and Supply Chain Managemen. New York,USA: Springer Science & Business Media.