Preparation for RHIC PP Run in 2011 Wednesday 20, 2010 RHIC Machine Planning Meeting Haixin Huang RUN website: RUN.

Slides:



Advertisements
Similar presentations
1 RHIC – p+p and p+Au projections for March 2014 STAR meeting.
Advertisements

AGS pp Status Feb. 6, 2015 RSC Meeting Haixin Huang.
RHIC Status Haixin Huang Time Meeting 02/1/2011. Jan. 26 Ring access for six hours to fix jet and many other jobs. Difficulty to provide 28X28 store overnight.
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
RHIC polarized protons – The next decade – Wolfram Fischer 14 May 2010 RSC Meeting, Iowa State University.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 5 Apr 2011 Agenda: Open.
Nov. 17, 2005Fermi Lab AP Seminar AC Dipole Based Diagnostics Mei Bai, C-A Department.
APEX Report: March 31 – April 1, 2009 Fulvia Pilat Time Meeting, April 7, 2009.
AGS pp Status Feb. 20, 2015 RSC Meeting Haixin Huang.
11/18/2003Haixin Huang1 RHIC Polarimeter Status All targets and Si detectors have been installed at the end of October. The targets survived the vacuum.
1 Near-term machine performance — The next 5 years, before e-cooling — Wolfram Fischer Run Coordinator for RHIC Run-4 Open Meeting on RHIC Planning Berkner.
AGS Polarized Proton Development toward Run-9 Oct. 3, 2008 Haixin Huang.
AGS PP Progress Haixin Huang January, 3, Haixin Huang2 Daily Activities of Last Week 12/19 Difficulty to bring beam into Booster. Source only pulses.
AGS/Booster PP Setup Plan Jan. 11, 2013 RSC Meeting Haixin Huang.
Overview Run-6 - RHIC Vadim Ptitsyn C-AD, BNL. V.Ptitsyn RHIC Spin Workshop 2006 RHIC Run-6 Timeline  1 Feb – Start of the Run-6. Start of the cooldown.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
RHIC Accelerator Capability: Present and Future Mei Bai Collider Accelerator Dept. BNL.
RHIC Status Haixin Huang Time Meeting 01/18/2011.
Thomas Roser Snowmass 2001 June 30 - July 21, 2001 Polarized Proton Acceleration and Collisions Spin dynamics and Siberian Snakes Polarized proton acceleration.
Injector PP Setup Plan and Status November 18, 2008 Haixin Huang.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
May 17, 2005Wednesday Experiment Meeting BNL, Upton Acceleration beyond 100 GeV  Goal To evaluate the spin dynamics beyond 100 GeV  What’s the impact.
RHIC Run14 Time Meeting. Run14 Status – Apr. 29 Operations running well, 11 full stores over the past 7 days; setting STAR ZDC rates to 50 khz is now.
AGS pp Status Jan. 13, 2015 Time Meeting Haixin Huang.
RHIC Status: Startup Run 12 V. Schoefer RHIC Spin Collaboration Meeting 1/13/12.
Polarized beam in RHIC in Run Polarimetry at RHIC A.Zelenski, BNL PSTP 2011, September 13, St.Petersburg.
Machine status – December 28  Machine status - overview  Blue ring: ramp development  Yellow ring: obstruction update  Set-up and ramp-up.
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Commissioning Samuel Krinsky-Accelerator Physics Group Leader NSLS-II ASAC Meeting October 14-15, 2010.
Spin Injection June 5, 2015 APEX Meeting H. Huang, P. Oddo, V. Ptitsyn.
RHIC Run14 Time Meeting. Run14 Status – Apr. 15 Operations running well, 12 stores over the past 7 days with 1 lost to another “super quench”. Testing.
Beam-Beam and e-Cloud in RHIC Oct. 6, 2015 Haixin Huang, Xiaofeng Gu, Yun Luo.
RHIC Run14 Time Meeting. Run14 Status – Apr. 22 Operations running well, 12 stores over the past 7 days with 1 “super store” of 17 hours. Repositioned.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 12 Apr 2011 Agenda: Open.
APEX Report: February 26-27, 2008 Fulvia Pilat Time Meeting, March 4, 2008.
» RHIC Polarimetry « Oleg Eyser for the RHIC Polarimetry Group 2014 RHIC Retreat, August 14.
Polarized proton projections Wolfram Fischer 11 May 2012 RHIC Spin Collaboration Meeting BNL.
RHIC Run11 Summary May 6, 2011 RSC Meeting Haixin Huang Luminosity Availability Polarization RHIC setup issues.
AGS/Booster PP Setup Status Feb. 5, 2013 Time Meeting Haixin/Vincent.
Feb. 23, 2005Wednesday Experiment Meeting BNL, Upton Status on AGS cold snake  Cold mass is now in the cryostat. It is in the phase of wiring, and because.
APEX RUN-14 APEX Schedule April 1, :00am Store Elens commissioning Gu, Fischer, Luo, Simon 10:00am 4:30pm2:00pm AC dipole setup Bai Momentum Aperture.
Preparation Status of pp Run11 Haixin Huang Time Meeting 12/21/
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
J-PARC Spin Physics Workshop1 Polarized Proton Acceleration in J-PARC M. Bai Brookhaven National Laboratory.
AGS Run-9 Preparations, Status and Plans Dec. 16, 2008 Haixin Huang.
Crossing transition at RHIC V.Ptitsyn, N.Abreu, M. Brennan, M.Blaskiewicz, W. Fischer, C. Montag, R. Lee, S.Tepikian.
Nuclear Phase Transition Diagram Mar RHIC Monday Meeting T. Satogata DOE NSAC Long Range Plan … a whole page! (one out of 14)
RHIC Run14 Time Meeting. Run14 Status – May 27 Operations running well, 11 full stores over the past 7 days. Getting high intensity again from injectors,
RHIC Run14 Time Meeting. Run14 Status – June 24 Run14 He3-Au physics declared on 6/20 with Fill #18460; stochastic cooling is ON for Au beam, longitudinal.
Polarized Proton at RHIC: Status and Future Plan Mei Bai Collider Accelerator Dept. BNL A Special Beam Physics Symposium in Honor of Yaroslav Derbenev's.
Cryo back at 17:30 Beam back at 19:00 IR2 aperture until ~03:00 Since then no beam from the SPS:  Connector problem on MKD  Connector eroded, needs to.
RHIC 250 GeV Polarized Proton Run 2009 Mei Bai RUN website: 12/16/2008RHIC Spin Collaboration Meeting.
RHIC Status April 8, 2011 RSC Meeting Haixin Huang.
RHIC Status and E-lens 101 Spin Collaboration Meeting V. Schoefer 2/6/2015.
Run 10 Start-up Status
Haixin Huang AGS Cold Snake: Status and Plans.
APEX Studies: Accelerating w. Near 3 rd Order Resonance Vincent, Al, Michiko, Steve, Don, Yun, Guillaume, Mei, Todd, Wolfram, Greg, …
RHIC Status Haixin Huang RSC Meeting 02/18/2011. l Fixed the blue dump kicker noise problem last Friday. l Declared physics last Friday. l Smooth run.
Thomas Roser SPIN 2006 October 3, 2006 A Study of Polarized Proton Acceleration in J-PARC A.U.Luccio, M.Bai, T.Roser Brookhaven National Laboratory, Upton,
Status of RHIC Polarization Studies. Summary of Polarization Studies during Run09 Tune scans: – Nearby 0.7 – Near integer tune Polarization ramp measurement.
Plan for 500 GeV Development Vadim, Mei. Goals 1.Explore polarization transmission to the 500 Gev CM energy. 2. Inspect the luminosity aspects (with 2.
APEX RUN-11 APEX Schedule May 11, 2011 Injection 12am8am BBA Minty, Jordan, Liu, Rob, Rob, Kevin, … Spin Flipper Bai, Pablo, Oddo, Craig, Kevin IPM calibration.
APEX Status and Plan Phil’s Meeting, March 20, 2012 M. Bai.
EC plans in connection with eRHIC Wolfram Fischer ILCDR08 – Cornell University, Ithaca, New York 10 July 2008.
Operation Notes APEX Status Fulvia Pilat Machine Experiments Meeting January 20, 2009.
RHIC Status Haixin Huang Time Meeting 01/25/2011.
Polarized Proton Acceleration in the AGS with Two Helical Partial Snakes October 2, 2006 SPIN 2006 H. Huang, L.A. Ahrens, M. Bai, A. Bravar, K. Brown,
MD Report 24 June 2012 Machine coordinators: Barbara Holzer, Mike Lamont MD Coordinators: Ralph Assmann, Giulia Papotti, Frank Zimmermann MD#2 News & Plan.
Summary for LPC (March 7th, Ralph Assmann)
Another Immortal Fill….
Update on MEIC Ion Polarization Work
Presentation transcript:

Preparation for RHIC PP Run in 2011 Wednesday 20, 2010 RHIC Machine Planning Meeting Haixin Huang RUN website: RUN website:

2 Projections for Run11 Polarized Protons For 100 GeV: 8.3 – 10 pb -1 /week, P = 55 – 65%  Beam    m. 1.35*10 11 /bunch For 250 GeV: 18 – 32 pb -1 /week, P = 35 – 50% Beam    m. 1.4*10 11 /bunch The possible gain of polarization is based on the new working point, new vertical survey and BPM offset sign reversal. 2

Run-11 main upgrades for p  -p  performance AGS horizontal tune jump system (up to 5% more polarization if successful) 9 MHz rf system (including 2 longitudinal dampers) (preservation of both longitudinal and transverse emittance, ramp transmission) RHIC MMPS flattop-to-ramp and ramp-to-flattop switchover (transients lead to beam loss and problems with 9 MHz system) Ramp feedbacks (orbit, tune, coupling, chromaticity) Global 1 Hz orbit feedback (tighter tolerances at IPs and collimators) 10 Hz orbit feedback at store (orbit stabilization in triplets, background reduction) CNI Polarimetry (new electronics, mitigates rate dependence)  * reduction from 0.70 m to 0.65 m (perhaps lower) Blue spin flipper (re-commissioning after modifications) Beam dump modification (Q4 quenched with high intensity dumps, pipe inserts) New Be beam pipe in PHENIX (smaller ID – 40 mm vs. 74 mm previously) 3

Lattice Development Status The new lattices with working point near 2/3 have been developed. In addition, the fractional part of the phase advance between IP6 and IP8 for blue ring has been adjusted near a quarter for nonlinear chromaticity compensation. This requires power supply upgrade. Injection and store lattices are developed: Injection: beta* 7.5m Store: 0.65m, others: 7.5m 1 Ramp lattice have been done for both blue and yellow. The blue lattice has been used for dynamic aperture simulation. The injection energy remains the same. As the instability threshold could be lower with 9MHz cavity due to longer bunch, the gamma_tr is lowered by ½ unit using gamma_tr quads. 1. It is possible to squeeze beta* at IP2 to 5m.

Schedule and Run Plan Dry run: mid of November 4 weeks of machine setup Injection setup: 1.5 weeks Trim quad P/S tuning after cool down 2-3 days. Set up injection in each ring (beam + instrumentation) Set up polarimeters Commissioning the 9MHz cavity: 1 week Ramp development: 2 weeks 250 GeV ramp development Store setup Expect overnight stores after 3-3.5weeks RHI C mac hine expe rime nt mee ting

9MHz RF Cavity Commission Plan 9MHz requires upgrade to main PS + bouncer cavity for both rings + longitudinal damper or Landau cavity for each ring. Establish ramps with 28 MHz Set up injection and timing (h=120) ATR synchro Phase detector data for INJECTION_TUNING application Beam Sync clock and WCM application Six-bunch ramps Low level for Bouncers and feedback Check glitch and its ramp-to-ramp variations 28 MHz offset and phasing Develop rebucketing Step up bunch intensity (feedback at injection) Step up number of bunches 6 (from M. Brennan)

7 7/10 resonance 11/16 resonance 3/4 resonance New Working pt RHIC Polarization Transmission to 250GeV These tune scan data have not been simulated yet. Various people are assigned to the job. Mei speculated that D’ difference caused spin tune spread as large as 0.01 which in turn caused the wide width. So far no D’ knob has been found yet. Working pt for 250 GeV run From online polarization measurements

8 Modelling Efforts V. Ranjabar has joined us to carry the simulation going. The goal is to understand the polarization vs. vertical tune (on the ramp) data. F. Meot is working on another spin tracking code called ZGOUBI. The code is slow and will be mostly for AGS simulation and RHIC spin flipper. C. Montag is searching for D’ knob to maintain them the same value at both snakes. But so far no solution yet. X. Gu and Y. Luo are working on dynamic aperture simulation. First pass with blue lattice showed no problem for beta*=0.65m.

RHIC Vertical Survey Results (from Frank Karl) 2.5mm Realignment is going on. The effects on spin dynamics have not been estimated yet.

Rate Problem in Run9 and Solution Run9,  s=500 GeV: M  E  ToF 2 vs Rate (kHz/strip) AGS tests, Mar Problems reproduced at AGS in Run 2010 No problems with new FEE (faster amplifiers) New amplifierOld amplifier 0.1  s10  s

RHIC Polarimetries New FEE (current sensitive preamplifiers): to be replaced before Run 11 Same Si detector except two trip sizes: 2mm and 1mm(test first) Half (blue1 and yellow1) inside, half (blue2 and yellow2) outside Tools for accelerator physicists: ramp measurement New targets (better quality, narrower overall) New targets and new Si detectors installation tentatively slated for early – mid November. DAQ upgrade progressing well, minor work left. New cables have been installed already. Two experts (Igor and Dima) will arrive in the mid-November and working on the sorftware (including the ramp measurement capability). Two postdocs are added to work on offline analysis. One physicist is onboard to work on the online software. A new Si detector will be installed for H jet to replace the damaged one before run9 (increase events by 50%).

12 RHIC Spin Flipper Status and Plan -- Installed in the tunnel: all 4 DC dipoles, all 5 ceramic pipe as well as ac dipole stands -- working progress: 1. Re-terminate all 5 ac dipoles’ litz wire with chemical stripping. All 5 ac dipoles expect to be ready for installation in 3 weeks 2. 2 additional cap-banks and two tuning boxes 3. Boards of ac dipole controllers are about ready to be ordered, waiting or quotes 4. Ac dipole control software development 5. Pulling 2 additional DC cables for DC dipoles as soon as the ceramic pipes are protected -- commissioning plan: 1. Demonstrate single resonance at injection 2. Demonstrate spin flipping at injection and measure spin flipping efficiency at injection 3. Repeat step 2 at store. (From Mei)

Backup Slides 13

(Courtesy of X. Gu & Y. Luo) Dynamic Aperture Simulation on the Ramp Au 100GeV Ramp Proton 250GeV Ramp The situation of pp at 250GeV seems better.

10Hz Orbit Feedback Reduced STAR background Star backgrounds decreased when feedback engaged Feedback engaged during 31.2 GeV physics store March 26, 2010 Microns BPM position : bi8-bh1