Texas Nodal © 2005 - 2006 Electric Reliability Council of Texas, Inc. All rights reserved. 1 Real Time Reliability Must Run Settlements Business Requirements.

Slides:



Advertisements
Similar presentations
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 RT Energy Settlements Mini Market Examples Formulas.
Advertisements

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Day-Ahead Market Ancillary Services Business Requirements.
Credit Updates Vanessa Spells Credit Work Group ERCOT Public
ERCOT Draft NPRR Phase 2 ORDC RATF July 8, ERCOT draft NPRR Phase 2 ORDC Draft NPRR will include the following clarifications or additions: Updates.
9/13/2007 Nodal COMS Extracts & Reports Market Requirements Review SDAWG Jackie Ashbaugh ERCOT ***NOTE: All information contained in this presentation.
1 Appeal to ERCOT Board Regarding Use of Fuel Oil Index Price (FOIP) Larry Gurley TXU Wholesale June 19, 2007.
RCWG Update to WMS April 9, VCMRR-VC for Cancellation of RUC Committed Resources Paragraph (3) of Nodal Protocol Section regarding Cancellation.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Split Generation Resources (SGRs) (Also known as Jointly Owned.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Ancillary Services – Day-Ahead & Real Time Markets Mini Market.
1 Generator Telemetry and Market Prices WebEx Training July 28 th, 2015.
ERCOT RMR Deployment and Cost Proposals By: Matt Mereness and Ino Gonzalez.
NPRRs NPRR680 Allow QSEs to Self-Arrange AS Quantities Greater Than Their AS Obligation. This Nodal Protocol Revision Request (NPRR) proposes to allow.
May 29, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott June 3, 2014 TAC Update to RMS 1.
NPRR 209 Presentation Adrian Pieniazek – NRG Texas Technical Advisory Committee May 6, 2010.
July 30, 2015 TAC Meeting Update to COPS Michelle Trenary August 12, 2015.
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes January 28, 2009 WMS Meeting.
1 How does ERCOT Review, Verify and Approve RMR Costs? (In response to questions that were asked during PRR 632 discussions) Prepared for the
Settlement of Mothballed RMR Resources for System Capacity November 15, 2011 RDTF Meeting Ino González ERCOT November 14, 2011.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee June 4, 2009.
January 14, New logic and invoices used in January 2015 when closing out December 2014 New Bill Determinants: CRRBAFA- CRR Balancing Account Fund.
Presentation to WMS Regarding PRR 731- Fuel Oil Index Price (FOIP) Larry Gurley July 18, 2007.
March 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott April 7, 2015 TAC Update to RMS 1.
1Texas Nodal Texas Nodal Commercial Systems COMS CSD Presentation By ERCOT Wednesday, 1/10/2007.
QMWG – Feb. 26, 2014 Discussion topic: NPRR585 Clarification of Administrative Pricing Requirements for Self-Committed Combined Cycle Combustion Turbines.
Protocol Revision Subcommittee Sandy Morris November 3, 2011.
Quick Start Resource – Payment for Start-Up at less than LSL Current NPRR language: ( 8) If a QSGR comes On-Line as a result of a Base Point less than.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 NPRR to Clarify RUC Capacity Shortfall Ratio Share Formula.
RCWG Update to WMS July 11, Alternatives to Address Negative Prices At its June meeting, WMS directed RCWG to bring back something to vote on. RCWG.
Lead from the front Texas Nodal 1 Texas Nodal Startup Eligibility Day-Ahead and RUC Make-Whole Settlements ERCOT Settlements & Billing.
Lead from the front Texas Nodal 1 Texas Nodal Day-Ahead CRR Settlements Business Requirements TPTF Presentation ERCOT Settlements.
Resource Cost Working Group October 7, 2015 WMS Update.
Credit Updates Vanessa Spells Credit Work Group ERCOT Public February 18, 2015.
Resource Cost Working Group December 2, 2015 WMS Update.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Nodal Verifiable Costs Process WMS Meeting May 15, 2007 Ino.
NPRRs 663NPRR Ancillary Service Insufficiency Actions. This Nodal Protocol Revision Request (NPRR) specifies the actions ERCOT will take to ensure sufficient.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 8, 2008.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Settlement Invoices Business Requirements Settlements and.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Load Frequency Control (LFC) Business Requirements Energy.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Nodal Dispute Management System Business Requirements ERCOT.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee October 1, 2009.
Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8,
1/07/2014 QMWG – RUC and AS update QMWG – ERCOT Update ERCOT Market Analysis.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Verifiable Costs for Nodal WMS Meeting.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Real Time Operations Energy Settlements Business Requirements.
NPRR 649 Board Appeal Koch Ag & Energy Solutions February 9,
Day-Ahead Market Discussion/Clarification TPTF April 24, 2006.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Day-Ahead Mini Market Mini Market Walk Through for Day-Ahead.
Settlement Stability 2015 Q1 Update to COPS- DRAFT Blake Holt ERCOT COPS 07/15/2015.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Reliability Unit Commitment (RUC) Settlements Business Requirements.
Lead from the front Texas Nodal 1 Texas Nodal Market Management System Update on TPTF Comments on MMS Clarification Notes May 21,
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Day-Ahead Market Energy Settlements Business Requirements.
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes November 12, 2008 VCWG Meeting.
Reliability-Must-Run (RMR) Cost Evaluation and Settlement Basis Ino González ERCOT RMR Workshop May 24, 2016.
Settlement of Ancillary Service Infeasibility ERCOT QMWG April 15, 2016.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Real Time Voltage Support Settlements Business Requirements.
Reliability Must Run Resources for Summer Slide 2 RMR for Summer 2011 RMR Contracts for Mothballed Units ERCOT has signed RMR Agreements with two.
Credit Updates ERCOT Public NPRR 612 – Reduction of Cure Period Subsequent to Event of Default –Approved on 12/09/2014 by Board of Directors. Expected.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Settlement Statements and Calendar Business Requirements Settlements.
Commercial Operations Subcommittee (COPS) Update to TAC 4/28/2016
Settlement Update Austin Rosel ERCOT February 27, 2017.
Exceptional Fuel Costs in LMP
NPRRs 815NPRR Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service.  This Nodal Protocol Revision Request (NPRR) revises.
Resource Cost Working Group
General Overview Of Resource Costs
Ancillary Service Trades and Ancillary Service Settlement
Settlement Update Austin Rosel ERCOT October 11, 2017.
RMR Update November 6, /05/2002.
Resource Cost Working Group
Project Update and Summary of Project Priority List (PPL) Activity
Presentation transcript:

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Real Time Reliability Must Run Settlements Business Requirements Settlements and Billing September 12, 2006

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 2 Agenda Relevant Charge Type Calculations Highlights of Business Requirements –Calculation and Charge Type Dependency Chart –Outstanding Issues or Assumptions

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 3 Charge Type Calculations RMR Standby Payment (NP § , NP §9.5.3 (o)) RMR Payment for Energy (NP § , NP §9.5.3 (p)) RMR Adjustment Charge (NP § , NP §9.5.3 (q)) RMR Charge for Unexcused Misconduct (NP § , NP §9.5.3 (r)) RMR Service Charge (NP § , NP §9.5.3 (s))

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 4 Reliability Must Run Charge Type Dependency Chart

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 5 Reliability Must Run Issues Part I Requirement IDFR4 Source Mapping (Protocol/NERC/FERC and other binding documents Ref #)PR (3) Traceability to Sub-Process MapsCSWM.P03SettleBillTransfer Description For the Initial Settlement and resettlements executed before True-up and before actual cost data is submitted, the standby price of an RMR Unit is the “Estimated Standby Cost” stated in the RMR Agreement. For other resettlements, the standby price of an RMR Unit for each hour is calculated as follows: (PR (3)) Within NPRR 009, approved by the Board on 08/15/2006, the RMRMNFC is defined in the Nodal Protocol Equation as RMRMNFCOST and as RMRMNFC in the Variable Table. For the sake of brevity, ERCOT has chosen RMRMNFC as the standardized version of the bill determinant. ERCOT suggests an NPRR be submitted to make the bill determinant in the equation match the bill determinant in the Variable Table. Additionally, the RMRMNFC will be populated with estimated data until actual data has been submitted by the QSE, in order to comply with the Nodal Protocols. RMRSBPR_ _ _ =RMRMNFC_ _ _ / MH_ _ _ * ( 1 + RMRIF * RMRCRF_ _ _ * RMRARF_ _ _ )

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 6 Reliability Must Run Issues Part II Requirement IDFR5 Source Mapping (Protocol/NERC/FERC and other binding documents Ref #)PR (3) PR Traceability to Sub-Process MapsCSWM.P03SettleBillTransfer Description The Incentive Factor payment shall be reduced if (i) the RMR Unit fails to perform to the contracted capacity during a Capacity Test as described in the RMR Agreement and (ii) if in ERCOT’s reasonable determination, such reduction in capacity materially affects reliability. The reduction will be linear, with a two percent (2%) reduction in the Incentive Factor payment for every one percent (1%) of reduced capacity. (PR ) The RMRTCAPA is not defined in the Protocols or the Submitted NPRR; however, this bill determinant is necessary in order to allow Settlements to incorporate the outcome of Operation’s determination of whether the reduction in capacity materially affects the reliability. In the event Operations decides that the capacity reduction does not materially impact reliability, then Operations will submitt an adjusted amount (RMRTCAPA) along with the Capacity Test results. If (RMRTCAPA _ _ _ + RMRTCAP_ _ _ ) ≥ RMRCCAP_ _ _ Then RMRCRF_ _ _ = 1 Otherwise RMRCRF_ _ _ = Max [ 0, 1 – 2 * (RMRCCAP_ _ _ – RMRTCAP_ _ _ ) / RMRCCAP_ _ _ ]

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 7 Requirement IDFR23 Source Mapping (Protocol/NERC/FERC and other binding documents Ref #)PR (1) Traceability to Sub-Process MapsCSWM.P03SettleBillTransfer Description The RMRCEF is not currently in the Protocols but is necessary to allow for the Fuel Adder specified within RMR Contractual Agreement. ERCOT suggests that an NPRR be submitted to add the RMRCEF, fuel adder, to the RMREAMT calculation below. Additionally, ERCOT believes that the intent of the RMREAMT is to be a payment to the Resource; as such, there should be a negative one times the quantity to ensure that this calculation results in a payment to the Resource. ERCOT suggests that a NPRR be submitted to include the (-1). The STARTTYPE bill determinant, defined in the TN.COMS.63C01.STARTUPELIGIBILITY.REQUIREMENTS document, will determine the type of Startup the RMR Resource should receive; additionally, the RMRSUFLAG will determine the eligibility of whether the RMR Resource deserves a startup payment. The Settlement System will create the RMRSUFQ bill determinant from the RMR Contract Data based upon the STARTTYPE bill determinant. RMREAMT_ _ _ =(-1) * [ [( ( FIP + RMRCEFA ) * RMRSUFQ_ _ _ / RMRH_ _ _ ) * RMRSUFLAG_ _ _ ] + [( ( FIP + RMRCEFA ) * RMRHR_ _ _ + RMRVCC_ _ _ ) * RTMG_ _ _ ] ] Reliability Must Run Issues Part III

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 8 Reliability Must Run Issues Part IV Requirement IDFR38 Source Mapping (Protocol/NERC/FERC and other binding documents Ref #)PR (2) Traceability to Sub-Process MapsCSWM.P03SettleBillTransfer Description ERCOT suggests that an NPRR be submitted to remove the language of the RTEIAMT bill determinant and place the language indicated below. The language included is a better representation of the original bill determinant, RTMGAMT, included. RMRAAMT_ _ _ =(-1) * ( (-1) * (RTMG_ _ _ * RTSPP_ ) + EMREAMT_ _ _ + RUCMWAMT_ _ _ + RUCCBAMT_ _ _ + RUCDCAMT_ _ _ + VSSEAMT_ _ _ + VSSVARAMT_ _ _ )

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 9 Questions ?