THEORY OF CONSTRAINTS & DRUM – BUFFER - ROPE
Advertisements

Short-term Capacity Optimization
© 2007 Pearson Education Constraint Management Chapter 7.
Application of the TOC FAL, IE, Seoul National University Eoksu
7 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Constraint Management (Short-term Capacity Planning) 7.
Theory of Constraints Scheduling APICS PDM January 14, 2009.
Theory of Constraints Part II: TOC Concepts
Theory of Constraints. IF: Clients never changed their minds And Vendors always supply, whatever we ask for, on time, And We do not have any absenteeism.
1 Presentation by: Tim Sullivan CIRAS (Center for Industrial Research and Service) Iowa State University Extension.
23–1. 23–2 Chapter Twenty-Three Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
WEEK 05A – CAPACITY PLANNING AND CONTROL (CHAPTER 7S) Definitions, capacity measurement, MRP II and capacity, utilization, efficiency, breakeven SJSU Bus.
Chapter 18 Synchronous Manufacturing and the Theory of Constraints
7 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Constraint Management 7 For Operations Management, 9e by Krajewski/Ritzman/Malhotra.
Rev. 11/30/03SJSU Bus David Bentley1 Chapter 5 – Capacity Planning and Control Definitions, capacity measurement, MRP II and capacity, utilization,
Throughput World. 2 Ardavan Asef-Vaziri Nov-2010Theory of Constraints: 2- Basics Systems Thinking and TOC  TOC Premise 1: The Goal of a business is to.
© The McGraw-Hill Companies, Inc., Synchronous Manufacturing and Theory of Constraints.
Chapter 5 – Capacity Planning and Control
Inventory System Inventory system: the set of policies and controls that monitor levels of inventory and determines: –what levels should be maintained.
Operations Scheduling. Scheduling in a Process-Focused Environment.
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Manufacturing Planning and Control MPC 6 th Edition Chapter.
Operations Management Contemporary Concepts and Cases Chapter Thirteen Scheduling Operations Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights.
1 Slides used in class may be different from slides in student pack Chapter 18 Synchronous Manufacturing and the Theory of Constraints  Goldratt’s Rules.
Introduction to Theory of Constraints Competitive Manufacturing Management.
Ricardo Ernst Top Management Program in Logistics & Supply Chain Management (TMPLSM) Production and Operations Management 6: Theory of Constraints.
Dependent Events and Statistical Fluctuations
Operations and Production Management
Introduction to Theory of Constraints
Introduction to the Theory of Constraints (TOC) & Critical Chain Project Management (CCPM) Major Mark McNabb.
L EAN F LIGHT I NITIATIVE C ONFERENCE ©2012 M. Srinivasan 1 Focusing on Throughput Systems Thinking and the Theory of Constraints Mandyam (“Srini”) Srinivasan.
 Copyright, Ansari, Bell, Klammer and Lawrence, Management Accounting: A Strategic Focus, Irwin-McGraw-Hill, THE THEORY OF CONSTRAINTS AND THROUGHPUT.
Scheduling Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
TOC 1 Theory Of Constraints. TOC 2 Theory of Constraints How does TOC differ from the conventional shop control theory? Throughput definition * Emphasis.
Course: ETLS Managing for Improved Performance Professor: George G. Gleeson Student: Kou Song.
Drum –Buffer-Rope Based on : R. Holt, Ph.D., PE
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1.
Synchronous Manufacturing and Theory of Constraints
The Theory of Constraints
20-1 Inventory Management: Economic Order Quantity, JIT, and the Theory of Constraints 20.
© The McGraw-Hill Companies, Inc., Chapter 17 Synchronous Manufacturing and the Theory of Constraints.
1 Session 18 Implementation of TOC at Tosoh, SMD Laura Blum Production and Inventory Control Manager.
1 Theory of Constraints Short-term Capacity Optimization.
Performance Measurement Financial
Theory of Constraints Part I: Introduction. Theory of Constraints (or TOC) Relatively recent development Looks at the practical aspect of making organizational.
DP Johnson, 2005 Dealing with Production Bottlenecks Mini-case Be Sure To Review Notes Area And Related Word Document Forward to Instructors.
Purposes of Inventory 1. To maintain independence of operations. 2. To meet variation in product demand. 3. To allow flexibility in production scheduling.
Module 10: Theory of Constraints Operations Management as a Competitive Weapon.
Georgijs Buklovskis Member of the Board Association for Business Efficiency, Latvia Plant manager Brabantia Latvia Ltd. BMDA conference, Rīga, May, 8th,
Constraint Management Chapter 7 Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall
QUALITY OF MANAGEMENT GURUs : DR ELIYAHU M. GOLDRATT BY KLUANG MAN GROUP’S MEMBER: ROSMALINA BT HUSSIN (PA13014) NUR HIDAYAH BT AHMAD (PB13062) NOOR FAAIRA.
Introduction to the Theory of Constraints (TOC) & Critical Chain Project Management (CCPM) Major Mark McNabb.
MEL751: Module on Theory of Constraints
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
MODULE 3 Manufacturing Methodologies
Synchronous Manufacturing and Theory of Constraints
Drum –Buffer-Rope Skorkovský Based on : R. Holt, Ph.D., PE.
Introduction to Theory of Constraints
Inventory System Inventory system: the set of policies and controls that monitor levels of inventory and determines: what levels should be maintained when.
The Theory of Constraints
Synchronous Manufacturing
Constraint Management
Chapter 2:Theory of Constraints & ERP
The Goal.
Outline Introduction to Constraints
SE503 Advanced Project Management
Goldratt's Theory of Constraints (TOC)
Theory of Constraints An Introduction
Theory of Constraints Part II: TOC Concepts
Theory of Constraints An Introduction
Theory of Constraint.
Synchronous Manufacturing and Theory of Constraints
Presentation transcript:

Theory of constraints Slovak University of Technology Faculty of Material Science and Technology in Trnava

AKA Synchronized Manufacturing Based on the fact that a system’s outputs are determined by its constraints. Deals with factors limiting company’s ability to achieve goals Theory of Constraints

Limits throughput in operations There are two basic type of constraints:  Physical Example: physical capacity of a machine, raw material  Non-physical Example: demand for a product, corporate procedure, individual’s paradigm for looking at the world Theory of Constraints

Constraints fall into three categories:  Internal Resource Constraint Example: Machines, raw materials, worker  Market Constraint Example: Market demand less than production capacity  Policy Constraint Example: No overtime, dictates rate of production Theory of Constraints

Two types of performance measures are used:  Financial (net profit, ROI, cash flow, productivity, turnover)  Operational Throughput - rate at which money is generated by sales Inventory - money system has invested in materials Operating Expenses - Money the system spends to turn Inventory into Throughput (labor, overhead, other expenses) Theory of Constraints

Examples of financial measurements:  Net Profit = Throughput - Operating Expenses  ROI = (Throughput - Operating Expenses) / Inventory  Productivity = Throughput / Operating Expenses  Turnover = Throughput / Inventory

Theory of Constraints A Five Step Process Identify the system’s constraints. Decide how to exploit the system’s constraints. Subordinate everything else to the above decision. Elevate the system’s constraint. If, in the previous step, a constraint has been broken, go back to step 1 but do not allow inertia to cause a new constraint.

Have less capacity than prior or following work centers Limit production output Remedies  Increase capacity of bottleneck  Develop other routings or subcontract  Schedule throughput to match bottleneck © 1995 Corel Corp. Bottleneck Work Centers

Techniques for Dealing With Bottlenecks Increase capacity of the constraint Ensuring well-trained and cross-trained employees are available to operate and maintain this constraint Developing alternate routings, processing procedures, or subcontractors

Techniques for Dealing With Bottlenecks Moving inspections and tests to a position just before the constraint Scheduling throughput to match the capacity of the bottleneck

Optimized Production Technology OPT Software developed in Israel in the early 1970s by Eliyahu Goldratt Premise - Production bottlenecks are basis for scheduling and planning capacity

Optimized Production Technology OPT Bottleneck Resource - Resource that is scheduled to maximize utilization Non-bottlenecks - Resources with capacity greater than the demand placed on it Capacity Constrained Resource - Resource whose utilization is close to one and could become a bottleneck if not scheduled properly

Optimized Production Technology OPT OPT Rules: 1 Do not balance the capacity -- balance the flow. 2 The level of utilization of a non-bottleneck. resource is not determined by its own potential but by some other constraint in the system. 3 Utilization and activation of a resource are not the same. 4 An hour lost at a bottleneck is an hour lost for the entire system.

Optimized Production Technology OPT OPT Rules: 5 An hour saved at a non-bottleneck is a mirage. 6 Bottlenecks govern both throughput and inventory in the system. 7 The transfer batch may not, and many times should not, be equal to the process batch 8 A process batch should be variable both along its route and in time 9 Priorities can be set only by examining the system’s constraints. Lead times are the result of a schedule.

Drum-Buffer-Rope (DBR) Drum-Buffer-Rope (DBR)is a production control technique to implement the exploiting, subordinating, and elevating steps of TOC. If a system has a bottleneck, its production rate controls the pace of the system, its beat drives the system, hence the name drum for this control point.

Drum-Buffer-Rope (DBR) A buffer is placed in front of the bottleneck to protect the bottleneck from fluctuations and variations in the feeding rate to the bottleneck. The buffer size is measured in standard time required for the bottleneck to process all items in the buffer (rule 6 of OPT: bottlenecks govern both throughput and inventory in the system).

Drum-Buffer-Rope (DBR) The buffer is connected to the raw material dispatching point via a feedback loop called the rope. The dispatching point will release only that amount that will keep the buffer inventory built up.

Drum-Buffer-Rope (DBR) DBR Flow