MMO-SWG #3[Mar 22 2006] BepiColombo Project & MMO Science Schedule H. Hayakawa, Y. Kasaba, M. Kato, T Mukai, and JAXA BepiColombo Project.

Slides:



Advertisements
Similar presentations
AOGS Singapore June 2005 Paper ID: 58-PS-A0321 BepiColombo – Mission to Mercury Mission Overview Rita Schulz Johannes.
Advertisements

The BepiColombo Mission
Telescope Optical Units (TOUs)
DEC JAN FEB MAR APR MAY JUNE JULY AUG SEP OCT NOV DEC JAN 2006 Antenna Design updating Antenna Detailed Design PPDR K.O. PPDR Data Pack. Reflector Panels.
An insertion burn at local noon has the advantage that the spacecraft is kicked into a 11 resonant orbit, with an inexpensive recovery manoeuvre, if the.
BepiColombo: The Italian Scientific Participation Enrico Flamini – Workshop ASI 2008.
MMO: Payload AIV MMO-SWG #3 [March 2006] -1- C. Noshi/RASC, Kyoto Univ. MMO Mercury Magnetospheric Orbiter AIV (Assembly, Integration, Verification) for.
BepiColombo – Mission to Mercury MPO Payload Updates Mission &
Understand how space organizations use concepts of operations and system integration plan to ensure the success of their program Space Concept of Operations.
SGS: Activities and Requests Helen Middleton. Hermean Environment Working Group Meeting | SGS Team | Key Largo | 16/05/2013 | Slide 2 Contents 1.ESAC.
Units of Time Based on Astronomical Motions and Objects Day: New: Time required for the earth to complete one rotation. Week: Based on 7 celestial bodies.
Learn more about the Super Moon phenomenon. Watch this YouTube video.
Nan Wap Marine Protected Area  Located east side of Pohnpei  Is about acers (3.04 km2)  Lies 1.13km off the eastern coast of Metipw.
BepiColombo/MMO: MDP MMO-SWG #3 [March 2006] -1- C. Noshi/RASC, Kyoto Univ. MMO Mercury Magnetospheric Orbiter MDP (Mission Data Processor) for BepiColombo.
MMO-SWG #3[Mar ] PA (Safety & Mission Assurance) Activities for MMO ➢ MMO PA Plan was developed, and it will be distributed to MMO Contractors &
JAXA’s Exploration of the Solar System Beyond the Moon and Mars.
Mercury Observations with MESSENGER Images By: Frank J Melillo.
BepiColombo Data Handling and the Science Archive Based on the presentation in Bepi-SWT #1 in April 2005 ESTEC) [J. Zender (ESTEC), Y. Kasaba (ISAS)]
1 H. Laakso, SERENA - HEWG meeting, Mykonos, Greece, 8-11 June Status of BepiColombo Harri Laakso ESA/ESTEC, Code SRE-OS, Noordwijk, The Netherlands.
Page 1 BepiColombo MMO Status Update For HEWG2014, June 2014.
Cosmic Vision Process Cosmic Vision 2015 –2025 process launched on 2 April 04 with call for Science themes June 04: deadline for proposal submission.
Gantt Chart of Progress FY
Korea Aerospace Research Institute (KARI)
JUpiter Icy Moons Explorer (JUICE)
【New Draft】 France -Japan International Co-funding Joint call Schedule (revised version) APR. 11, 2017 Bpifrance / NEDO final meeting (week of 18/9) Announcement.
10th IPDA Steering Committee Meeting
SPOUSE LEADERSHIP DEVELOPMENT COURSE (SLDC) CLASS 68
Jan 2016 Solar Lunar Data.
CATECHISM CALENDAR 2017 TERM 1 – 21 JAN – 11 MAR
Post mission debrief
NASPL Standards Initiative (NSI)
Analyzing patterns in the phenomena
Average Monthly Temperature and Rainfall
Planetary Protection Management at JAXA
2018 Flag Calendar Online Registration is open

Transit Orbits Kassandra De Voto
Status of CO2 Cooling tests at CERN for Pixel phase 1
Mammoth Caves National Park, Kentucky
SOCIAL DIALOGUE TIMELINE
Gantt Chart Enter Year Here Activities Jan Feb Mar Apr May Jun Jul Aug
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Gantt Chart of Progress FY
IPCC Guidelines and Way Forward
Proposed Strategic Planning Process for FY 2013/14 thru FY 2015/16
GOMACTech-04 Technical Program Committee Timeline
PCS Day - Feedback 23th November 2016, Vienna.
Calendar Year 2009 Insure Oklahoma Total & Projected Enrollment
2018 Flag Calendar Online Registration is open
Electricity Cost and Use – FY 2016 and FY 2017
Safety Group Program Timeline

Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
JUNE 2010 CALENDAR PROJECT PLANNING 1 Month MONDAY TUESDAY WEDNESDAY
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3

Rev. 2 Wireless Local Number Portability and Pooling Phase 2 Implementation Guideline INDUSTRY 2002 SERVICE PROVIDER JAN FEB MAR APR MAY JUN JUL AUG SEP.
Safety Group Program Timeline
XRN Nov 19 Release - Status Update
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Rev. 2 Wireless Local Number Portability and Pooling Phase 2 Implementation Guideline INDUSTRY 2002 SERVICE PROVIDER JAN FEB MAR APR MAY JUN JUL AUG SEP.
Presentation transcript:

MMO-SWG #3[Mar ] BepiColombo Project & MMO Science Schedule H. Hayakawa, Y. Kasaba, M. Kato, T Mukai, and JAXA BepiColombo Project

MMO-SWG #3[Mar ] Mission Scenario MPO Soyuz Fregat 2B: MPO+MMO Red: Blue: Red: Blue: Launch: 2013 (TBC)Arrival: 6 years later (TBC) 9.3h 400km x 12,000km 2.3h 400km x 1500km Observation: 1 Earth year Venus swing-by x 2 Mercury swing-by x 2 Interplanetary Cruising Electric Propulsion [SEPM] Mercury Orbit Insertion Chemical Propulsion [CPM]

MMO-SWG #3[Mar ] Implementation phase [old Ph-B/C/D] Payload Selection Definition phase [old Ph-A/B] Launch B PM (Ph.B) ESA JAXA both ESA JAXA both Technical study Pre- PM1 MMO&MCS STM test JAXA (ISAS) ESA (Calendar year) BepiColombo MMO Schedule (Jan. 2006) PDR E Integrated Test & AIV FM(Ph.C/D) Pre-PM2 PRR B PRR=Preliminary requirements Rev. PDR=Preliminary Definition Rev. CDR=Critical Design Rev. QR=Qualification Rev. MMO-FM at ESTEC (by ESA plan) MMO-STM at ESTEC (by ESA plan) ITT MMO-STM M MMO-EM B MMO-FM B CDR E MIC/EIC B- 6B Sub-Env test B-9E QR E AIV B E E STM test Component Dummy Mercury orbit ~ 2years Now!! RFP AO

MMO-SWG #3[Mar ] January 10 MMO Design Meeting #3(ISAS) Mar 8-9MPO-SWG #3[from Japan: Kato, Hayakawa, Sasaki](ESTEC) Mar 22MMO-SWG #3(Kyoto Univ.) Apr 2-7European Geosciences Union (Vienna) PS2: Mars, Moon, Venus and Mercury Mercury Session : assigned on Apr. 7 (afternoon) May 9-11 ESA-JAXA I/F meeting #15 (ISAS) May Japan Geoscience Union Meeting 2006 (Makuhari) May or June MMO Design Meeting #4 & MMO-SWG #4(ISAS) June 4-11International Sympo. on Space Technology and Science (Kanazawa ) TBDISSI Workshop on Mercury (Switzerland) July Asia Oceania Geoscience Society (Singapore) July COSPAR (Beijing) July Western Pacific Geophysics Meeting (Beijing) Sep 26-28Bepi-SWT #3(Padova, Italy) Oct 2-5 ESA-JAXA I/F meeting #16ESTEC/ESOC Nov ESA-JAXA I/F meeting #17 [Kick Off meeting]ESA's Prime Nov 29-30(TBC)MPO-SWG #4(ESTEC) DecMMO Design Meeting #5 & MMO-SWG #5(ISAS) Dec ESA-JAXA I/F meeting #18(ISAS) Science Meetings in 2006