1 RIC 2009 Current Research Issues in PSA: Korean Status Joon-Eon YANG Integrated Safety Assessment Division Korea Atomic Energy Research Institute 10.

Slides:



Advertisements
Similar presentations
Presented by: Muhammad Ayub Pakistan Nuclear Regulatory Authority Safety Enhancement at Nuclear Power Plants in Pakistan Prospects of Nuclear Energy in.
Advertisements

RISK INFORMED APPROACHES FOR PLANT LIFE MANAGEMENT: REGULATORY AND INDUSTRY PERSPECTIVES Björn Wahlström.
April PART I : Status of nuclear industry in Korea PART II : Romania-Korea Cooperation status PART III : Cooperation with Korea PART I : Status.
NRC Research on Digital System Reliability Modeling for Use in a PRA
IAEA/INIS Activities in Korea and Larchiveum of KAERI 15 October 2014 Dr. Ji Ho Yi.
IAEA International Atomic Energy Agency Human Resources Development for Nuclear Safety J. Bastos NSNI/RAS.
Nuclear Training & Education Center
TACSS Workshop Korea’s Experience on Nuclear Technology Transfer, Its Indigenous Development and Future Planning 19 September 2006 Poong Eil Juhn, Ph.D.
IAEA International Atomic Energy Agency US NRC Approach for Seismic Hazard Assessments INTERNATIONAL WORKSHOP ON LESSONS LEARNED FROM STRONG EARTHQUAKES.
Technical Meeting on Evaluation Methodology for Nuclear Power Infrastructure Development December, 2008 Nuclear Safety in Infrastructure Building.
Regulatory Approach to the Lifetime Management of the Nuclear Power Plants in Korea June 30, 2004 Choi, Kyung Woo Korea Institute of Nuclear Safety International.
Nuclear Energy in Korea
U.S. DOE Light Water Reactor Sustainability Program: Advanced Instrumentation & Controls and Human System Interfaces Research Pathway Bruce Hallbert, Idaho.
Thailand NUCLEAR POWER PROGRAM INFRASTRUCTURE AND STATUS OF IMPLEMENTATION: Regulatory Body Prof. Dr. Chaivat TOSKULKAO Secretary General Office of Atoms.
Technical Working Group on Nuclear Power Plant Instrumentation and Control Vienna, May 2009 NATIONAL REPORT ON NUCLEAR POWER PLANT INSTRUMENTATION AND.
1 The U.S. NRC’s Reactor Certification and Licensing Process – Meeting the Challenge? Commissioner Peter B. Lyons U.S. Nuclear Regulatory Commission 15.
Development of Cyber ALARA Program 2012 ISOE Asian ALARA Symposium Choi, Hoon Radiation Health Research Institute Korea Hydro-Nuclear Power Company.
Energy Forum 2011, Changing the Energy Paradigm and Outlook for South-Eastern EU Energy Forum 2011 Nuclear Safety Regulation in Romania Recent Developments.
SÄTEILYTURVAKESKUS STRÅLSÄKERHETSCENTRALEN RADIATION AND NUCLEAR SAFETY AUTHORITY Role of the TSO in Public Information/ Debate Openness, Transparency.
(Workshop on Level 2 PSA and Severe Accident Management, March 2004 ) 1 International Workshop On Level 2 PSA and Severe Accident Management Hosted by:
School for Drafting Regulations on Radiation Safety Vienna, November 2012 EU Requirements Jiří Veselý, SONS, Czech republic.
Operating Experience Feedback Process in Korea May 30, 2006 Korea Institute of Nuclear Safety – focusing on closing the feedback loop - Kim, MinChull Operational.
IAEA International Atomic Energy Agency. IAEA Outline Learning Objectives Introduction IRRS review of regulations and guides Relevant safety standards.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
Current Status and Challenging Issues of Nuclear Energy in Korea Park, Yong Taek President & CEO Korea Power Engineering Company, Inc. 18th World Energy.
Fukushima Lessons Learnt and Follow-up Activities of Rostechnadzor Alexey Ferapontov, Acting Chairman Second European Nuclear Safety Conference
International Relations (9) Nuclear Power in ROK 김 병 구
IAEA I&C Activities Presented by Björn Wahlström, Chairman TWG-NPP CI.
1 PRA Research to Enhance Decision-Making John Monninger, Deputy Director Division of Risk Analysis Office of Nuclear Regulatory Research, NRC.
International Atomic Energy Agency M. El-Shanawany IAEA Technical Support & Capacity Building Programme M. El-Shanawany Department of Nuclear Safety &
P1. Overview of Objectives & Agenda of Technical Meeting
Korea & the World (9) Nuclear Power in ROK 김 병 구
Korea & the World (9) Nuclear Power in ROK 김 병 구
Current Status of the National Nuclear Infrastructure and Human Resources Development in the Republic of Belarus TM/WS on Topical Issues on Infrastructure.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Diablo Canyon NPP Probabilistic Risk Assessment Program Workshop Information.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making PSA Applications Methodologies and Approaches. Status in OECD Countries Workshop.
Marco Antonio Bayout Alvarenga National Commission of Nuclear Energy (CNEN), Brazil 14 December 2015 Experience in the use of Human Factors Engineering.
Role of Self-Assessment V.C. Agarwal, Director (HR) NPCIL,INDIA.
Report on Spent Fuel Research and Analysis in the Republic of Korea Jungmin KANG CISAC, Stanford University EASSC 2006 Meeting Beijing, China, November.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA Workshop Safety Assessment Process. Plant Modification.
IAEA International Atomic Energy Agency Development of the Basis Document for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
Low Power and Shutdown PSA IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA Workshop City, Country.
DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM Vuong Huu.
Initiating Event Analysis IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA Workshop City, Country.
NLSSI and Current Seismic R&D Justin Coleman, P.E. Nuclear Science and Technology Idaho National Laboratory October 7 th and 8 th, 2015.
Workshop on Risk informed decision making on nuclear power plant safety January 2011 SNRC, Kyiv, Ukraine Practical examples of RIDM application.
International Atomic Energy Agency Implementation of a Risk-Informed Approach into the Legislative and Regulatory Framework SNRCU Annual Topical Meeting.
Workshop on Risk informed decision making on nuclear power plant safety January 2011 SNRC, Kyiv, Ukraine Benefits and limitations of RIDM by Géza.
Post-Fukushima Severe Accident Management Update Kim, Hyeong Taek KHNP- Central Research Institute July KINS Safety Analysis Symposium.
July 11-13, 2005 Chan-Hee Cho Korea Electric Power Research Institute Data Analysis Performance Demonstration in Korea.
The Risk of Nuclear Power Soon Heung Chang Handong Global University Oct 4, 2016 Soon Heung Chang Handong Global University Oct 4, th International.
Status and Prospect of Korean Korea Electric Power Research Institute
SOUTH AFRICA Training and Tutoring Feedback
JSC Atomenergoproekt, Moscow, RF
János Krutzler Hungarian Atomic Energy Authority
THAILAND Training and Tutoring Feedback
Legislative and Regulatory Framework in Korea
MALAYSIA Training and Tutoring Feedback
Maximum and Minimum Nuclear Power Paths for the Republic of Korea
The Nuclear Power Sector in the Republic of Korea: Nuclear Materials Management/ Fuel Cycle Practices, Plans and Policies Jungmin KANG CISAC, Stanford.
Brazil - Training and Tutoring Feedback Second Coordination Meeting
Role of the TSO in Public Information/ Debate Openness, Transparency Technical support to regulatory body for the new NPP (OL3) project Keijo Valtonen.
Dept. of Nuclear and Quantum Engineering
Complementarity of deterministic and probabilistic approaches
Armenia Training and Tutoring Feedback
Challenge of Nuclear Governance
USNRC IRRS TRAINING Lecture18
Group 1 - HOF regulatory oversight program Strategy
IAEA Technical Support & Capacity Building Programme M. El-Shanawany
A Canadian Perspective
Presentation transcript:

1 RIC 2009 Current Research Issues in PSA: Korean Status Joon-Eon YANG Integrated Safety Assessment Division Korea Atomic Energy Research Institute 10 Mar. 2009

2 Contents Current Korean Status R&D for PSA & its Applications in Korea R&D Results Future Directions

3 Korean Organizations Related to Nuclear Program KAERI (Korea Atomic Energy Research Institute) –The Government Funded Research Institute KINS (Korea Institute of Nuclear Safety) –The Institute supporting the Regulatory Body (Ministry of Education, Science & Technology) KHNP (Korea Hydor. & Nuclear Power) –The Utility that owns all NPPs of Korea

4 Building New Plants –6 under construction, 2 under licensing review process From PSA to RIPBA –Severe Accident Policy Statement –From Generic to Specific Seoul Kori Ulchin Wolsong Yonggwang (As of Mar. 2008) In operation Planned Under license review Gen III(OPR-1000) Under construction Gen II Gen III+(APR1400) Kori ( CANDU) Current Korean Status

5 On-going Programs in Korea PSA –Level 2 PSAs for all units have been finished & being updated Risk-informed Applications –RI-ISI: Under Review of Regulatory Body –RI-TS: Extension of STI of ESFAS/RPS Permitted for some NPPs New Projects are on-going for other NPPs (AOT Extension of EDG) –RI-ILRT Performance-monitoring –MR: Standardized MR Approach is being tested by KHNP Regulatory Activity –Guidelines for RIR & PSA Quality –RIPI (Risk-informed Periodic Inspection) is being tested by KINS

6 the RIPBA in Korea –Ex.) Korean Specific RIPBA Framework (No ROP/MR) Ex.) PSA Quality Issues the licensing/RI-Design of new NPPs –Ex.) Digital I&C PSA –Ex.) RI-Design Framework resolving some social issues –Ex.) Human Induced Trip  Human Performance –Ex.) Seismic PSA tech. that we are good at –Ex.) PSA S/W (FTREX/FORTE & BDD) We need R&D on PSA for

7 R&D Topics in Korea ChallengesCurrentAnticipated Assessment (Uncertainty) Digital I&C PSA Seismic PSA (Plant Specific) HRA & Human Performance (OPERA/TACOM) CCF Analysis Other External Events (Shrimp) MPAS (PSA Model for Reg.) Performance Assessment Quantification Algorithm (BDD) Level 2 PSA: Severe Accident in New NPP Level 3 PSA: Korean Specific Model Passive System Reliability ConsistencyIntegration of Internal & External PSA Risk/Performance Measures Integrated Assessment of Risk & Performance PSA based RI-PP/PR ConveniencePSA/RIA Tools Tools to enhance Transparency Quantification Algorithm (External) FrameworkKorean Specific RIPBA Framework RI-Design Framework Reg. Framework for New Rx. (Ex. Tech. Neutral)

8 R&D Results Integration of Internal & External PSA Model –A S/W for the Automatic Generation of External PSA Model (AIMS) One Top Internal PSA Model + Fire DB  One Top Fire PSA Model –New Quantification Algorithm for External PSA Model (JSTAR) Integrated Assessment of Risk & Performance –Detailed FT Model for BOP FREX –ZBDD based –EPRI R&R: CAFTA + FTREX Digital I&C PSA –DI&C Induced IE DB –Rel. Analysis Methods for HW/SW –HRA for Digitalized MCR Based on the trainings at simulator of advanced reactor Enhancing Human Performance –OPERA DB video taped >100 cases of operator trainings at simulator –Complexity Measure: TACOM Seismic PSA –Korean Specific Hazard Curve –Seismic PSA Code –Shaking Table Exp. for Digital MCC

9 Future Direction??